Alta Copper Corp.

Alta Copper — Investor Presentation (October 2024)

34 slides from Alta Copper's investor presentation, October 2024

  1. Slide 1: Advanced Stage Copper Developer – Powering the Green Revolution

    Slide 1: Advanced Stage Copper Developer – Powering the Green Revolution

    TSX: ATCU | OTCQX: ATCUF www.altacopper.com October 2024 ADVANCED STAGE COPPER DEVELOPER POWERING THE GREEN REVOLUTION

  2. Slide 2: Cautionary Language – Forward Looking Statements

    Slide 2: Cautionary Language – Forward Looking Statements

    CAUTIONARY LANGUAGE – FORWARD LOOKING STATEMENTS The material contained in this presentation is provided solely for your general knowledge and is not intended to be a comprehensive review of all matters and developments concerning Alta Copper Corp. (“Alta”) or its affiliates. Alta has taken all reas

  3. Slide 3: Alta Copper – Why Invest?

    Slide 3: Alta Copper – Why Invest?

    ALTA COPPER – WHY INVEST? • One of the world’s largest undeveloped copper deposits not held by a major • Cañariaco Norte Resource (See Note 1) : 9.3B lbs Cu, 2.2M oz Au, 60.4M oz Ag Measured & Indicated, 2.4B lbs Cu, 0.52M oz Au, 16.9M oz Ag Inferred • Cañariaco Sur Resource (See Note 1) : 2.5B lbs

  4. Slide 4: Alta Copper – Short Term Catalyst

    Slide 4: Alta Copper – Short Term Catalyst

    ALTA COPPER – SHORT TERM CATALYST • Preliminary Economic Assessment (“PEA”) showing Robust Economics → Completed May 2024 • Reconstitution of Board of Directors and Senior Management Changes → July 2024 • Drill Permit Application (“DIA” & “ESIA”) Submitted December 2023 → Approved October 2024 • Cer

  5. Slide 5: Corporate Structure

    Slide 5: Corporate Structure

    CORPORATE STRUCTURE Capital Structure – October 2024 (Stated in Millions) Shareholder Registry Shares Issued and Outstanding 89.8 Funds & Family Peruvian High Net Offices: 10.9 % Options 5.0 Worth:16.3 % Director & Officers: 2.4 % RSU and DSU 0.4 Total Shares - Fully Diluted 95.2 Market Capitalizati

  6. Slide 6: Cañariaco PEA Highlights

    Slide 6: Cañariaco PEA Highlights

    CAÑARIACO PEA HIGHLIGHTS $3.85/lb Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb Cu After-Tax NPV8% After-Tax NPV88% After-Tax NPV88% After-Tax NPV88% US$2,088 M US$2,346 M US$3,197 M US$4,045 M After-Tax IRR After-Tax IRR After-Tax IRR After-Tax IRR 22.6% 24.1% 28.9% 33.4% Pre-Tax NPV8% Pre-Tax NPV8% Pre-Tax

  7. Slide 7: Cañariaco Detailed PEA Results

    Slide 7: Cañariaco Detailed PEA Results

    CAÑARIACO DETAILED PEA RESULTS Metric Unit of Measure Year 1 -10 LOM Cu % 0.41 0.35 Au g/t 0.08 0.07 Ag g/t 1.86 1.59 Cu Equivalent % 0.48 0.41 Metal Production Cu % 3,469 8,026 Au g/t 696 1,674 Ag g/t 14,978 33,219 Average Process Recovery (Note 1) Cu % 89.2 88.2 Au % 66.4 63.3 Ag % 58.5 55.3 Physi

  8. Slide 8: Cañariaco and Copper Developer Peers

    Slide 8: Cañariaco and Copper Developer Peers

    CAÑARIACO AND COPPER DEVELOPER PEERS Arizona Ivanhoe Western Faraday Los Andes Alta Copper Sonoran Electric Copper Filo Corp Copper Hot Chili McEwen Copper Market Capitalization (C$M) $50 $197 $1,825 $319 $4,375 $187 $116 $585 $236 Copper Asset Name Cañariaco Cactus Santa Cruz Casino Filo del Sol Co

  9. Slide 9: Company Benchmarking - P/NAV

    Slide 9: Company Benchmarking - P/NAV

    COMPANY BENCHMARKING - P/NAV Alta Copper is currently trading at a large discount when compared to copper peers Ratio | Price/NAVPS | Bubbles indicate expected production start year 2029 2029 2030 2028 2027 2029 2026 2028 2028 2026 2034 0.72x 0.74x 0.51x 0.42x 0.31x 0.24x 0.25x 0.28x 0.28x 0.09x 0.0

  10. Slide 10: Company Benchmarking - NPV/Initial Capex

    Slide 10: Company Benchmarking - NPV/Initial Capex

    COMPANY BENCHMARKING - NPV/ Initial Capex Cañariaco displays strong economics, generating NPV for lower capital compared to its peers Ratio | Initial Capex (US$M)/After-Tax NPV8% (US$M) | Bubble size based on annual copper equivalent production(1) 3.5x Cactus Arizona Sonoran 3.0x 2.5x Cascabel SolGo

  11. Slide 11: Company Benchmarking - NPV/Total Capex

    Slide 11: Company Benchmarking - NPV/Total Capex

    COMPANY BENCHMARKING - NPV/ Total Capex Cañariaco displays strong economics, generating NPV for lower capital compared to its peers Ratio | Initial Capex (US$M)/After-Tax NPV8% (US$M) | Bubble size based on annual copper equivalent production(1) 1.2x Catcus Arizona Sonoran 1:1 NPV/CAPEX Cascabel Cañ

  12. Slide 12: Capital Intensity - Total Capex

    Slide 12: Capital Intensity - Total Capex

    CAPITAL INTENSITY - Total Capex Cañariaco possess a strong production profile with low capital intensity (based on average annual copper equivalent production)(1) Capital Intensity (US$/t) | Bubble size based on annual copper equivalent production(1) $60,000 Copper Creek Faraday Copper $45,000 Casca

  13. Slide 13: Capital Intensity - Total Capex

    Slide 13: Capital Intensity - Total Capex

    CAPITAL INTENSITY - Total Capex Cañariaco possess a strong production profile with low capital intensity (based on daily mill capacity) Capital Intensity (US$/t) | Bubble size based on daily mill capacity $100,000 Copper Creek Faraday Copper $80,000 Cascabel SolGold $60,000 Costa-Fuego Copper World

  14. Slide 14: Mine Life vs Capital Intensity (Initial)

    Slide 14: Mine Life vs Capital Intensity (Initial)

    MINE LIFE vs CAPITAL INTENSITY (INITIAL) Cañariaco has a robust mine life with low capital intensity, meaning lower risks and costs leading to production (based on daily mill capacity) Years | Capital Intensity (US$/t) | Bubble size based on daily mill capacity $100,000 $80,000 McIlvenna Bay Foran M

  15. Slide 15: Project – Location and Access

    Slide 15: Project – Location and Access

    CAÑARIACO PROJECT – LOCATION AND ACCESS • The Cañariaco Copper-Gold project is located in the Cañaris District of the Province of Ferreñafe, Lambayeque, near the top of the continental divide. • The project is approximately 700 km northwest of Lima, the capital of Peru, and 102 km northeast the city

  16. Slide 16: Project - Location

    Slide 16: Project - Location

    CAÑARIACO PROJECT - LOCATION • 100% owned, 97 Km2 concession within a prolific trend of known copper and gold deposits surrounded by major multibillion dollar mining projects. • The mineralized belt includes several world-class, multi-billion dollar producing mines owned by majors: • Gold Fields - C

  17. Slide 17: Project – Resource Expansion

    Slide 17: Project – Resource Expansion

    CAÑARIACO PROJECT – RESOURCE EXPANSION Significant Upside Recent 3D Geological Last Drilled in 2013 Remains Modelling Several Cumulative Drilling to Expansion Drill Targets Date of 85,000 Meters TSX: ATCU | OTCQX: ATCUF 17

  18. Slide 18: Project – Resource Estimate

    Slide 18: Project – Resource Estimate

    CAÑARIACO PROJECT – RESOURCE ESTIMATE Cañariaco Norte and Sur are two deposits within a much larger district-scale project → both resources are open at depth and laterally • Cañariaco Norte mineralization starts at surface, and has a low strip ratio (1.33:1x); grade and strip ratio drive project eco

  19. Slide 19: Trend – Two Resources, How Many Deposits?

    Slide 19: Trend – Two Resources, How Many Deposits?

    CAÑARIACO TREND – TWO RESOURCES, HOW MANY DEPOSITS? Current Mineral Resource is district-scale extending over 5km length and open in all directions laterally and at depth Cañariaco Norte • Measured & Indicated: 9.3B lbs Cu | 2.2M oz. Au | 60.4M oz. Ag • Inferred: 2.4B lbs Cu | 0.52M oz. Au | 16.9M o

  20. Slide 20: Trend – Two Resources, How Many Deposits?

    Slide 20: Trend – Two Resources, How Many Deposits?

    CAÑARIACO TREND – TWO RESOURCES, HOW MANY DEPOSITS? A’ SATELLITE IMAGE Cañariaco Norte Cañariaco Sur Quebrada Verde A’ TSX: ATCU | OTCQX: ATCUF 20

  21. Slide 21: Drilling Planned and Historical Long-Section A – West View

    Slide 21: Drilling Planned and Historical Long-Section A – West View

    DRILLING PLANNED AND HISTORICAL LONG-SECTION A – WEST VIEW A’ Quebrada Verde A’ Cañariaco Sur Cañariaco Norte Undrilled Legend Undrilled Planned Drilling Drillholes Cu % Undrilled 500 m TSX: ATCU | OTCQX: ATCUF 21

  22. Slide 22: Norte 3D Leapfrog Model Section B Plan View

    Slide 22: Norte 3D Leapfrog Model Section B Plan View

    CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION B PLAN VIEW Proposed Pit Shell 0.7% Cu B’ B’ 0.5% Cu 0.3% Cu Legend Planned Drilling Grade Drillholes Cu % Shells Cu % 0.7 0.5 300 m 0.3 TSX: ATCU | OTCQX: ATCUF 22

  23. Slide 23: Norte 3D Leapfrog Model Section B North View

    Slide 23: Norte 3D Leapfrog Model Section B North View

    CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION B NORTH VIEW C06-058 C07-140 C07-141 B’ 495 m at 0.52 %Cu 255 m at 0.65 %Cu B’ 755 m at 0.56 %Cu Including: Including: Including: 216 m at 0.65 %Cu 59 m at 1.03 %Cu 292 m at 0.71 %Cu Ends in mineralization Ends in mineralization Ends in mineralization Untest

  24. Slide 24: Norte 3D Leapfrog Model Section D Plan View

    Slide 24: Norte 3D Leapfrog Model Section D Plan View

    CAÑARIACO NORTE 3D LEAPFROG MODEL SECTION D PLAN VIEW D’ Proposed Pit Shell 0.7% Cu 0.5% Cu 0.3% Cu Legend Planned Drilling Grade Drillholes Cu % Shells Cu % 0.7 0.5 300 m D’ 0.3 TSX: ATCU | OTCQX: ATCUF 24

  25. Slide 25: Norte 3D Leapfrog Model Cross Section D West View

    Slide 25: Norte 3D Leapfrog Model Cross Section D West View

    CAÑARIACO NORTE 3D LEAPFROG MODEL CROSS SECTION D WEST VIEW D’ C07-141 C07-140 C06-058 D’ 755 m at 0.56 %Cu 255 m at 0.65 %Cu 495 m at 0.52 %Cu Including: Including: Including: 292 m at 0.71 %Cu 59 m at 1.03 %Cu 216 m at 0.65 %Cu Ends in mineralization Ends in mineralization Ends in mineralization U

  26. Slide 26: Project Timeline

    Slide 26: Project Timeline

    CAÑARIACO PROJECT TIMELINE CAÑARIACO PROJECT TIMELINE 2023 DESCRIPTION 2024 2025 2026 2027 2028 Q3 Q4 Optimized PEA DIA – EISA | CIRAS Application - 43,000 Meters Approved 2 Phases of up to 20,000 Meters Feasibility Study Increasing NPV/Initial Capex Ratio EIA and Initial Permits Permitting/ Detaile

  27. Slide 27: Project – Mining in Peru

    Slide 27: Project – Mining in Peru

    CAÑARIACO PROJECT – MINING IN PERU PERU MINING INVESTMENT • Second Largest Copper Producer After Chile • Recent Announcements: ”Mining is the backbone of Peru’s economy, accounting for 60 per cent of exports and about 10 percent of gross domestic product. In recent months, the government of Boluarte

  28. Slide 28: Experienced Leadership Team

    Slide 28: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM GIULIO T. BONIFACIO DALE FOUND, CPA, CA, FCA (UK) STEVEN LATIMER, MBA, HBA, CFA Executive Chair and Chief Executive Officer Vice President, Chief Financial Officer CFA - Director • 30 plus years in senior executive roles in global • 30 years of international accounting &

  29. Slide 29: Experienced Leadership Team

    Slide 29: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM DR. ROBERT J. MCDONALD.PHD CHRISTINE NICOLAU ANDREW HAMILTON, BENG. (MECH) Management Sciences - Director Director Director • Over 30 years as seasoned international • Metals General Manager, Latin America, Fortescue • Technical Director, Corporate Strategy Team, executiv

  30. Slide 30: Appendix

    Slide 30: Appendix

    APPENDIX TSX: ATCU | OTCQX: ATCUF 30

  31. Slide 31: Note Disclosure – Mineral Resource Estimate

    Slide 31: Note Disclosure – Mineral Resource Estimate

    NOTE DISCLOSURE – MINERAL RESOURCE ESTIMATE NOTES : MINERAL RESOURCE ESTIMATE – CAÑARIACO NORTE & SUR 1. Cañariaco Norte - Copper equivalent grades including contributions from gold and silver, were estimated using metal prices of copper: US$4.25/lb, gold: US$1,950 /oz, and silver: US$23.00/oz), met

  32. Slide 32: Project Capital – Low Capital Intensity

    Slide 32: Project Capital – Low Capital Intensity

    CAÑARIACO PROJECT CAPITAL – LOW CAPITAL INTENSITY • Open pit mine with conventional crush/grind and Cost Area Initial Capital Sustaining TOTAL flotation technology. (US$M) • Conventional drill and blast mining, large scale Mine 429 186 615 electric shovels and haul trucks • Low Capital Intensity: Pr

  33. Slide 33: Operating Costs

    Slide 33: Operating Costs

    CAÑARIACO OPERATING COSTS • Open pit mine with conventional crush, grind and Life of Mine Operating Costs Summary flotation technology Area Unit US$ Unit US$/lb Cu • C1 costs at US$1.82/lb Life of Mine (net of by- On-site Costs products) Mining $/t milled 5.37 lb Cu 0.79 • AISC at US$1.92/lb Life of

  34. Slide 34: Have Questions – Get in Touch

    Slide 34: Have Questions – Get in Touch

    TSX: ATCU | OTCQX: ATCUF HAVE QUESTIONS GET IN TOUCH WITH ALTA COPPER CORP. Giulio T. Bonifacio Executive Chair & CEO gtbonifacio@altacopper.com 604-318-6760 Telephone: 604-689-1957 / 1-877-689-1964 Email: info@altacopper.com www.altacopper.com

Source: Internet Archive copy of altacopper.com