  1. Slide 1: Investor Day Presentation

    Shaakichiuwaanaan - North America’s Next Lithium Powerhouse Investor Day Presentation September 2024

  2. Slide 2: Important Information

    IMPORTANT INFORMATION This presentation has been prepared by Patriot Battery Metals Inc (Company) and is authorised combination of potential strategic partnering, strategic debt, equity financing, potential operating the Company's ability to meet or achieve estimates, projections and forecasts; the

  3. Slide 3: Important Information

    IMPORTANT INFORMATION QUALIFIED/COMPENTENT PERSONS NON-IFRS AND OTHER FINANCIAL MEASURES interpretation of a consolidated dataset of surface rock sample descriptions and assays, outcrop mapping and descriptions, drill hole logs and core sample assays, geophysical surveys, and remote sensing data. Th

  4. Slide 4: Geology / Resources

    1 Geology / Resources 4 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  5. Slide 5: Largest Lithium Pegmatite Resource in the Americas

    SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Largest Lithium Pegmatite Resource in the Americas Lithium Pegmatite Mineral Resource by Grade and Tonnes 1.80% Production Development PMET 1.60% Shaakichiuwaanaan PAK + Spark Grota do Cirilo 1.40% Separation Rapids Bandeira Whabouchi Galaxy Colina Grade (%Li2

  6. Slide 6: Mineral Resource

    SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Mineral Resource • The PEA is underpinned by the CV5 Spodumene Pegmatite Oblique view of the CV5 Spodumene Pegmatite Block Model component of Shaakichiuwaanaan updated Mineral (classified material unconstrained) (not to scale) Resource Estimate which was relea

  7. Slide 7: Summer-Fall 2024 Exploration

    SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Summer-Fall 2024 Exploration • Drilling began in June and is planned to continue through mid Oct – total of ~55,000 m anticipated • Continued infill at CV5 to support conversion of Inferred to Indicated classification to underpin Feasibility Study • Geotechnic

  8. Slide 8: High-Grade Discovery at CV13 – Vega Zone

    SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES High-Grade Discovery at CV13 – Vega Zone1 • New high-grade spodumene pegmatite zone discovered at CV13: • 34.4 m at 2.90% Li2O, including 21.9 m at 3.58% Li2O (CV24-470), discovery hole. • 51.7 m at 1.77% Li2O, including 9.7 m at 5.16% Li2O (CV24-525). • 35.3

  9. Slide 9: Exploration Target

    SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Exploration Target 1 • Significant Exploration Target outlines the potential for additional tonnage at the Shaakichiuwaanaan Property o 146 to 231 Mt at 1.0 to 1.5% Li2O. The potential quantity and grade of the Exploration Target are conceptual in nature. Ther

  10. Slide 10: Planned 2025 Exploration

    SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES CV12 Spodumene Pegmatite Planned 2025 Exploration • Up to approximately 80,000 m of drilling anticipated to 31 Dec 2025 • Continued delineation of CV5 & CV13 along strike and to depth, & initial testing of proximal corridors • Initial drill testing of other sp

  11. Slide 11: PEA Highlights

    2 PEA Highlights 11 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  12. Slide 12: PEA Overview

    SHAAKICHIUWAANAAN – PEA HIGHLIGHTS PEA Overview PEA highlights the Shaakichiuwaanaan1 Project as a potential North American lithium raw materials supply base Preliminary Hybrid Mine Plan PEA Shows the Phased Funding Strategy Upside Economics Stage 1 open-pit Potential to Development Strong inbound O

  13. Slide 13: Patriot's Phased Development Strategy

    SHAAKICHIUWAANAAN – PEA HIGHLIGHTS Patriot’s Phased Development Strategy Downstream (Opportunity) Stage 2 (Expansion Phase) Future downstream opportunity (Not included in the PEA)  Provides increased access to North American Stage 1 and European lithium supply chains ~800ktpa expansion (5.0 Mtpa pl

  14. Slide 14: PEA Highlights

    SHAAKICHIUWAANAAN – PEA HIGHLIGHTS PEA Highlights After-Tax NPV8% Real After-Tax IRR Stage 1 Net Capex Payback Period C$2.9 Billion 34% C$640 Million 2 3.6 Years (US$2.2 Billion) (US$487 Million) Estimated break-even spodumene 1 US$1,375/t (SC5.5 FOB Bécancour) price (SC6) of US$587/t (on EBITDA bas

  15. Slide 15: Mining, Processing and Infrastructure

    3 Mining, Processing and Infrastructure 15 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  16. Slide 16: Mine Plan

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Mine Plan Mt • Hybrid mine plan which aims to use both open pit 8.0 and underground (UG) mining methods OP Ore Mined OP and UG anticipated to account for 56% and 44% 7.0 of ore mined, respectively • UG benefits relative to open pit only: UG O

  17. Slide 17: Open-Pit Mining

    CV5 PEA Pit Design SHAAKICHIUWAANAAN Open-Pit Mining • Pit shell optimization resulted in a range of shells for a range of prices, including the base price of US$1,375 per tonne SC5.5 (RF 1). The selected pit shell, for the purpose of guiding the pit design, was generated at an SC5.5 price of US$894

  18. Slide 18: UG - High-grade Mining Potential

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE UG - High-grade Mining Potential CV5 Side View Highlighting the High-Grade Nova Zone • Selectively targeting high-grade mining areas has the potential to reduce costs during periods of lower lithium pricing, improving optionality of the mine

  19. Slide 19: UG - High-grade Mining Potential

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE UG - High-grade Mining Potential • The hybrid approach potentially provides significant Example of Nova Zone Stope Tonnes and Li2O% Grade flexibility, allowing access to higher-grade zones as needed, which is essential for maximizing Project

  20. Slide 20: Processing and Recovery

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Processing and Recovery • Simple DMS-only processing plant • Phased approach could see the installation of a 2.5Mtpa1 processing plant in Stage 1 and another 2.5Mpta processing plant to run in parallel in Stage 2 • The conceptual processing f

  21. Slide 21: Simple Minerology & Metallurgy

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Simple Minerology & Metallurgy Metallurgical Test Work Recovery (global) Results & Industry Based Recovery Estimates for 3 x Size Range DMS Process Plant Both CV5 and CV13 — Potentially Processable at the same Plant • Consistently large spodu

  22. Slide 22: Infrastructure

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Infrastructure • Power – Low-carbon footprint, low-cost and mainly renewable electricity sourced from Hydro-Québec – The electrical substation will be located at approximately 55 km south of the Hydro-Québec’s 315 KV Tilly substation • Transp

  23. Slide 23: Infrastructure Upside, La Grande Alliance

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Infrastructure Upside, La Grande Alliance • Road between Renard Mine and the Trans-Taiga1 – During Years 6-15 of LGA plan, a proposed road extension between the Renard Mine and the Trans-Taiga Road is envisioned – This key piece of infrastruc

  24. Slide 24: Shaakichiuwaanaan Camp

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Shaakichiuwaanaan Camp The camp is located at KM270 on the Trans-Taiga Road The camp is a critical infrastructure considering upcoming closure of Mirage Outfitters in Q4 2024 and includes the following facilities: • 80 room camp for Phase 1;

  25. Slide 25: All Weather Road

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE All Weather Road • The All-Season Access Road extends south from KM270 on the Trans-Taiga Road a distance of ~20 km south to the CV5 deposit • The road is a critical investment and will enable significant cost savings on future drilling and e

  26. Slide 26: Permitting and Community/First Nations Engagement

    4 Permitting and Community/First Nations Engagement 26 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  27. Slide 27: Cree Engagement

    Cree Engagement • Recent site celebrations / ceremony and feast • Approximately 40 community members, including the Tallyman and his family • The entire site team • Camp Shaakichiuwaanaan • The name means climbing a hill or a mountain (hills/mountains) • As chosen by the Tallyman, his family and sup

  28. Slide 28: Shaakichiuwaanaan: Impact Assessment Process

    SHAAKICHIUWAANAAN – PERMITTING AND COMMUNITY/FIRST NATIONS ENGAGEMENT Shaakichiuwaanaan: Impact Assessment Process Provincial Assessment & Review Procedure • All mining projects located south of the 55th parallel, in the territory is governed by the James Bay and Northern Quebec Agreement (“JBNQA”)

  29. Slide 29: Environmental Baseline Work

    SHAAKICHIUWAANAAN – PERMITTING AND COMMUNITY/FIRST NATIONS ENGAGEMENT Environmental Baseline Work Gantt chart of Environmental baseline work completed to date and planned to support the submission of the ESIA 29 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  30. Slide 30: Mining Approval Process

    SHAAKICHIUWAANAAN – PERMITTING AND COMMUNITY/FIRST NATIONS ENGAGEMENT Mining Approval Process Project Description Environmental Impact Assessment Report • Baseline Data collection (2 years) Impact Benefit Agreement • Project guidelines • Alternatives Assessment (Commitments to Local Communities) • P

  31. Slide 31: Market Commentary

    5 Market Commentary 31 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  32. Slide 32: Supply Ramping up at a cost…

    SHAAKICHIUWAANAAN – MARKET COMMENTARY Supply Ramping up at a cost… • Supply-side response from the Chinese producers has Zimbabwe – Hard Rock Cost of Production been successful in the last couple of years, however it has come at a significant cost 1,400 • Just one example, look at Zimbabwe: All in c

  33. Slide 33: Demand at a Tipping Point

    SHAAKICHIUWAANAAN – MARKET COMMENTARY Demand at a Tipping Point • Chinese dominance of New Energy industries is becoming increasingly Battery margins are being squeezed clear, with its leading position in the lithium-ion supply chain growing China sell spot prices and manufacturing costs 125 • Lithi

  34. Slide 34: North American Downstream Landscape

    SHAAKICHIUWAANAAN – MARKET COMMENTARY North American Downstream Landscape Gigafactory Cathode Active Material/precursor Cathode Active Material (CAM/pCAM) plants 34 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  35. Slide 35: Exploration, Resource Growth and Project Delivery

    Exploration, Resource Growth and Project Delivery Continue to Drill Exploration/ Community Develop CV5 Development Extend CV5 westward • Surface work on the • Build and enhance Upgraded CV5 mineral to CV13 remaining prospective trend relationships with Chisasibi resource estimate yet to be assessed

  36. Slide 36: Appendices Corporate Snapshot

    Appendices Corporate Snapshot

  37. Slide 37: Proven Management Team with a Track Record of Value Creation

    PROVEN MANAGEMENT TEAM WITH A TRACK RECORD OF VALUE CREATION Ken Brindsen Natacha Garoute Alex Eastwood Darren L. Smith Alix Drapack Greg Barfoot Olivier B.Eng. (Mining), CPA, LLB BEc, LLB M.Sc., P.Geo. P.Eng., MBA, ICD.D M.Eng., MBA MAUSIMM, MAICD Executive Vice President, Executive Vice President,

  38. Slide 38: Corporate Snapshot: Trading Update and Shareholder Register

    CORPORATE SNAPSHOT Trading Update Shareholder Register $20.00 9.0 8.0 3%1% 0% 5% 3% 7.0 $15.00 23% 15% 6.0 37% 49% Volume (mm) 5.0 C$/sh $10.00 16% 4.0 24% 3.0 24% $5.00 Australia Other 2.0 Canada Institutional 1.0 United States HNW/family office $0.00 - Europe Retail Dec-22 Dec-23 Jan-23 Jun-23 Jan

  39. Slide 39: Corporate Snapshot: Analyst Coverage

    CORPORATE SNAPSHOT Trading Update Analyst Coverage Pro-Forma Equity Raise CAD (m) Basic Shares Outstanding 141.5 Dilutive Securities 11.1 Fully Diluted Shares 152.2 Market Cap (as of November 6th) : $455M Cash (as of June 30th) $102 Potential Cash from FDITM Options & other $6.1

  40. Slide 40: Appendix Mineral Resource & Peer Comparison

    Appendix Mineral Resource & Peer Comparison

  41. Slide 41: Mineral Resource Statement

    CV5 AND CV13 Mineral Resource Statement Li2O Ta2O5 Contained Li2O Contained LCE Pegmatite Classification Tonnes (%) (ppm) (Mt) (Mt) Indicated 80,130,000 1.44 163 1.15 2.85 CV5 & CV13 Inferred 62,470,000 1.31 147 0.82 2.03 • Mineral Resources were prepared in accordance with National Instrument 43-10

  42. Slide 42: Sensitivity Analysis

    CV5 AND CV13 MINERAL RESOURCE * Sensitivity Analysis CV5 Spodumene Pegmatite CV13 Spodumene Pegmatite Indicated Inferred Indicated Inferred Cut-off grade Average grade Average grade Average grade Average grade Tonnes ≥ cut- (%) Tonnes ≥ cut-off (Li2O) ≥ cut-off Tonnes ≥ cut-off (Li2O) ≥ cut-off (Li2

  43. Slide 43: Peer Comparison Information – Resources

    N O T E S P E E R COMPARISON INFORMATION – RESOURCES (SLIDE 5) Reserves (Mt LCE) Resources (Mt LCE) — Inclusive of Reserves Company Project Stage Information Source(s) Proven Probable Total Reserves Measured Indicated Inferred Total Resources AVZ Minerals Manono (75%) Feasibility 2.0 2.0 4.0 4.0 11.

  44. Slide 44: Peer Comparison Information – Production Capacity

    N O T E S P E E R COMPARISON INFORMATION – PRODUCTION CAPACITY (SLIDE 13) Name Ticker Project Name Stage Degree of Study Price Assumption (US$/t SC6) Mine Life Information Source - Current Production Capacity Information Source - Planned Expanded Capacity Pilbara Minerals PLS Pilgangoora Production

  45. Slide 45: Thank you

    Thank you PATRIOT BATTERY METALS +1 (604) 279 8709 info@patriotbatterymetals.com patriotbatterymetals.com 45 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET