Tasman Resources Ltd · ASX:TAS

Tasman Resources — Shareholder Meeting (November 2025)

23 slides from Tasman Resources's shareholder meeting presentation, Nov 28, 2025

  1. Slide 1: Annual General Meeting Presentation

    Annual General For personal use only Meeting Presentation Tasman Resources Ltd 28 November 2025

  2. Slide 2: Tasman Projects & Assets

    Tasman Projects & Assets For personal use only Mineral Exploration Projects - South Australia: Darwin  Lake Torrens EL 6416 (1079 km²) (currently 49% Tasman, 51% Fortescue) - Copper – Gold (IOCG)  Parkinson Dam EL 6495 (34.7 km2) (100% Tasman) - Lake Torrens Copper - Gold - Silver Epithermal / IOC

  3. Slide 3: Lake Torrens Project - EL6416

    Lake Torrens Project - EL6416 For personal use only  Farm in and joint venture agreement with subsidiary of Fortescue Ltd (signed June 2019) over EL 6416.  Fortescue earned a 51% interest in EL 6416 by sole funding A$4 million plus GST on exploration expenditure.  Fortescue elected to increase it

  4. Slide 4: Lake Torrens Project – EL6416 Key Regional Targets MT Surveys

    Lake Torrens Project – EL6416 Key Regional Targets MT Surveys For personal use only Regional residual gravity image over Exploration Licence 6416, showing the Regional Bouguer Gravity Image (Residual 500m) showing location of location of Vulcan, Olympic Dam and other IOCG prospects (red dots) (GDA 9

  5. Slide 5: EL6416 - Magnetotellurics Survey Stations

    EL6416 - Magnetotellurics Survey Stations  Co-located conductive / dense bodies may represent For personal use only sulfide-rich lithologies.  Western Mining drillhole BD2 (1982) was not an effective test of the target, being located approximately 500m away from the peak of the Residual Gravity an

  6. Slide 6: EL6416 - MT Survey Titan and Bill's Lookout 2025

    EL6416 - MT Survey Titan and Bill’s Lookout 2025 For personal use only 3D Inversion Model over the Titan Prospect: Showing iso-surfaces of high-density contrast (yellow bodies), the co-located iso-surface of low resistivity/elevated conductivity (purple body) at Titan West, and the location of histo

  7. Slide 7: EL6416 - Vulcan Project Area Gravity Targets

    EL6416 - Vulcan Project Area Gravity Targets For personal use only Vulcan Prospect, residual gravity image showing location of Vulcan South target area (Grid GDA 94, Z53). Gravity features tested by earlier drilling (VUD018 and VUD019) wedging off holes VUD011 & VUD012 and drilling at low angles acr

  8. Slide 8: Previous Drilling: Vulcan North Target Area

    Previous Drilling: Vulcan North Target Area For personal use only Two (2) deep holes (VUD018 and VUD 019) drilled by Fortescue to test Vulcan North gravity feature intersected wide zones of VUD15 Copper Mineralisation copper mineralisation in massive hematite breccia (ASX:TAS 30 June 2021) :  VUD01

  9. Slide 9: EL6416 - Vulcan North - VUD018

    EL6416 - Vulcan North - VUD018 For personal use only VUD0018 - 1387m. Mineralised coliform massive hematite breccia. NQ2 core. 9

  10. Slide 10: EL6416 - Vulcan North - VUD019

    EL6416 - Vulcan North - VUD019 For personal use only VUD0019 - 1411.2m. Disseminated chalcopyrite and VUD0019 - 1416.1m. Layered chalcopyrite and lesser pyrite mineralisation in hematite breccia. NQ2 ½ core. pyrite mineralisation in hematite breccia. NQ2 ½ core. 10

  11. Slide 11: Vulcan North Target Area - MT Survey 2025

    Vulcan North Target Area - MT Survey 2025 MT Phase Including All MT Stations Location of Conductive Zone in Relation to Drill Holes For personal use only VUD 008 is the most northerly hole. 11

  12. Slide 12: Vulcan North Target Area - MT Survey 2025

    Vulcan North Target Area - MT Survey 2025 For personal use only 2D model (cross section) from SW to NE with the projected boreholes around Vulcan (thin, vertical black lines) and showing an interpreted 1- 2km wide, 5km deep conductive feeder zone to the North-East. VUD 008 is represented by the thin

  13. Slide 13: Parkinson Dam (Tasman 100%)

    Parkinson Dam (Tasman 100%) Parkinson Dam Targets Surface Outcrops For personal use only  2026 - Planned Parkinson Dam Drilling Programme (EL6495 (34.7 km2)  Epithermal, Hydrothermal, IOCG, Porphyry Targets  Archimedes Consulting identified six drill targets comprising:  Epithermal / Hydrotherma

  14. Slide 14: Parkinson Dam – Best Drill Results

    Parkinson Dam – Best Drill Results For personal use only  PD 63: 21m at 21g/t Au, 83g/t Ag  High grade, narrow, steep structure: E-W strike  Open to west for approx. 1.5km  Significant, thick Pb & Zn: PD 70: 50m at 0.9% Zn, 0.3% Pb 14

  15. Slide 15: Parkinson Dam – High Grade Mineralisation

    Parkinson Dam – High Grade Mineralisation  PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t For personal use only Au, 152 g/t Ag)  Distinctive late-stage epithermal veining:  Quartz & haematite  Apatite, chlorite, muscovite (vanadiferous phengite)  Lead, zinc & copper poor  Gold (electrum, ~ 35

  16. Slide 16: Parkinson Dam Gold-Silver Mineralisation

    Parkinson Dam Gold-Silver Mineralisation For personal use only Free gold (electrum) associated with epithermal quartz and haematite 16

  17. Slide 17: Parkinson Dam Drilling ACM Defined Drill Targets

    Parkinson Dam Drilling ACM Defined Drill Targets on Magnetics: Location of magnetic semi vertical pipe-shaped features on the image of the Vertical Gradient of RTP magnetics. For personal use only The polygons outlining these features are relative to - 450m MSL.  2026 Planned Drilling – 6 undrilled

  18. Slide 18: Parkinson Dam Drill Target - IOCG - Shallow

    Parkinson Dam Drill Target 1 - IOCG - Shallow For personal use only Dense material shown in gravity survey appears to cluster around edge of magnetic feature. Interpreted possible dense breccia forming a cylindrical shape typical for IOCG- type deposits such as Olympic Dam or Ernest Henry. 18

  19. Slide 19: Drill Target (a) IOCG/Epithermal - Shallow

    Drill Target 2 (a) IOCG/Epithermal - Shallow For personal use only Undrilled\pipe-like structure below elliptical demagnetized zone, interpreted as hydrothermal fluid feeder to shallow crustal epithermal field, approximately 460m diameter, from 32 metres below the surface to a depth of over 2000m. 1

  20. Slide 20: Drill Target (b) Porphyry

    Drill Target 2 (b) Porphyry For personal use only Target T2(b) is the newly interpreted 500-metre-wide radius, circular gravity structure directly beneath Tasman’s earlier drill hole PD 63. This drill hole intersected encountered high grade gold and silver (21m at 21g/t Au and 83g/t Ag, including 9m

  21. Slide 21: Disclaimer

    Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of pro

  22. Slide 22: Competent Person's Statement

    Competent Person’s Statement The information in this presentation that relates to Exploration Results is based on and fairly represents information compiled by Ahmad Saleem, For personal use only Competent Person who is a member of the Australian Institute of Geoscientists. Mr Saleem is a part-time

  23. Slide 23: Contact

    For personal use only GREG SOLOMON EXECUTIVE CHAIRMAN Level 15, 197 St. Georges Terrace, Perth, Western Australia Telephone: +61 8 9282 5889 Mobile: +61 4 0206 0000 Email: gsolomon@tasmanresources.com.au This announcement was authorised for release by Greg Solomon, Chair 23

Tasman Resources — Shareholder Meeting (November 2025) on 6ix