Tasman Resources Ltd · ASX:TAS
Tasman Resources — Shareholder Meeting (November 2025)
23 slides from Tasman Resources's shareholder meeting presentation, Nov 28, 2025
Slide 1: Annual General Meeting Presentation
Annual General For personal use only Meeting Presentation Tasman Resources Ltd 28 November 2025
Slide 2: Tasman Projects & Assets
Tasman Projects & Assets For personal use only Mineral Exploration Projects - South Australia: Darwin Lake Torrens EL 6416 (1079 km²) (currently 49% Tasman, 51% Fortescue) - Copper – Gold (IOCG) Parkinson Dam EL 6495 (34.7 km2) (100% Tasman) - Lake Torrens Copper - Gold - Silver Epithermal / IOC
Slide 3: Lake Torrens Project - EL6416
Lake Torrens Project - EL6416 For personal use only Farm in and joint venture agreement with subsidiary of Fortescue Ltd (signed June 2019) over EL 6416. Fortescue earned a 51% interest in EL 6416 by sole funding A$4 million plus GST on exploration expenditure. Fortescue elected to increase it
Slide 4: Lake Torrens Project – EL6416 Key Regional Targets MT Surveys
Lake Torrens Project – EL6416 Key Regional Targets MT Surveys For personal use only Regional residual gravity image over Exploration Licence 6416, showing the Regional Bouguer Gravity Image (Residual 500m) showing location of location of Vulcan, Olympic Dam and other IOCG prospects (red dots) (GDA 9
Slide 5: EL6416 - Magnetotellurics Survey Stations
EL6416 - Magnetotellurics Survey Stations Co-located conductive / dense bodies may represent For personal use only sulfide-rich lithologies. Western Mining drillhole BD2 (1982) was not an effective test of the target, being located approximately 500m away from the peak of the Residual Gravity an
Slide 6: EL6416 - MT Survey Titan and Bill's Lookout 2025
EL6416 - MT Survey Titan and Bill’s Lookout 2025 For personal use only 3D Inversion Model over the Titan Prospect: Showing iso-surfaces of high-density contrast (yellow bodies), the co-located iso-surface of low resistivity/elevated conductivity (purple body) at Titan West, and the location of histo
Slide 7: EL6416 - Vulcan Project Area Gravity Targets
EL6416 - Vulcan Project Area Gravity Targets For personal use only Vulcan Prospect, residual gravity image showing location of Vulcan South target area (Grid GDA 94, Z53). Gravity features tested by earlier drilling (VUD018 and VUD019) wedging off holes VUD011 & VUD012 and drilling at low angles acr
Slide 8: Previous Drilling: Vulcan North Target Area
Previous Drilling: Vulcan North Target Area For personal use only Two (2) deep holes (VUD018 and VUD 019) drilled by Fortescue to test Vulcan North gravity feature intersected wide zones of VUD15 Copper Mineralisation copper mineralisation in massive hematite breccia (ASX:TAS 30 June 2021) : VUD01
Slide 9: EL6416 - Vulcan North - VUD018
EL6416 - Vulcan North - VUD018 For personal use only VUD0018 - 1387m. Mineralised coliform massive hematite breccia. NQ2 core. 9
Slide 10: EL6416 - Vulcan North - VUD019
EL6416 - Vulcan North - VUD019 For personal use only VUD0019 - 1411.2m. Disseminated chalcopyrite and VUD0019 - 1416.1m. Layered chalcopyrite and lesser pyrite mineralisation in hematite breccia. NQ2 ½ core. pyrite mineralisation in hematite breccia. NQ2 ½ core. 10
Slide 11: Vulcan North Target Area - MT Survey 2025
Vulcan North Target Area - MT Survey 2025 MT Phase Including All MT Stations Location of Conductive Zone in Relation to Drill Holes For personal use only VUD 008 is the most northerly hole. 11
Slide 12: Vulcan North Target Area - MT Survey 2025
Vulcan North Target Area - MT Survey 2025 For personal use only 2D model (cross section) from SW to NE with the projected boreholes around Vulcan (thin, vertical black lines) and showing an interpreted 1- 2km wide, 5km deep conductive feeder zone to the North-East. VUD 008 is represented by the thin
Slide 13: Parkinson Dam (Tasman 100%)
Parkinson Dam (Tasman 100%) Parkinson Dam Targets Surface Outcrops For personal use only 2026 - Planned Parkinson Dam Drilling Programme (EL6495 (34.7 km2) Epithermal, Hydrothermal, IOCG, Porphyry Targets Archimedes Consulting identified six drill targets comprising: Epithermal / Hydrotherma
Slide 14: Parkinson Dam – Best Drill Results
Parkinson Dam – Best Drill Results For personal use only PD 63: 21m at 21g/t Au, 83g/t Ag High grade, narrow, steep structure: E-W strike Open to west for approx. 1.5km Significant, thick Pb & Zn: PD 70: 50m at 0.9% Zn, 0.3% Pb 14
Slide 15: Parkinson Dam – High Grade Mineralisation
Parkinson Dam – High Grade Mineralisation PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t For personal use only Au, 152 g/t Ag) Distinctive late-stage epithermal veining: Quartz & haematite Apatite, chlorite, muscovite (vanadiferous phengite) Lead, zinc & copper poor Gold (electrum, ~ 35
Slide 16: Parkinson Dam Gold-Silver Mineralisation
Parkinson Dam Gold-Silver Mineralisation For personal use only Free gold (electrum) associated with epithermal quartz and haematite 16
Slide 17: Parkinson Dam Drilling ACM Defined Drill Targets
Parkinson Dam Drilling ACM Defined Drill Targets on Magnetics: Location of magnetic semi vertical pipe-shaped features on the image of the Vertical Gradient of RTP magnetics. For personal use only The polygons outlining these features are relative to - 450m MSL. 2026 Planned Drilling – 6 undrilled
Slide 18: Parkinson Dam Drill Target - IOCG - Shallow
Parkinson Dam Drill Target 1 - IOCG - Shallow For personal use only Dense material shown in gravity survey appears to cluster around edge of magnetic feature. Interpreted possible dense breccia forming a cylindrical shape typical for IOCG- type deposits such as Olympic Dam or Ernest Henry. 18
Slide 19: Drill Target (a) IOCG/Epithermal - Shallow
Drill Target 2 (a) IOCG/Epithermal - Shallow For personal use only Undrilled\pipe-like structure below elliptical demagnetized zone, interpreted as hydrothermal fluid feeder to shallow crustal epithermal field, approximately 460m diameter, from 32 metres below the surface to a depth of over 2000m. 1
Slide 20: Drill Target (b) Porphyry
Drill Target 2 (b) Porphyry For personal use only Target T2(b) is the newly interpreted 500-metre-wide radius, circular gravity structure directly beneath Tasman’s earlier drill hole PD 63. This drill hole intersected encountered high grade gold and silver (21m at 21g/t Au and 83g/t Ag, including 9m
Slide 21: Disclaimer
Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of pro
Slide 22: Competent Person's Statement
Competent Person’s Statement The information in this presentation that relates to Exploration Results is based on and fairly represents information compiled by Ahmad Saleem, For personal use only Competent Person who is a member of the Australian Institute of Geoscientists. Mr Saleem is a part-time
Slide 23: Contact
For personal use only GREG SOLOMON EXECUTIVE CHAIRMAN Level 15, 197 St. Georges Terrace, Perth, Western Australia Telephone: +61 8 9282 5889 Mobile: +61 4 0206 0000 Email: gsolomon@tasmanresources.com.au This announcement was authorised for release by Greg Solomon, Chair 23
Tasman Resources — Shareholder Meeting (November 2025) on 6ix