  1. Slide 1: Advanced Stage Copper Developer – Powering the Green Revolution

    Slide 1: Advanced Stage Copper Developer – Powering the Green Revolution

    TSX: ATCU | OTCQX: ATCUF www.altacopper.com June 2025 ADVANCED STAGE COPPER DEVELOPER POWERING THE GREEN REVOLUTION

  2. Slide 2: Cautionary Language – Forward Looking Statements

    Slide 2: Cautionary Language – Forward Looking Statements

    CAUTIONARY LANGUAGE – FORWARD LOOKING STATEMENTS The material contained in this presentation is provided solely for your general knowledge and is not intended to be a comprehensive review of all matters and developments concerning Alta Copper Corp. (“Alta”) or its affiliates. Alta has taken all reas

  3. Slide 3: Alta Copper – Why Invest?

    Slide 3: Alta Copper – Why Invest?

    ALTA COPPER – WHY INVEST? • One of the world’s largest undeveloped copper deposits not held by a major • Cañariaco Norte Resource (See Note 1) : 9.3B lbs Cu, 2.2M oz Au, 60.4M oz Ag Measured & Indicated 2.4B lbs Cu, 0.5M oz Au, 16.9M oz Ag Inferred • Cañariaco Sur Resource (See Note 1) : 2.5B lbs Cu

  4. Slide 4: Alta Copper – Short Term Catalyst

    Slide 4: Alta Copper – Short Term Catalyst

    ALTA COPPER – SHORT TERM CATALYST • Preliminary Economic Assessment (“PEA”) showing Robust Economics → Completed May 2024 • Reconstitution of Board of Directors and Senior Management Changes → July 2024 • Drill Permit Application (“DIA” & “ESIA”) Submitted December 2023 → Approved October 2024 • Cer

  5. Slide 5: Cañariaco – Rapid Timeline to Construction

    Slide 5: Cañariaco – Rapid Timeline to Construction

    CAÑARIACO – RAPID TIMELINE TO CONSTRUCTION TSX: ATCU | OTCQX: ATCUF 05

  6. Slide 6: Corporate Structure

    Slide 6: Corporate Structure

    CORPORATE STRUCTURE Capital Structure – June 2025 (Stated in Millions) Shareholder Registry Shares Issued and Outstanding 94.1 Funds & Family Peruvian High Net Offices: 10.9 % Options 4.2 Worth:15.3 % Director & Officers: 3.1 % RSU and DSU 0.4 Total Shares - Fully Diluted 98.7 Market Capitalization

  7. Slide 7: Cañariaco PEA Highlights

    Slide 7: Cañariaco PEA Highlights

    CAÑARIACO PEA HIGHLIGHTS $3.85/lb Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb Cu After-Tax NPV8% After-Tax NPV88% After-Tax NPV88% After-Tax NPV88% US$2,088M US$2,346M US$3,197M US$4,045M After-Tax IRR After-Tax IRR After-Tax IRR After-Tax IRR 22.6% 24.1% 28.9% 33.4% Pre-Tax NPV8% Pre-Tax NPV8% Pre-Tax NPV8

  8. Slide 8: Cañariaco Detailed PEA Results

    Slide 8: Cañariaco Detailed PEA Results

    CAÑARIACO DETAILED PEA RESULTS Metric Unit of Measure Year 1 -10 LOM Cu % 0.41 0.35 Au g/t 0.08 0.07 Ag g/t 1.86 1.59 Cu Equivalent % 0.48 0.41 Metal Production Cu % 3,469 8,026 Au g/t 696 1,674 Ag g/t 14,978 33,219 Average Process Recovery (Note 1) Cu % 89.2 88.2 Au % 66.4 63.3 Ag % 58.5 55.3 Physi

  9. Slide 9: Cañariaco and Copper Developer Peers

    Slide 9: Cañariaco and Copper Developer Peers

    CAÑARIACO AND COPPER DEVELOPER PEERS Alta Copper Arizona Ivanhoe Western Faraday Los Andes Filo (Acquired) Hot Chili McEwen Sonoran Electric Copper Copper Copper Market Capitalization (C$M) $53 $351 $1,411 $330 $4,375 $160 $74 $700 $168 Copper Asset Name Cañariaco Cactus Santa Cruz Casino Filo del S

  10. Slide 10: Company Benchmarking - P/NAV

    Slide 10: Company Benchmarking - P/NAV

    COMPANY BENCHMARKING - P/NAV Alta Copper is currently trading at a large discount when compared to copper peers Ratio | Price/NAVPS | Bubbles indicate expected production start year 2029 2029 2030 2028 2027 2029 2026 2028 2028 2026 2034 0.72x 0.74x 0.51x 0.42x 0.31x 0.24x 0.25x 0.28x 0.28x 0.09x 0.0

  11. Slide 11: Company Benchmarking - NPV/Initial Capex

    Slide 11: Company Benchmarking - NPV/Initial Capex

    COMPANY BENCHMARKING - NPV/ Initial Capex Cañariaco displays strong economics, generating NPV for lower capital compared to its peers Ratio | Initial Capex (US$M)/After-Tax NPV8% (US$M) | Bubble size based on annual copper equivalent production(1) 3.5x Cactus Arizona Sonoran 3.0x 2.5x Cascabel SolGo

  12. Slide 12: Company Benchmarking - NPV/Total Capex

    Slide 12: Company Benchmarking - NPV/Total Capex

    COMPANY BENCHMARKING - NPV/ Total Capex Cañariaco displays strong economics, generating NPV for lower capital compared to its peers Ratio | Initial Capex (US$M)/After-Tax NPV8% (US$M) | Bubble size based on annual copper equivalent production(1) 1.2x Catcus Arizona Sonoran 1:1 NPV/CAPEX Cascabel Cañ

  13. Slide 13: Capital Intensity - Total Capex

    Slide 13: Capital Intensity - Total Capex

    CAPITAL INTENSITY - Total Capex Cañariaco possess a strong production profile with low capital intensity (based on average annual copper equivalent production)(1) Capital Intensity (US$/t) | Bubble size based on annual copper equivalent production(1) $60,000 Copper Creek Faraday Copper $45,000 Casca

  14. Slide 14: Capital Intensity - Total Capex

    Slide 14: Capital Intensity - Total Capex

    CAPITAL INTENSITY - Total Capex Cañariaco possess a strong production profile with low capital intensity (based on daily mill capacity) Capital Intensity (US$/t) | Bubble size based on daily mill capacity $100,000 Copper Creek Faraday Copper $80,000 Cascabel SolGold $60,000 Costa-Fuego Copper World

  15. Slide 15: Mine Life vs Capital Intensity (Initial)

    Slide 15: Mine Life vs Capital Intensity (Initial)

    MINE LIFE vs CAPITAL INTENSITY (INITIAL) Cañariaco has a robust mine life with low capital intensity, meaning lower risks and costs leading to production (based on daily mill capacity) Years | Capital Intensity (US$/t) | Bubble size based on daily mill capacity $100,000 $80,000 McIlvenna Bay Foran M

  16. Slide 16: Cañariaco Project – Location and Access

    Slide 16: Cañariaco Project – Location and Access

    CAÑARIACO PROJECT – LOCATION AND ACCESS • The Cañariaco Copper-Gold project is located in the Cañaris District of the Province of Ferreñafe, Lambayeque, near the top of the continental divide. • The project is approximately 700 km northwest of Lima, the capital of Peru, and 102 km northeast the city

  17. Slide 17: Cañariaco Project - Location

    Slide 17: Cañariaco Project - Location

    CAÑARIACO PROJECT - LOCATION • 100% owned, 91 Km2 concession within a prolific trend of known copper and gold deposits surrounded by major multibillion dollar mining projects. • The mineralized belt includes several world-class, multi-billion dollar producing mines owned by majors: • Gold Fields - C

  18. Slide 18: Cañariaco Project – Resource Expansion

    Slide 18: Cañariaco Project – Resource Expansion

    CAÑARIACO PROJECT – RESOURCE EXPANSION Significant Upside Recent 3D Geological Last Drilled in 2013 Remains Modelling Several Cumulative Drilling to Expansion Drill Targets Date of 85,000 Meters TSX: ATCU | OTCQX: ATCUF 18

  19. Slide 19: Cañariaco Project – Resource Estimate

    Slide 19: Cañariaco Project – Resource Estimate

    CAÑARIACO PROJECT – RESOURCE ESTIMATE Cañariaco Norte and Sur are two deposits within a much larger district-scale project → both resources are open at depth and laterally • Cañariaco Norte mineralization starts at surface, and has a low strip ratio (1.33:1); grade and strip ratio drive project econ

  20. Slide 20: Cañariaco Trend – Two Resources, How Many Deposits?

    Slide 20: Cañariaco Trend – Two Resources, How Many Deposits?

    CAÑARIACO TREND – TWO RESOURCES, HOW MANY DEPOSITS? Current Mineral Resource is district-scale extending over 5km length and open in all directions laterally and at depth Cañariaco Norte • Measured & Indicated: 9.3B lbs Cu | 2.2M oz. Au | 60.4M oz. Ag • Inferred: 2.4B lbs Cu | 0.5M oz. Au | 16.9M oz

  21. Slide 21: Cañariaco Trend – Two Resources, How Many Deposits?

    Slide 21: Cañariaco Trend – Two Resources, How Many Deposits?

    CAÑARIACO TREND – TWO RESOURCES, HOW MANY DEPOSITS? A’ SATELLITE IMAGE Cañariaco Norte Cañariaco Sur Quebrada Verde A’ TSX: ATCU | OTCQX: ATCUF 21

  22. Slide 22: Drilling Planned and Historical Long-Section A – West View

    Slide 22: Drilling Planned and Historical Long-Section A – West View

    DRILLING PLANNED AND HISTORICAL LONG-SECTION A – WEST VIEW A’ Quebrada Verde A’ Cañariaco Sur Cañariaco Norte Undrilled Legend Undrilled Planned Drilling Drillholes Cu % Undrilled 500 m TSX: ATCU | OTCQX: ATCUF 22

  23. Slide 23: Norte 3D Leapfrog Model Section B Plan View

    Slide 23: Norte 3D Leapfrog Model Section B Plan View

    CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION B PLAN VIEW Proposed Pit Shell 0.7% Cu B’ B’ 0.5% Cu 0.3% Cu Legend Planned Drilling Grade Drillholes Cu % Shells Cu % 0.7 0.5 300 m 0.3 TSX: ATCU | OTCQX: ATCUF 23

  24. Slide 24: Norte 3D Leapfrog Model Section B North View

    Slide 24: Norte 3D Leapfrog Model Section B North View

    CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION B NORTH VIEW C06-058 C07-140 C07-141 B’ 495 m at 0.52 %Cu 255 m at 0.65 %Cu B’ 755 m at 0.56 %Cu Including: Including: Including: 216 m at 0.65 %Cu 59 m at 1.03 %Cu 292 m at 0.71 %Cu Ends in mineralization Ends in mineralization Ends in mineralization Untest

  25. Slide 25: Norte 3D Leapfrog Model Section D Plan View

    Slide 25: Norte 3D Leapfrog Model Section D Plan View

    CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION D PLAN VIEW D’ Proposed Pit Shell 0.7% Cu 0.5% Cu 0.3% Cu Legend Planned Drilling Grade Drillholes Cu % Shells Cu % 0.7 0.5 300 m D’ 0.3 TSX: ATCU | OTCQX: ATCUF 25

  26. Slide 26: Norte 3D Leapfrog Model Cross Section D West View

    Slide 26: Norte 3D Leapfrog Model Cross Section D West View

    CAÑARIACO NORTE 3D LEAPFROG MODEL CROSS SECTION D WEST VIEW D’ C07-141 C07-140 C06-058 D’ 755 m at 0.56 %Cu 255 m at 0.65 %Cu 495 m at 0.52 %Cu Including: Including: Including: 292 m at 0.71 %Cu 59 m at 1.03 %Cu 216 m at 0.65 %Cu Ends in mineralization Ends in mineralization Ends in mineralization U

  27. Slide 27: Cañariaco Project Timeline

    Slide 27: Cañariaco Project Timeline

    CAÑARIACO PROJECT TIMELINE CAÑARIACO PROJECT TIMELINE 2023 DESCRIPTION 2024 2025 2026 2027 2028 Q3 Q4 Optimized PEA – Completed May’24 DIA – EISA | CIRAS – Approved Oct.’24 Social License Advancing 2 Phases of up to 20,000 Meters Increasing NPV/Initial Capex Ratio Feasibility Study EIA and Initial P

  28. Slide 28: Cañariaco Project – Mining in Peru

    Slide 28: Cañariaco Project – Mining in Peru

    CAÑARIACO PROJECT – MINING IN PERU PERU MINING INVESTMENT • Second Largest Copper Producer After Chile • Recent Announcements: ”Mining is the backbone of Peru’s economy, accounting for 60 per cent of exports and about 10 percent of gross domestic product. In recent months, the government of Boluarte

  29. Slide 29: Experienced Leadership Team

    Slide 29: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM GIULIO T. BONIFACIO DALE FOUND, CPA, CA, FCA (UK) ALDO BENDEZU, PhD, Geologist Engineer President, Chief Executive Officer & Director Vice President, Chief Financial Officer Principal Geologist & Project Manager • 30 plus years in senior executive roles in global • 30 yea

  30. Slide 30: Experienced Leadership Team

    Slide 30: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM STEVEN LATIMER, MBA, HBA, CFA CHRISTINE NICOLAU ANDREW HAMILTON, BENG. (MECH) CFA – Non-Executive Chair & Director Director Director • Current Managing Director and Head of the • Group Manager Corporate Portfolio Management • Technical Director, Corporate Strategy Team, A

  31. Slide 31: Appendix

    Slide 31: Appendix

    APPENDIX TSX: ATCU | OTCQX: ATCUF 31

  32. Slide 32: Note Disclosure – Mineral Resource Estimate

    Slide 32: Note Disclosure – Mineral Resource Estimate

    NOTE DISCLOSURE – MINERAL RESOURCE ESTIMATE NOTES : MINERAL RESOURCE ESTIMATE – CAÑARIACO NORTE & SUR 1. Cañariaco Norte - Copper equivalent grades including contributions from gold and silver, were estimated using metal prices of copper: US$4.25/lb, gold: US$1,950 /oz, and silver: US$23.00/oz), met

  33. Slide 33: Cañariaco Project Capital – Low Capital Intensity

    Slide 33: Cañariaco Project Capital – Low Capital Intensity

    CAÑARIACO PROJECT CAPITAL – LOW CAPITAL INTENSITY • Open pit mine with conventional crush/grind and Cost Area Initial Capital Sustaining TOTAL flotation technology (US$M) • Conventional drill and blast mining, large scale Mine 429 186 615 electric shovels and haul trucks • Low Capital Intensity: Pro

  34. Slide 34: Cañariaco Operating Costs

    Slide 34: Cañariaco Operating Costs

    CAÑARIACO OPERATING COSTS • Open pit mine with conventional crush, grind and Life of Mine Operating Costs Summary flotation technology Area Unit US$ Unit US$/lb Cu • C1 costs at US$1.82/lb Life of Mine (net of by- On-site Costs products) Mining $/t milled 5.37 lb Cu 0.79 • AISC at US$1.92/lb Life of

  35. Slide 35: Have Questions – Get in Touch with Alta Copper Corp.

    Slide 35: Have Questions – Get in Touch with Alta Copper Corp.

    TSX: ATCU | OTCQX: ATCUF HAVE QUESTIONS GET IN TOUCH WITH ALTA COPPER CORP. Giulio T. Bonifacio President & CEO gtbonifacio@altacopper.com 604-318-6760 Telephone: 604-689-1957 / 1-877-689-1964 Email: info@altacopper.com www.altacopper.com

Source: Internet Archive copy of altacopper.com