Patriot Battery Metals — Investor Presentation (April 2025)
39 slides from Patriot Battery Metals's investor presentation, April 2025
Slide 1: North America's Next Lithium Powerhouse
NORTH AMERICA’S NEXT LITHIUM POWERHOUSE April 2025
Slide 2: Investment Highlights
Investment Highlights ~C$69m1 strategic Offtake with PowerCo SE Potential for additional An emerging, low-cost investment from (“PowerCo”), a subsidiary of cornerstone project funding developer of lithium into Volkswagen Group to fund Volkswagen, for 100ktpa of from Volkswagen Group to exploration,
Slide 3: Strategic Partnership with Volkswagen/PowerCo
1 Strategic Partnership with Volkswagen/PowerCo
Slide 4: Strategic Rationale
Strategic Rationale Equity investment completed at a premium1 – underscores confidence in the size, quality, & strategic importance of the Shaakichiuwaanaan Project to the North American and European battery supply chains ~C$69M2 proceeds will predominantly be used to complete the FS and ESIA, adv
Slide 5: Tier 1 Offtake Partner Secured
Tier 1 Offtake Partner Secured Anticipated Spodumene Production (kt SC5.5 target) 100ktpa offtake volumes Remaining volumes • Vertically integrated battery manufacturer and 100% owned subsidiary of Volkswagen - largest European based car manufacturer and leader in EV sales 900 Offtake represents ~25
Slide 6: Shaakichiuwaanaan Project
2 Shaakichiuwaanaan Project 6 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 7: Largest Lithium Pegmatite Resource in the Americas
SHAAKICHIUWAANAAN – INVESTMENT HIGHLIGHTS Largest Lithium Pegmatite Resource in the Americas Lithium Pegmatite Mineral Resource by Grade and Tonnage 2.00% Production Development PMET 1.80% 1.60% Shaakichiuwaanaan Grade (%Li2O) PAK + Spark Grota do Cirilo 1.40% Separation Rapids Bandeira Whabouchi Co
Slide 8: 2025 Winter Drill Program
SHAAKICHIUWAANAAN PROJECT 2025 Winter Drill Program Winter drilling began in late January and targets 15,000m until April with three primary objectives.1 • Extend the high-grade Vega Zone (CV13 Pegmatite) westward along an interpreted structural corridor toward the CV12 Pegmatite, • Test the highl
Slide 9: High-Grade Discovery at CV13 — Vega Zone
SHAAKICHIUWAANAAN — GEOLOGY/RESOURCES High-Grade Discovery at CV13 — Vega Zone1 • New high-grade spodumene pegmatite zone discovered at CV13: • 34.4 m at 2.90% Li2O, including 21.9 m at 3.58% Li2O (CV24-470), discovery hole. • 51.7 m at 1.77% Li2O, including 9.7 m at 5.16% Li2O (CV24-525). • 35.3 m
Slide 10: Exploration Target
SHAAKICHIUWAANAAN — GEOLOGY/RESOURCES Exploration Target 1 • Significant Exploration Target outlines the potential for additional tonnage at the Shaakichiuwaanaan Property. • 146 to 231 Mt at 1.0 to 1.5% Li2O. The potential quantity and grade of the Exploration Target are conceptual in nature. There
Slide 11: Other Critical Metals – Significant Cesium Discovery
SHAAKICHIUWAANAAN — GEOLOGY/RESOURCES Other Critical Metals – Significant Cesium Discovery1 • Cesium, an exceptionally rare and valuable critical metal, discovered over a very large area coincident with the Vega Zone of approximately 600 m x 400 m, ranging from 1-2 m to >10 m thick and remains open,
Slide 12: UG — High-grade Mining Potential
SHAAKICHIUWAANAAN PROJECT UG — High-grade Mining Potential • Selectively targeting high-grade mining areas has the CV5 Side View Highlighting the High-Grade Nova Zone potential to reduce costs during periods of lower lithium pricing, improving optionality of the mine. • While a higher-grade, smaller
Slide 13: UG — High-grade Mining Potential
SHAAKICHIUWAANAAN PROJECT UG — High-grade Mining Potential Diluted Recovered U/G Mineral Resource Per Grade Bin • Mining and processing a higher grade has the effect of increasing Avg. Grade per Grade Bins Tonnes per Cumulative Cumulative the ‘yield-to-product’ derived from processing the Resource.
Slide 14: Feasibility Study
SHAAKICHIUWAANAAN PROJECT Feasibility Study • Feasibility Study well underway. • Targeting completion Q3 2025. • Simple DMS-only processing plant. • Average LOM recovery rate expected to be in line with 2 the PEA (69.5% ) • Phased approach could see the installation of a 2.5 Mtpa processing plant in
Slide 15: PEA Highlights
SHAAKICHIUWAANAAN – PEA HIGHLIGHTS PEA Highlights After-Tax NPV8% Real After-Tax IRR Stage 1 Net Capex Payback Period C$2.9 Billion 34% C$640 Million 2 3.6 Years (US$2.2 Billion) (US$487 Million) Estimated break-even spodumene 1 US$1,375/t (SC5.5 FOB Bécancour) price (SC6) of US$587/t (on EBITDA bas
Slide 16: Cree Engagement
Cree Engagement • Site celebrations/ceremony and feast. • Approximately 40 community members, including the Tallyman and his family. • The entire site team. • Camp Shaakichiuwaanaan • The name means climbing a hill or a mountain. • As chosen by the Tallyman, his family and supported by the broader C
Slide 17: Baseline Data Collection
ESIA APPROACH Baseline Data Collection Timeline 2022 2023 2024 2025 Activity Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Baseline Studies Completed Completed Underway To come Biophysical Geochemistry (phase 1; phase 2 – kinetic testing) Soils Hydrology and bathymetry Surface water quality and se
Slide 18: Mining Approval Process
SHAAKICHIUWAANAAN PROJECT Mining Approval Process Project Description Environmental Impact Assessment Report COMEV / COMEX Deliberation Examples from ESIA submittal to authorization Project guidelines Baseline Data collection (nearly complete) Alternatives Assessment Stornoway Renard Diamond
Slide 19: Market / Industry Commentary
3 Market / Industry Commentary
Slide 20: Cutting into the Cost Curve
SHAAKICHIUWAANAAN — LITHIUM MARKET COMMENTARY Cutting into the Cost Curve • Current pricing is not high enough to 1,800 Growth Capex incentivise the new required production. 1,600 Freight / Royalties / • Supply cuts are happening with current 1,400 Sustaining Capex C1 FOB producing mines going into
Slide 21: North American Downstream Landscape
MARKET / INDUSTRY COMMENTARY North American Downstream Landscape Supply (weighted, thousand tonnes LCE) 325 Demand (Thousand tonnes LCE) 225 153 129 24 42 Earlier Stage Fully Funded 2024 2027 2030 Operating Select EV cell plants Others 4 plants 5 plants (planned) (operating and planned) 4 plants USA
Slide 22: Demand Growth
4, Demand Growth
Slide 23: Consistently Higher EV Sales
SHAAKICHIUWAANAAN — MARKET COMMENTARY Consistently Higher EV Sales • Lithium Iron Phosphate (LFP) cells in China are now at a very price competitive level, having halved in sale-price in the last 12 months. • EVs are now price competitive in the US market, with the cheapest 300-mile range EV cheaper
Slide 24: BESS Demand Surging
SHAAKICHIUWAANAAN — MARKET COMMENTARY BESS Demand Surging • Battery Energy Storage Systems (BESS) installation has grown by 52% YoY in 2024, reaching more than 207 GWh. This is enabled due to lower LFP cell costs. • US and Canada are expected to grow at 84% YoY, with approximately 25% of global depl
Slide 25: Demand at a Tipping Point
SHAAKICHIUWAANAAN — MARKET COMMENTARY Demand at a Tipping Point Battery margins are being squeezed EVs Pass a Key Measure of Price Parity in US China sell spot prices and manufacturing costs Several 300-mile range EVs now cost less than the average new car 125 100 100 $/Kilowatt-hour 75 $’000 50 50
Slide 26: Corporate Snapshot
S Corporate Snapshot _
Slide 27: Exploration, Resource Growth, and Project Delivery
Exploration, Resource Growth, and Project Delivery Continue to Drill Exploration/ Community Develop CV5 Development • Extend CV5 eastward to CV4 and • Detailed surface mapping at CV5 • Build and enhance relationships Upgraded CV5 mineral westward to CV13 and CV13 to refine geological with Chisasibi
Slide 28: Proven Management Team with a Track Record of Value Creation
PROVEN MANAGEMENT TEAM WITH A TRACK RECORD OF VALUE CREATION Ken Brindsen Natacha Garoute Frédéric Mercier- Darren L. Smith Alix Drapack Alex Eastwood Olivier B.Eng. (Mining), CPA, LLB Langevin M.Sc., P.Geo. P.Eng., MBA, ICD.D BEc, LLB Caza-Lapointe MAUSIMM, MAICD CFO Eng., M.Sc Executive Vice Execu
Slide 29: Corporate Snapshot: Shareholder Register and Corporate Structure
CORPORATE SNAPSHOT Corporate Structure Shareholder Register 3% Pro-Forma Equity Raise CAD (m) 4% 3% 0% 5% Basic Shares Outstanding 162.2 19% 15% 36% Dilutive Securities 6.5 51% Fully Diluted Shares 168.7 20% Market Cap (as of April 7th,2025) : $294 23% 21% Cash (as of Dec 31) + VW Proceeds $103 Othe
Slide 30: Thank you
Thank you PATRIOT BATTERY METALS +1 (604) 279 8709 info@patriotbatterymetals.com patriotbatterymetals.com 30 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 31: Appendix
Appendix
Slide 32: Future Infrastructure
SHAAKICHIUWAANAAN – MINING, PROCESSING, AND INFRASTRUCTURE Future Infrastructure • Power – Low-carbon footprint, low-cost and mainly renewable electricity sourced from Hydro-Québec – The electrical substation will be located at the main site, approximately 55 km south of the Hydro- Québec’s 315 KV T
Slide 33: Infrastructure Upside, La Grande Alliance
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Infrastructure Upside, La Grande Alliance • Road between Renard Mine and the Trans-Taiga1 – During Years 6-15 of LGA plan, a proposed road extension between the Renard Mine and the Trans-Taiga Road is envisioned – This key piece of infrastruc
Slide 34: Mineral Resource Statement
CV5 AND CV13 PEGMATITES Mineral Resource Statement Li2O Ta2O5 Contained Li2O Contained LCE Pegmatite Classification Tonnes (%) (ppm) (Mt) (Mt) Indicated 80,130,000 1.44 163 1.15 2.85 CV5 & CV13 Inferred 62,470,000 1.31 147 0.82 2.03 • Mineral Resources were prepared in accordance with National Instr
Slide 35: Peer Comparison Information – Lithium Pegmatite Mineral Resources (Americas)
P E E R COMPARISON INFORMATION – LITHIUM PEGMATITE MINERAL RESOURCES (AMERICAS) Inclusive of Mineral Resources Company Project Stage Reserves Measured Indicated Inferred Information Source(s) Mt %Li2O Mt %Li2O Mt %Li2O Patriot Battery Metals Inc. Shaakichiuwaanaan Development – – – 80.1 1.4% 62.5 1.
Slide 36: Peer Comparison Information – Lithium Pegmatite Mineral Reserves (Americas)
P E E R COMPARISON INFORMATION – LITHIUM PEGMATITE MINERAL RESERVES (AMERICAS) Mineral Reserves Company Project Stage Proven Probable Information Source(s) Mt %Li2O Mt %Li2O Patriot Battery Metals Inc. Shaakichiuwaanaan Development – – – – Sigma Lithium Corporation Grota do Cirilo Production 38.5 1.
Slide 37: Important Information
IMPORTANT INFORMATION This presentation is dated April 9th, 2025, and has been prepared by Patriot Battery Metals Inc and funding from available government infrastructure funds. It is possible that such funding may only assumptions and factors generally associated with the mining industry; the abili
Slide 38: Important Information
IMPORTANT INFORMATION QUALIFIED/COMPETENT PERSONS the activity he is undertaking to qualify as a Competent Person as such term is defined in the JORC assays, geophysical surveys (magnetics, IP-resistivity), and remote sensing data (LiDAR and Code (2012 edition) and a Qualified Person (as such term i
Slide 39: Important Information
IMPORTANT INFORMATION NON-IFRS AND OTHER FINANCIAL MEASURES This presentation includes non-IFRS financial measures and non-IFRS financial ratios. The Company believes that these measures provide additional insight, but these measures are not standardized financial measures prescribed under IFRS and
Patriot Battery Metals — Investor Presentation (April 2025) on 6ix