Cassius Mining Ltd · ASX:CMD

Cassius Mining — Investor Presentation (November 2017)

46 slides from Cassius Mining's investor presentation, November 2017

  1. Slide 1: Together, Breaking New Ground

    TOGETHER, BREAKING NEW GROUND

  2. Slide 2: Disclaimer

    DISCLAIMER The purpose of this presentation is to provide general information about Cassius Mining Limited (the “Company”). Unless otherwise stated herein, the information in this presentation is based on the Company’s own information and estimates may also contain information that has not been inde

  3. Slide 3: The Opportunity

    THE OPPORTUNITY

  4. Slide 4: Who Is Cassius Mining Limited?

    WHO IS CASSIUS MINING LIMITED?

  5. Slide 5: Who Is Cassius Mining Limited?

    WHO IS CASSIUS MINING LIMITED? ASX Listed Mining Co. (CMD) Advanced Stage Gold Exploration Large Scale Licensed Project in Upper East Region in Ghana Also hold a significant fully licenced limestone asset in Madagascar

  6. Slide 6: Project Background

    PROJECT BACKGROUND

  7. Slide 7: Project Background

    PROJECT BACKGROUND De Blocking of small scale area Large Scale Licence Issued in Dec 2016 Have developed strong relationships in Ghana (Government and Local) Tremendous levels of engagement with Local Community

  8. Slide 8: Licence Acquisition

    LICENCE ACQUISITION

  9. Slide 9: Licence Acquisition

    LICENCE ACQUISITION ON 23 November 2017, Cassius Mining Limited announced the acquisition of the whole 13.79km2 large scale licence area The Licence Area is an integral piece of the regional puzzle And therefore represents a very interesting opportunity for investment

  10. Slide 10: The Team

    THE TEAM

  11. Slide 11: The Team

    David Chidlow Peter Gleeson Project Managers and Project Technical Director Senior Consultant Geologist Locally Experienced Geos

  12. Slide 12: Geology

    GEOLOGY

  13. Slide 13: ne Project ©

    ee 2 z ne Project © * AS Shaanxi , 3 Project ‘

  14. Slide 14: Early Stage Exploration

    EARLY STAGE EXPLORATION Significant Results from Initial Exploration Program include (lengths are along hole, at -60 deg inclination): PHASE 1 PHASE 2 3m @ 5.03 g/t (from 0m) 1m @ 17.27 g/t (from 22m) 5m @ 4.83 g/t (from 14m) 1m @ 29.10 g/t (from 8m) 5m @ 4.38 g/t (from 130m) 2m @ 2.95 g/t (from 40m

  15. Slide 15: Early Stage Exploration

    EARLY STAGE EXPLORATION Initial drilling program has identified a strike length of approximately 1.5 kms within a 5m - 30m wide mineralised and altered shear zone, extending at least 500m down dip at approximately 35˚ Multiple shallow significant intersections encountered in the mineralised and alte

  16. Slide 16: Geological Overview of the Gbane Project

    GEOLOGICAL OVERVIEW OF THE GBANE PROJECT with

  17. Slide 17: Excellent Exploration Address

    EXCELLENT EXPLORATION ADDRESS

  18. Slide 18: Gbane Project Geological Map

    [HRM cranitoias Gbane Project Geological Map LeceND

  19. Slide 19: Gbane Drilling Summary

    GBANE DRILLING SUMMARY Hole ID Length (meters) Grade (Au ppm) GDD001 12 2.4 GDD001 10 2.9 GDD010 6 6.85 GDD010 5 6.16 GRC017 6 1.42 GDD032 5 2.89 GDD002 3 2.33 GRC017 4 2.57 GDD012 5 1.78 GDD011 1 29.1 GDD025 1 17.27 GDD009 4 2.3 GRC055 4 2.3 Plus over 30 intersection of 1m > 1/gt gold

  20. Slide 20: Gbane Mineralisation

    GBANE MINERALISATION Gold occurs in quartz carbonate veins hosted in highly altered and sheared meta-volcanics Controlling shears zone are not simple tabular sheets These have a concentrated footprint but contain significant amounts of metal Style of mineralisation analogous to Namdini

  21. Slide 21: Gbane Mineralisation

    GBANE MINERALISATION GDD032. Part of intersection 68 – 73m (5 metres) at 2.89g/t Au. Shows intense alteration and quartz veining in sheared meta-volcanics

  22. Slide 22: Gbane Mineralisation

    GBANE MINERALISATION A A B B 3-D view looking NNW of Gold grade isosurface at 0.3 g/t Au

  23. Slide 23: Gbane Economic Potential

    GBANE ECONOMIC POTENTIAL The mineralisation at Gbane is most likely formed of shallow plunging shoots Shoots may have strike lengths of 200 to 300 meters (or more) but relatively narrow widths (perhaps only 40 to 50 meters However a single shoot has the potential to contain significant gold

  24. Slide 24: Gbane Economic Potential

    GBANE ECONOMIC POTENTIAL Numerous shoots associated with fold hinges probably occur within the area It is certain that the adjacent Shaanxi Mine is exploiting such shoots Only approximately 10% of area explored to date Exploration priority is to identify the major fold noses that may contain bigger

  25. Slide 25: Legend

    LEGEND Granitoids Meta volcanics and sediments Dioritic intrusives. Faults - thrusts

  26. Slide 26: Gbane Exploration Program 2018

    GBANE EXPORATION PROGRAM 2018 Cover lease with ground or airborne geophysics (magnetics and radiometrics) on a 50m line spacing, to help with structural mapping of folds Shallow RAB drilling over structural areas of interest across the lease to identify new target areas Continued diamond drilling in

  27. Slide 27: Integral Piece of Regional Puzzle

    INTEGRAL PIECE OF REGIONAL PUZZLE

  28. Slide 28: Upper-East Region, Ghana

    “UPPER-EAST REGION, GHANA. wary, Pudo CASSIUS: Pa Mahima Ti waist & Nakpandun Sokogu Nalengu Bunkpur Bongbini Yunyuo) iNagbo) Guabuliga Kankwa s rangbinsi Gbinsi me en - MINERALISED SHEAR ZONE

  29. Slide 29: Investment Opportunity

    INVESTMENT OPPORTUNITY

  30. Slide 30: Corporate Snapshot

    CORPORATE SNAPSHOT Low Market Cap Tight Share Register No Debt Over $3.5M in bank

  31. Slide 31: Leveraged for Exploration Upside

    LEVERAGED FOR EXPLORATION UPSIDE

  32. Slide 32: Cardinal Resources share price

    CARDINAL RESOURCES © Begin Ghana Exploration Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~ YR2 YR3 YR4 YRS YR6 YR7 7 YRS

  33. Slide 33: Price ($)

    YR1 YR2 YR6 YR7 Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~~ 7 YRS

  34. Slide 34: YRS

    YR1 YR2 YRS YR6 YR7 Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~~ 7 YRS

  35. Slide 35: YRS

    YR1 YR2 YR3 YR4 YRS YR7 Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~~ 7 YRS

  36. Slide 36: YRS

    YR1 YR2 YR3 YR4 YRS YR7 Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~~ 7 YRS

  37. Slide 37: YRS

    YR1 YR2 YR3 YR4 YRS Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~~ 7 YRS

  38. Slide 38: Cardinal and Cassius

    CARDINAL || CASSIUS RESOURCES MINING LIMITED Price ($) 0.70 0.60 0.50 CA) Begin Ghana Exploration rr) 0.30 0.20 0.10 “001 R YR2 YR3 YR4 YR5 YR6 YR7 A B C »—eé i» 7YRS 3 YRS

  39. Slide 39: Cassius Mining Limited

    YR1 CASSIUS MINING LIMITED YR3 YR4 YRS YR6 YR7 F Price ($) 0.70 0.60 0.50 0.40 0.30

  40. Slide 40: Cardinal and Cassius

    CARDINAL CASSIUS RESOURCES MINING LIMITED Price ($) 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.01 ~~ A B C D E F 7 YRS AL (2 © 3 YRS

  41. Slide 41: Cardinal and Cassius

    MINING LIMITED CARDINAL || CASSIUS Price ($) 0.70 0.60 0.50 le 0.40 0.30 0.20 0.10 0.01 ~~ A B C D E F 7 YRS © (2 BI °C] 3 YRS

  42. Slide 42: Cardinal and Cassius: Exploration Expansion

    CARDINAL || CASSIUS RESOURCES MINING LIMITED Price ($) 0.70 0.60 0.50 ® Exploration Expansi rr) 0.30 0.20 0.10 0.01 ~ A B C »—eé i» 7YRS A F ee C D 3 YRS

  43. Slide 43: Cardinal and Cassius: Market Cap $26M

    CARDINAL CASSIUS RESOURCES MINING LIMITED Price ($) 0.70 0.60 0.50 @e Market Cap $26M oe 0.30 0.20 0.10 “O01 A _—€ Di © i» 7YRS A F ee C D E 3 YRS

  44. Slide 44: The Foundation Has Been Laid

    RESOURCES MINING LIMITED || CARDINAL CASSIUS HAS BEEN LAID.. tA a—C )—O6—_G

  45. Slide 45: Contact

    james@cassiusmining.com anthony@cassiusmining.com

  46. Slide 46: Slide 46

Cassius Mining — Investor Presentation (November 2017) on 6ix