Slide 1: AGM Presentation
For personal use only AGM Presentation 21 November 2017 Rob Smith Senior Geologist 1
Slide 2: Investment in Eden Innovations Ltd (ASX:EDE)
Investment in Eden Innovations Ltd (ASX:EDE) For personal use only • Tasman holds 493 million shares (39%) in the issued capital of Eden and 101 million EDEO options. • Market value of Eden holding - $81 million* • Current Market Capital of Tasman - $40 million* • Tasman cash at bank - $610,000* • 5
Slide 3: Tasman Project Locations
Tasman Project Locations For personal use only Lake Torrens (1250 km2) IOCGU Parkinson Dam (145 km2) Epithermal Au, Ag, Zn, Pb Lucas Hill (196 km2) IOCGU 3
Slide 4: Lake Torrens IOCGU
For personal use only Lake Torrens IOCGU Including Vulcan prospect 4
Slide 5: Lake Torrens Project
Lake Torrens Project Residual gravity image (& IOCGU deposits/prospects) Including proposed infill gravity survey at Vulcan West - Zeus For personal use only EL 4322 5
Slide 6: Vulcan, Vulcan West, Zeus Prospects: Current Strategy
Vulcan, Vulcan West, Zeus Prospects For personal use only Current Strategy • New geophysical modelling recently completed in large area (approx. 50km2) between Vulcan and Zeus prospects • Further detailed gravity survey planned: – Improve station spacing locally from 600m to 250m – Focus on several
Slide 7: Vulcan IOCGU Prospect
Vulcan IOCGU Prospect Residual gravity image & drilling and priority targets For personal use only Footprint of Carrapateena deposit at same scale Footprint of Carrapateena deposit at same scale 7
Slide 8: Vulcan IOCGU Project - Summary
Vulcan IOCGU Project - Summary For personal use only • Very large hematite-dominant IOCGU system (~ 12km2) 30km north of Olympic Dam • Hosted by gneisses, granites and metasediments (~1,750my) • 17 holes drilled: – Thick & strong alteration, inc.100’s metres of hematite breccias; intense hematite, s
Slide 9: Vulcan VUD 3: Cu - Au - U3O8 Mineralisation
Vulcan VUD 3: Cu - Au - U3O8 Mineralisation For personal use only Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au Core from interval: 0.75m at 4.4% Cu, 1.34g/t Au, 0.58kg/t U3O8
Slide 10: VUD 8: Silica-Hematite Breccia
VUD 8: Silica-Hematite Breccia (+ bornite - chalcopyrite) For personal use only 10
Slide 11: Vulcan VUD 15: Thick, mineralised hematite breccias
Vulcan VUD 15: Thick, mineralised hematite breccias For personal use only 11
Slide 12: Parkinson Dam/Corrie Dam Prospects
Parkinson Dam/Corrie Dam Prospects For personal use only Epithermal Gold, Silver, Lead and Zinc 12
Slide 13: Parkinson Dam and Corrie Dam Prospects
Parkinson Dam and Corrie Dam Prospects For personal use only 13
Slide 14: Parkinson Dam: Previously discovered high grade gold & silver
Parkinson Dam: Previously discovered high grade gold & silver For personal use only • PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Classic epithermal veining • Gold (electrum ~ 35% Ag) • PD 64: 3m @ 18.1% Pb, 1.1% Zn, 44.2g/t Ag • Mineralisation over > 2 km2 14
Slide 15: Parkinson Dam/Corrie Dam: Overview
Parkinson Dam/Corrie Dam: Overview For personal use only Current Strategy • Epithermal Gold-Silver (Lead-Zinc) discovery by Tasman Resources in 2005 • Best Intersection: 21m at 21g/t Au, 83g/t Ag • Further encouragement at nearby Corrie Dam • Next Stage: Possible modest IP Geophysics over northern (
Slide 16: Disclaimer
Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of pro
Slide 17: Competent Person's Statement
Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results is based on and fairly represents information compiled by Robert N. Smith, Competent Person who is a member of the Australian Institute of Geoscientists. Mr Smith is a part-tim