Alta Copper — Investor Presentation (September 2025)
36 slides from Alta Copper's investor presentation, September 2025

Slide 1: Advanced Stage Copper Developer – Powering the Green Revolution
TSX: ATCU | OTCQX: ATCUF www.altacopper.com September 2025 ADVANCED STAGE COPPER DEVELOPER POWERING THE GREEN REVOLUTION

Slide 2: Cautionary Language – Forward Looking Statements
CAUTIONARY LANGUAGE – FORWARD LOOKING STATEMENTS The material contained in this presentation is provided solely for your general knowledge and is not intended to be a comprehensive review of all matters and developments concerning Alta Copper Corp. (“Alta”) or its affiliates. Alta has taken all reas

Slide 3: Alta Copper – Why Invest?
ALTA COPPER – WHY INVEST? • One of the world’s largest undeveloped copper deposits not held by a major • Cañariaco Norte Resource (See Note 1) : 9.3B lbs Cu, 2.2M oz Au, 60.4M oz Ag Measured & Indicated 2.4B lbs Cu, 0.5M oz Au, 16.9M oz Ag Inferred • Cañariaco Sur Resource (See Note 1) : 2.5B lbs Cu

Slide 4: Alta Copper – Short Term Catalyst
ALTA COPPER – SHORT TERM CATALYST • Preliminary Economic Assessment (“PEA”) showing Robust Economics → Completed May 2024 • Reconstitution of Board of Directors and Senior Management Changes → July 2024 • Drill Permit Application (“DIA” & “ESIA”) Submitted December 2023 → Approved October 2024 • Cer

Slide 5: Cañariaco – Rapid Timeline to Construction
CAÑARIACO – RAPID TIMELINE TO CONSTRUCTION TSX: ATCU | OTCQX: ATCUF 05

Slide 6: Corporate Structure
CORPORATE STRUCTURE Capital Structure – September 2025 (Stated in Millions) Shareholder Registry Shares Issued and Outstanding 94.1 Funds & Family Peruvian High Net Offices: 10.9 % Options 4.3 Worth:15.3 % Director & Officers: 3.1 % RSU and DSU 0.6 Total Shares - Fully Diluted 99.0 Market Capitaliza

Slide 7: Cañariaco PEA Highlights
CAÑARIACO PEA HIGHLIGHTS $3.85/lb Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb Cu After-Tax NPV8% After-Tax NPV88% After-Tax NPV88% After-Tax NPV88% US$2,088M US$2,346M US$3,197M US$4,045M After-Tax IRR After-Tax IRR After-Tax IRR After-Tax IRR 22.6% 24.1% 28.9% 33.4% Pre-Tax NPV8% Pre-Tax NPV8% Pre-Tax NPV8

Slide 8: Cañariaco Detailed PEA Results
CAÑARIACO DETAILED PEA RESULTS Metric Unit of Measure Year 1 -10 LOM Cu % 0.41 0.35 Au g/t 0.08 0.07 Ag g/t 1.86 1.59 Cu Equivalent % 0.48 0.41 Metal Production Cu % 3,469 8,026 Au g/t 696 1,674 Ag g/t 14,978 33,219 Average Process Recovery (Note 1) Cu % 89.2 88.2 Au % 66.4 63.3 Ag % 58.5 55.3 Physi

Slide 9: Cañariaco and Copper Developer Peers
CAÑARIACO AND COPPER DEVELOPER PEERS Alta Copper Arizona Ivanhoe Western Faraday Los Andes Filo (Acquired) Hot Chili McEwen Sonoran Electric Copper Copper Copper Market Capitalization (C$M) $55 $455 $1,623 $431 $4,375 $335 $110 $800 $227 Copper Asset Name Cañariaco Cactus Santa Cruz Casino Filo del

Slide 10: Company Benchmarking - P/NAV
COMPANY BENCHMARKING - P/NAV Alta Copper is currently trading at a large discount when compared to copper peers Ratio: Price/NAVPS | Bubbles indicate expected production start year 2029 2029 2030 2028 2027 2029 2026 2028 2028 2026 2034 0.72x 0.74x 0.51x 0.42x 0.31x 0.24x 0.25x 0.28x 0.28x 0.09x 0.01

Slide 11: Company Benchmarking - NPV/Total Capex
COMPANY BENCHMARKING - NPV/ Total Capex Cañariaco displays strong economics, generating NPV for lower capital compared to its peers Ratio: Initial Capex (US$M)/After-Tax NPV8% (US$M) | Bubble size based on annual copper equivalent production(1) 1.2x Catcus Arizona Sonoran 1:1 NPV/CAPEX Cascabel Caña

Slide 12: Capital Intensity - Total Capex
CAPITAL INTENSITY - Total Capex Cañariaco possess a strong production profile with low capital intensity (based on average annual copper equivalent production)(1) Capital Intensity (US$/t) | Bubble size based on annual copper equivalent production(1) $60,000 Copper Creek Faraday Copper $45,000 Casca

Slide 13: Capital Intensity - Total Capex (Daily Mill Capacity)
CAPITAL INTENSITY - Total Capex Cañariaco possess a strong production profile with low capital intensity (based on daily mill capacity) Capital Intensity (US$/t) | Bubble size based on daily mill capacity $100,000 Copper Creek Faraday Copper $80,000 Cascabel SolGold $60,000 Costa-Fuego Copper World

Slide 14: Mine Life vs Capital Intensity (Initial)
MINE LIFE vs CAPITAL INTENSITY (INITIAL) Cañariaco has a robust mine life with low capital intensity, meaning lower risks and costs leading to production Years | Capital Intensity (US$/t) | Bubble size based on daily mill capacity $100,000 $80,000 McIlvenna Bay Foran Mining Corp $60,000 Filo del Sol

Slide 15: Cañariaco Project – Location and Access
CAÑARIACO PROJECT – LOCATION AND ACCESS • The Cañariaco Copper-Gold project is located in the Cañaris District of the Province of Ferreñafe, Lambayeque, near the top of the continental divide. • The project is approximately 700 km northwest of Lima, the capital of Peru, and 102 km northeast the city

Slide 16: Cañariaco Project - Location
CAÑARIACO PROJECT - LOCATION • 100% owned, 91 Km2 concession within a prolific trend of known copper and gold deposits surrounded by major multibillion dollar mining projects. • The mineralized belt includes several world-class, multi-billion dollar producing mines owned by majors: • Gold Fields - C

Slide 17: Other Projects - Arikepay
OTHER PROJECTS - ARIKEPAY ARIKEPAY OPTION AGREEMENT Precore Gold will have the option and right to acquire up to a 100% beneficial interest in the Arikepay Project. A summary of the terms based on 100% acquisition which is contingent upon the successful staged development of the Arikepay Project is

Slide 18: Other Projects – Don Gregorio & Canyon Creek
OTHER PROJECTS – DON GREGORIO & CANYON CREEK DON GREGORIO, PERU Alta Copper has a 100% interest in the Don Gregorio which is a copper-gold porphyry target located in northern Peru 140 km NNE of Chiclayo in the department of Cajamarca. • The 12 holes totaling 1,642 meters drilled to date indicate cop

Slide 19: Cañariaco Project – Resource Expansion
CAÑARIACO PROJECT – RESOURCE EXPANSION Significant Upside Recent 3D Geological Last Drilled in 2013 Remains Modelling Several Cumulative Drilling to Expansion Drill Targets Date of 85,000 Meters TSX: ATCU | OTCQX: ATCUF 19

Slide 20: Cañariaco Project – Resource Estimate
CAÑARIACO PROJECT – RESOURCE ESTIMATE Cañariaco Norte and Sur are two deposits within a much larger district-scale project → both resources are open at depth and laterally • Cañariaco Norte mineralization starts at surface, and has a low strip ratio (1.33:1); grade and strip ratio drive project econ

Slide 21: Cañariaco Trend – Two Resources, How Many Deposits?
CAÑARIACO TREND – TWO RESOURCES, HOW MANY DEPOSITS? Current Mineral Resource is district-scale extending over 5km length and open in all directions laterally and at depth Cañariaco Norte • Measured & Indicated: 9.3B lbs Cu | 2.2M oz. Au | 60.4M oz. Ag • Inferred: 2.4B lbs Cu | 0.5M oz. Au | 16.9M oz

Slide 22: Cañariaco Trend – Satellite Image
CAÑARIACO TREND – TWO RESOURCES, HOW MANY DEPOSITS? A’ SATELLITE IMAGE Cañariaco Norte Cañariaco Sur Quebrada Verde A’ TSX: ATCU | OTCQX: ATCUF 22

Slide 23: Drilling Planned and Historical Long-Section A – West View
DRILLING PLANNED AND HISTORICAL LONG-SECTION A – WEST VIEW A’ Quebrada Verde A’ Cañariaco Sur Cañariaco Norte Undrilled Legend Undrilled Planned Drilling Drillholes Cu % Undrilled 500 m TSX: ATCU | OTCQX: ATCUF 23

Slide 24: Cañariaco Norte 3D Leapfrog Model Section B Plan View
CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION B PLAN VIEW Proposed Pit Shell 0.7% Cu B’ B’ 0.5% Cu 0.3% Cu Legend Planned Drilling Grade Drillholes Cu % Shells Cu % 0.7 0.5 300 m 0.3 TSX: ATCU | OTCQX: ATCUF 24

Slide 25: Cañariaco Norte 3D Leapfrog Model Section B North View
CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION B NORTH VIEW C06-058 C07-140 C07-141 B’ 495 m at 0.52 %Cu 255 m at 0.65 %Cu B’ 755 m at 0.56 %Cu Including: Including: Including: 216 m at 0.65 %Cu 59 m at 1.03 %Cu 292 m at 0.71 %Cu Ends in mineralization Ends in mineralization Ends in mineralization Untest

Slide 26: Cañariaco Norte 3D Leapfrog Model Section D Plan View
CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION D PLAN VIEW D’ Proposed Pit Shell 0.7% Cu 0.5% Cu 0.3% Cu Legend Planned Drilling Grade Drillholes Cu % Shells Cu % 0.7 0.5 300 m D’ 0.3 TSX: ATCU | OTCQX: ATCUF 26

Slide 27: Cañariaco Norte 3D Leapfrog Model Cross Section D West View
CAÑARIACO NORTE 3D LEAPFROG MODEL CROSS SECTION D WEST VIEW D’ C07-141 C07-140 C06-058 D’ 755 m at 0.56 %Cu 255 m at 0.65 %Cu 495 m at 0.52 %Cu Including: Including: Including: 292 m at 0.71 %Cu 59 m at 1.03 %Cu 216 m at 0.65 %Cu Ends in mineralization Ends in mineralization Ends in mineralization U

Slide 28: Cañariaco Project Timeline
CAÑARIACO PROJECT TIMELINE CAÑARIACO PROJECT TIMELINE 2023 DESCRIPTION 2024 2025 2026 2027 2028 Q3 Q4 Optimized PEA – Completed 2024 DIA – EISA | CIRAS – Approved Social License Advancing 2 Phases of up to 20,000 Meters Increasing NPV/Initial Capex Ratio Feasibility Study EIA and Initial Permits Per

Slide 29: Cañariaco Project – Mining in Peru
CAÑARIACO PROJECT – MINING IN PERU PERU MINING INVESTMENT • Second Largest Copper Producer After Chile • Recent Announcements: ”Mining is the backbone of Peru’s economy, accounting for 60 per cent of exports and about 10 percent of gross domestic product. In recent months, the government of Boluarte

Slide 30: Experienced Leadership Team
EXPERIENCED LEADERSHIP TEAM GIULIO T. BONIFACIO DALE FOUND, CPA, CA, FCA (UK) ALDO BENDEZU, PhD, Geologist Engineer President, Chief Executive Officer & Director Vice President, Chief Financial Officer Principal Geologist & Project Manager • 30 plus years in senior executive roles in global • 30 yea

Slide 31: Experienced Leadership Team
EXPERIENCED LEADERSHIP TEAM STEVEN LATIMER, MBA, HBA, CFA CHRISTINE NICOLAU ANDREW HAMILTON, BENG. (MECH) Non-Executive Chair & Director Director Director • Current Managing Director and Head of the • Group Manager Corporate Portfolio Management • Technical Director, Corporate Strategy Team, America

Slide 32: Appendix
APPENDIX TSX: ATCU | OTCQX: ATCUF 32

Slide 33: Note Disclosure – Mineral Resource Estimate
NOTE DISCLOSURE – MINERAL RESOURCE ESTIMATE NOTES : MINERAL RESOURCE ESTIMATE – CAÑARIACO NORTE & SUR 1. Cañariaco Norte - Copper equivalent grades including contributions from gold and silver, were estimated using metal prices of copper: US$4.25/lb, gold: US$1,950 /oz, and silver: US$23.00/oz), met

Slide 34: Cañariaco Project Capital – Low Capital Intensity
CAÑARIACO PROJECT CAPITAL – LOW CAPITAL INTENSITY • Open pit mine with conventional crush/grind and Cost Area Initial Capital Sustaining TOTAL flotation technology (US$M) • Conventional drill and blast mining, large scale Mine 429 186 615 electric shovels and haul trucks • Low Capital Intensity: Pro

Slide 35: Cañariaco Operating Costs
CAÑARIACO OPERATING COSTS • Open pit mine with conventional crush, grind and Life of Mine Operating Costs Summary flotation technology Area Unit US$ Unit US$/lb Cu • C1 costs at US$1.82/lb Life of Mine (net of by- On-site Costs products) Mining $/t milled 5.37 lb Cu 0.79 • AISC at US$1.92/lb Life of

Slide 36: Have Questions – Get in Touch with Alta Copper Corp.
TSX: ATCU | OTCQX: ATCUF HAVE QUESTIONS GET IN TOUCH WITH ALTA COPPER CORP. Giulio T. Bonifacio President & CEO gtbonifacio@altacopper.com 604-318-6760 Telephone: 604-689-1957 / 1-877-689-1964 Email: info@altacopper.com www.altacopper.com
Source: Internet Archive copy of altacopper.com
More decks from Alta Copper Corp.
Investor Presentation (July 2025)34 slides · July 2025
Investor Presentation (June 2025)35 slides · Jun 20, 2025
Investor Presentation (April 2025)35 slides · April 2025
Investor Presentation (October 2024)34 slides · October 2024
Investor Presentation (May 2023)24 slides · May 26, 2023
Fortescue Metals Group — FY2021 Earnings Presentation46 slides · August 2021