Patriot Battery Metals Inc.

Patriot Battery Metals — Investor Presentation (May 2024)

38 slides from Patriot Battery Metals's investor presentation, May 2024

  1. Slide 1: Unlocking North America's Next Lithium District

    Slide 1: Unlocking North America's Next Lithium District

    UNLOCKING North America’s Next Lithium District May 2024

  2. Slide 2: Legal Disclaimer

    Slide 2: Legal Disclaimer

    LEGAL DISCLAIMER THIS MANAGEMENT PRESENTATION (the "presentation") was prepared as a summary FORWARD-LOOKING STATEMENTS are not guarantees of future performance and involve risks, fluctuations in currency markets (such as the US dollar versus the Canadian dollar); the volatility of overview only of

  3. Slide 3: Highlights

    Slide 3: Highlights

    PATRIOT BATTERY METALS Highlights Patriot Battery Metals Size, scale, and quality. Corvette is the already the largest lithium pegmatite in the Americas, the 8th largest globally, with significant is a hard-rock lithium exploration potential. Large spodumene crystals allows for exploration company f

  4. Slide 4: North American Downstream Landscape

    Slide 4: North American Downstream Landscape

    NORTH AMERICAN Downstream Landscape

  5. Slide 5: North American Downstream Landscape

    Slide 5: North American Downstream Landscape

    NORTH AMERICAN Downstream Landscape Gigafactory Cathode Active Material/precursor Cathode Active Material (CAM/pCAM) plants 5 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  6. Slide 6: North American Lithium Market

    Slide 6: North American Lithium Market

    NORTH AMERICAN DOWNSTREAM LANDSCAPE North American Lithium Market Lithium Supply (kt LCE) Downstream Demand Select OEMs 419 2027 Battery Manufacturing Capacity 4 plants planned 199 GWh ~700 GWh 115 4 plants planned 165 GWh Implies up to ~477 kt 38 of lithium carbonate equivalent demand 2024 2027 203

  7. Slide 7: North America's Largest Pegmatite Deposit

    Slide 7: North America's Largest Pegmatite Deposit

    THE CORVETTE PROPERTY North America’s Largest Pegmatite Deposit

  8. Slide 8: Large, High-Grade

    Slide 8: Large, High-Grade

    CV5 MINERAL RESOURCE ESTIMATE * Large, High-Grade Deposit/Project Location 3.8 Mt of LCE Resource Pilgangoora Australia 2.00% ≈ 8 Years Of TOTAL N.A. Demand In 2027 Manono DRC Greenbushes Australia Wodgina Australia 1.80% 109.2 Mt at 1.42% Li2O Goulamina Mali (Inferred) Manono Mt. Holland Australia

  9. Slide 9: Large, High-Grade

    Slide 9: Large, High-Grade

    CV5 MINERAL RESOURCE ESTIMATE * Large, High-Grade 2.00% Largest in the Americas in LCE Content 109.2 Mt at 1.42% Li2 O (Inferred) 1.80% 1.60% PAK + Spark Grota do Cirilo Corvette 1.40% (CV5) Separation Rapids Bandeira Whabouchi Colina NAL Kings Mountain 1.20% Root Adina Moblan James Bay Carolina Gra

  10. Slide 10: Near Infrastructure

    Slide 10: Near Infrastructure

    TOP TIER MINING JURISDICTION Near Infrastructure Canada CV5 Spodumene Pegmatite at Montreal the Corvette Property is Strategically Located in the James Bay Region of Northern Quebec • ~13 km from all-weather road access • ~14 km from existing hydropower lines • ~50 km from La Grande-4 hydropower sta

  11. Slide 11: The Largest in the Americas

    Slide 11: The Largest in the Americas

    CORVETTE PROPERTY The Largest in the Americas • 100% Owned • CV5 is the largest spodumene pegmatite in the Americas • CV5 traced by drilling over a strike length of 4.6 km and remains open along strike at both ends, and to depth along a significant portion of its length • MRE Update for the Corvette

  12. Slide 12: Similar Mineralogy & Metallurgy

    Slide 12: Similar Mineralogy & Metallurgy

    CV5 & CV13 Similar Minerology & Metallurgy Both CV5 and CV13 — Potentially Processable at the same Plant • Consistently large spodumene crystals (potentially from the same source) • Coarse-grained spodumene liberates effectively at ~6.5 mm and ~9.5 mm crush sizes • Low Fe203 present, ~0.65% in conce

  13. Slide 13: Similar Mineralogy & Metallurgy

    Slide 13: Similar Mineralogy & Metallurgy

    CV5 & CV13 Similar Minerology & Metallurgy • Amendable to simple DMS process • No grinding (high energy) • No flotation needed for high recovery • Lower capex and lower opex • Quicker and easier commissioning • Lower environmental impact 13 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  14. Slide 14: 109.2 Mt at 1.42% Li2O, Inferred

    Slide 14: 109.2 Mt at 1.42% Li2O, Inferred

    CV5 MINERAL RESOURCE ESTIMATE * 109.2 Mt at 1.42% Li2O, Inferred • Geological model interprets a predominantly single, continuous, principal pegmatite body resulting in easier mining methods, lower costs • The size means it could feed multiple Gigafactories for decades or one for generations • The J

  15. Slide 15: Albemarle's Strategic Investment

    Slide 15: Albemarle's Strategic Investment

    ALBEMARLE’ S Strategic Investment $109 M INVESTMENT BY ALBEMARLE VALIDATES CORVETTE LITHIUM PROJECT Entered into a 9-month MOU to explore downstream opportunities. Entered into an Investor Rights Agreement INVESTMENT AT IMPLYING A ≈ • 12-month term $15.20 PER SHARE TO ACCELERATE $2.2B VALUATION • Al

  16. Slide 16: Albemarle's Strategic Investment

    Slide 16: Albemarle's Strategic Investment

    ALBEMARLE’ S Strategic Investment The Downstream Opportunity • Lithium chemical refining is currently the missing link in the Western supply chain • PMET considers important to partner with future refiners/customers looking for multi-generational sustainable sources of lithium • Albemarle is one of

  17. Slide 17: Proven Pathway

    Slide 17: Proven Pathway

    PERMITTING Proven Pathway Canadian Permitting Process • Formal Federal authorization process • Thousands of HADD permits are (referred to as HADD) managed issued by the DFO annually for a by the Department of Fisheries & large variety of industries in Canada Oceans (“DFO”) to obtain a permit • There

  18. Slide 18: Steps of the ESIA Process

    Slide 18: Steps of the ESIA Process

    STEPS OF THE ESIA PROCESS 18 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  19. Slide 19: Focus on Execution & Value Creation

    Slide 19: Focus on Execution & Value Creation

    CATALYSTS Focus on Execution & Value Creation 2023 Q1 24 Q2 24 Q3 24 Q4 24 2025 2026 2027 2028 2029 CV5 and Phase One Production Drill Program and Results Update Mineral Resource Estimate Technical Work to Support PFS Baseline Environmental Monitoring Project Description for Permitting Permitting Co

  20. Slide 20: Delivering Value

    Slide 20: Delivering Value

    STRATEGY Delivering Value Develop CV5 Continue to Drill Explorati on/D evel opme nt Deliver CV5 initial mineral Extend CV5 westward to CV13 • Surface work on the remaining resource estimate prospective trend yet to be assessed Infill drilling at CV5 • Progress EIS and permits for • Discover and dril

  21. Slide 21: Corporate Snapshot

    Slide 21: Corporate Snapshot

    CORPORATE Snapshot

  22. Slide 22: Corporate Snapshot: Trading Update and Shareholder Register

    Slide 22: Corporate Snapshot: Trading Update and Shareholder Register

    CORPORATE SNAPSHOT Trading Update Shareholde r Register $20.00 4.0 0% 1% 2% 18% 21% 26% $15.00 3.0 3% Volume (mm) 54% 6% C$/sh $10.00 2.0 21% 48% $5.00 1.0 Australia HNW/family office United States Corporate UK Retail $0.00 - Canada Institutional Asia Insider Europe Volume (TSX) Voume (ASX CDI on an

  23. Slide 23: Corporate Snapshot: Trading Update, Analyst Coverage

    Slide 23: Corporate Snapshot: Trading Update, Analyst Coverage

    CORPORATE SNAPSHOT Trading Update Analyst Coverage As at April 15, 2024 CAD (m) Basic Share Outstanding 135.6 Dilutive Securities 11.3 FDITM Shares 146.9 FDITM Market Cap: $1,030 Cash (as of end of FQ3 Dec. 31st) $106 Potential Cash from FDITM Options & other $4 23 TSX: PMET ASX: PMT OTCQX: PMETF WB

  24. Slide 24: Our Team

    Slide 24: Our Team

    PATRIOT BATTERY METALS Our Team

  25. Slide 25: Proven Team with a Track Record of Value Creation

    Slide 25: Proven Team with a Track Record of Value Creation

    PROVEN TEAM WITH A TRACK RECORD OF VALUE CREATION INDEPENDENT DIRECTORS Pierre Boivin (Chairman) Mélissa Desroches Brian Jennings INVESTOR RELATIONS Ken Brindsen Blair Way Natacha Darren L. Alix Drapack Greg Barfoot Bradley Seward Olivier Caza- B.Eng. (Mining), B.Sc., MBA Garoute Smith P.Eng., MBA,

  26. Slide 26: Thank you

    Slide 26: Thank you

    Thank you PATRIOT BATTERY METALS +1 (604) 279 8709 info@patriotbatterymetals.com patriotbatterymetals.com

  27. Slide 27: Appendix

    Slide 27: Appendix

    Appendix

  28. Slide 28: Shaakichiuwaanan Camp

    Slide 28: Shaakichiuwaanan Camp

    INFRASTRUCTU RE Shaakichiuwaanan Camp The Shaakichiuwaanan Camp is located at KM270 on the Trans-Taiga Road. The camp includes the following facilities: • 80 room camp for Phase 1; expansion • Core management and storage with to a total of 150 rooms planned for fuel facility and potable water supply

  29. Slide 29: All Weather Road

    Slide 29: All Weather Road

    INFRASTRUCTU RE All Weather Road • The All-Season Access Road extends south from KM270 on the Trans-Taiga Road a distance of 20.2 km south to the CV5 deposit • The road includes three bridges (ranging from 30 feet to 100 feet in length) and 12 culvert installations • The road has been constructed to

  30. Slide 30: Spodumene Pegmatite Clusters

    Slide 30: Spodumene Pegmatite Clusters

    CV5 & ADJACENT Spodumene Pegmatite Clusters • CV5 is currently a 4.6 km spodumene pegmatite as defined by drilling, which remains open • CV13 is currently a 2.3km spodumene pegmatite as defined by drilling, which remains open o New high-grade zone discovered with 34.4 m at 2.90% Li2O, including 21.9

  31. Slide 31: CV9 Spodumene Pegmatite Drilling

    Slide 31: CV9 Spodumene Pegmatite Drilling

    CV9 SPODUMENE PEGMATI TE Drilling • Wide intervals of variably mineralized spodumene- bearing pegmatite intersected in maiden drill program • 99.9 m at 0.39% Li2O, including 30.6 m at 0.80% Li2O (CV23-345) • 15.7 m at 0.76% Li2O, including 10.8 m at 1.00% Li2O (CV23-267) • The CV9 Pegmatite remains

  32. Slide 32: CV5 Geological Model: Side View

    Slide 32: CV5 Geological Model: Side View

    CV5 GEOLOGICAL MODEL Side View Side view of CV5 Spodumene Pegmatite geological model looking northerly (340o) — principal pegmatite only. The principal pegmatite contains ~93% (101.8 Mt) of the total inferred resource tonnage (109.2 Mt) at CV5*. *CV5 mineral resource (109.2 Mt at 1.42% Li2 O and 160

  33. Slide 33: Pit Constrained Block Model

    Slide 33: Pit Constrained Block Model

    CV5 MINERAL RESOURCE * Pit Constrained Block Model Select views of the pit constrained, inferred classified block model. The CV5 mineral resource* block model, at a pit-constrained inferred level of confidence, incorporates ~3.4 km of the total 4.6 km long pegmatite as has been defined by drilling t

  34. Slide 34: Sensitivity Analysis

    Slide 34: Sensitivity Analysis

    CV5 MINERAL RESOURCE * Cut-off Grade Li2O ≥ Cut-off Sensitivity Classification Tonnes ≥ Cut-off Li2O (%) (%) 0.10 Inferred 123,357,000 1.28 Analysis 0.20 Inferred 116,246,000 1.35 0.30 Inferred 112,215,000 1.39 0.40 Inferred 109,242,000 1.42 0.50 Inferred 106,285,000 1.45 0.60 Inferred 102,461,000 1

  35. Slide 35: Model Cross-Sections

    Slide 35: Model Cross-Sections

    CV5 GEOLOGICAL MODEL Model Cross-Sections 35 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  36. Slide 36: Model Cross-Sections

    Slide 36: Model Cross-Sections

    CV5 GEOLOGICAL MODEL Model Cross-Sections 36 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  37. Slide 37: Mineral Resource Statement

    Slide 37: Mineral Resource Statement

    CV5 MAIDEN Mineral Resource Statement Cut-off Tonnes Li2O Ta2O5 Contained Li2O Contained LCE Grade Classification (Mt) (%) (ppm) (Mt) (Mt) Li2O (%) 0.40 Inferred 109.2 1.42 160 1,551,000 3,835,000 • Mineral resources were prepared in accordance with National Instrument 43-101 — Standards for • Drill

  38. Slide 38: Notes: Peer Comparison Information

    Slide 38: Notes: Peer Comparison Information

    NOTES PEER COMPARISO N INFORMATION Reserves (Mt LCE) Resources (Mt LCE) — Inclusive of Reserves Company Project Stage Information Source(s) Proven Probable Total Reserves Measured Indicated Inferred Total Resources AVZ Minerals Manono (75%) Feasibility 2.0 2.0 4.0 3.1 5.3 3.9 12.3 AVZ Minerals June

Source: Internet Archive copy of patriotbatterymetals.com

More decks from Patriot Battery Metals Inc.