Tasman Resources Ltd · ASX:TAS

Tasman Resources — Investor Presentation (November 2024)

19 slides from Tasman Resources's investor presentation, Nov 25, 2024

  1. Slide 1: Investor Presentation

    For personal use only Investor Presentation 25 November 2024 1

  2. Slide 2: Tasman Projects and Assets

    Tasman Projects and Assets Mineral Exploration Projects For personal use only South Australia Lake Torrens (1079 km2) - Copper – Gold (IOCG) Parkinson Dam (41 km2) - Copper - Gold - Silver Epithermal / IOCG Other Assets Shareholding in Eden Innovations Ltd – holds 1.393 billion Eden shares (33.9%) 2

  3. Slide 3: Lake Torrens Project - Fortescue Joint Venture

    Lake Torrens Project - EL6416 Fortescue Joint Venture For personal use only • Farm in and joint venture agreement with Fortescue Metals Group (signed June 2019) over Tasman’s wholly owned EL 6416 (previously EL5499) • Fortescue earned a 51% interest in EL 6416 by sole funding A$4 million plus GST on

  4. Slide 4: Regional Targets

    Lake Torrens Project - EL6416 Regional Targets For personal use only Regional residual gravity image over Exploration Licence 6416, showing the location of Vulcan, Olympic Dam and other IOCG prospects (red dots) (GDA 94, MGA Zone 53). Vulcan South 4

  5. Slide 5: Hole Locations – Vulcan North Area

    Lake Torrens Project - EL6416 Hole Locations – Vulcan North Area For personal use only Vulcan Prospect, residual gravity image showing location of Vulcan North Vulcan North area, recent Fortescue holes Area VUD0018 & VUD0019 and previous Tasman drill holes. The thick black lines on the drill hole tr

  6. Slide 6: Drilling - Vulcan North Target Area

    Lake Torrens Project - EL6416 Drilling - Vulcan North Target Area For personal use only 2 deep holes (VUD018 and VUD 019) drilled by Fortescue to test Vulcan North gravity feature intersected wide zones of copper mineralisation in massive hematite breccia: • VUD018 - 62m downhole* @ 0.55%^ Cu (inclu

  7. Slide 7: Vulcan North - VUD018 Drill Core

    Lake Torrens Project - EL6416 Vulcan North - VUD018 Drill Core For personal use only VUD0018 - 1387m. Mineralised colloform massive hematite breccia. NQ2 core. 7

  8. Slide 8: Vulcan North - VUD019 Drill Core

    Lake Torrens Project - EL6416 Vulcan North - VUD019 Drill Core For personal use only VUD0019 - 1411.2m. Disseminated chalcopyrite and pyrite mineralisation in hematite breccia. NQ2 ½ core. VUD0019 - 1416.1m. Layered chalcopyrite and lesser pyrite mineralisation in hematite breccia. NQ2 ½ core. 8

  9. Slide 9: Tasman Drilling at Vulcan North (2013)

    Tasman Drilling at Vulcan North (2013) VUD15 Copper Mineralisation For personal use only 9

  10. Slide 10: Vulcan South Area

    Lake Torrens Project - EL6416 Vulcan South Area Vulcan South For personal use only Tasman drill holes VUD011 and VUD012 intersected wide zones of copper mineralisation, with elevated Pd and REE: From Downhole Pd U3O8 Hole No Interval* Cu % Au g/t Ag g/t Fe % (m) (m) ppb kg/t VUD011 1027 137 0.14 0.1

  11. Slide 11: Vulcan South Gravity Target

    Lake Torrens Project - EL6416 Vulcan South Gravity Target For personal use only Vulcan Prospect, residual gravity image showing Vulcan North location of Vulcan South Area target area (Grid GDA 94, Z53). White ellipse surrounds gravity features tested by Fortescue drilling wedging off holes VUD011 &

  12. Slide 12: Parkinson Dam Surface Outcrops

    Parkinson Dam Surface Outcrops For personal use only Epithermal crustiform-colloform layered quartz veining

  13. Slide 13: Parkinson Dam Best Drill Results

    Parkinson Dam Best Drill Results For personal use only PD 63: 21m at 21g/t Au, 83g/t Ag High grade, narrow, steep structure: E-W strike Open to west for approx. 1.5km Significant, thick Pb & Zn: PD 70: 50m at 0.9% Zn, 0.3% Pb

  14. Slide 14: Parkinson Dam High Grade Mineralisation

    Parkinson Dam High Grade Mineralisation • PD 63: 21m @ 21g/t Au, 83g/t For personal use only Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Distinctive late-stage epithermal veining: – Quartz & haematite – Apatite, chlorite, muscovite (vanadiferous phengite) – Lead, zinc & copper poor • Gold (electrum, ~ 35%

  15. Slide 15: Parkinson Dam Gold–Silver Mineralisation

    Parkinson Dam Gold– Silver Mineralisation For personal use only Free gold (electrum) associated with epithermal quartz and haematite

  16. Slide 16: Parkinson Dam 2024 Geophysical Review and 2025 Planned Drilling

    Parkinson Dam For personal use only 2024 Geophysical Review and 2025 Planned Drilling • IP and Resistivity Survey –significant undrilled targets identified • Automatic Curve Matching (ACM) – identifies Epithermal and IOCG feeder zones and 5 initial potential drill targets based upon magnetics and IP

  17. Slide 17: Parkinson Dam ACM Defined Drill Targets

    Parkinson Dam ACM Defined Drill Targets om Magnetics For personal use only Location of magnetic semi vertical pipe-shaped features on the image of the Vertical Gradient of RTP magnetics. The polygons outlining these features are relative to -450m MSL.

  18. Slide 18: Disclaimer

    Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of pro

  19. Slide 19: Competent Person's Statement

    Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results is based on and fairly represents information compiled by Guy Le Page, Competent Person who is a member of the Australian Institute of Geoscientists. Mr Smith is a part-time em

Tasman Resources — Investor Presentation (November 2024) on 6ix