Cassius Mining Ltd · ASX:CMD

Cassius Mining — Investor Presentation (May 2018)

22 slides from Cassius Mining's investor presentation, May 9, 2018

  1. Slide 1: Breaking New Ground in a Prolific Gold Rich Region

    For personal use only ASX : CMD BREAKING NEW GROUND IN A PROLIFIC GOLD RICH REGION MAY 2018, INVESTOR PRESENTATION

  2. Slide 2: Introduction to Cassius Mining Limited

    Introduction to Cassius Mining Limited GBANE IS A NEW DISCOVERY IN A PROLIFIC NEW GOLD BELT For personal use only ▪ Breaking new ground in the underexplored Birimian Nangodi Greenstone Belt of the Upper East Region of Northern Ghana also favoured by Gold Fields and Cardinal ▪ Sits directly adjacent

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Capital Structure (7 May 2018) Shareholder Breakdown (7 May2018) For personal use only Ordinary Shares on Issue 261.2m Unlisted Options 21.7m Board & Management 16.8% Current Share Price $0.065 Market Capitalisation $17.0m Cash $2.2m Top 40 Shareholders 73.0% Debt Nil Board Key Se

  4. Slide 4: Achievements to Date & Outlook for 2018-19

    Achievements to Date & Outlook for 2018-19 COMPLETED PROPOSED For personal use only PROSPECTING LICENSE Issued28 GBANE PROJECT PHASE 1 DRILL PHASE 2 DRILL AER0 MAG SURVEY AERO MAG SURVEY PHASE 4 DRILL MINING December 2016 INTEREST PROGRAM PROGRAM Completed high resolution Process results and PROGRAM

  5. Slide 5: At the Heart of a Multi-Million Ounce Region

    Gbane Project – At the Heart of a Multi-Million Ounce Region GBANE PROJECT OVERVIEW For personal use only ▪ Wholly owned Gbane Project Licence Area covers 13.79 km2 within the Upper East Region, Northern Ghana (1) ▪ Gbane sits in the highly prospective Birimian Nangodi Greenstone Belt and is relativ

  6. Slide 6: Mineralisation Style

    Gbane Project – Mineralisation Style GBANE IS ANALOGOUS TO BOTH THE NEIGHBOURING For personal use only SHAANXI GOLD MINE AND CARDINAL GOLD RESOURCE ▪ In SRK’s opinion, Phase 1 & 2 drilling identified mineralisation is analogous in alteration style, veining and intensity of shearing to the adjacent o

  7. Slide 7: Exploration To Date

    Gbane Project – Exploration To Date EXPLORATION PROGRAMS CARRIED OUT SINCE EARLY 2017 For personal use only ▪ Until recently, systematic exploration has been carried out by Cassius’ in-country and technical team across the central part of the Gbane Project Licence Area only (effectively 20% of the t

  8. Slide 8: Next Phase of Exploration

    Gbane Project – Next Phase of Exploration HIGH RESOLUTION AERO-MAG & RADIOMETRIC SURVEY COMPLETED For personal use only ▪ A high resolution aerial magnetic and radiometric survey was conducted in April 2018 across the entire Gbane Project Licence Area for the first time using the world’s only 3-axis

  9. Slide 9: Next Phase of Exploration (cont'd)

    Gbane Project – Next Phase of Exploration (cont’d) PROPOSED 2018-19 EXPLORATION WORK PROGRAM For personal use only ▪ Revision of ground mapping to include the results of the aerial magnetic data to aid geological interpretation ▪ Highly targeted diamond drilling on the higher grade more continuous v

  10. Slide 10: Soalara Project – Highly Sought-after Limestone Project

    Soalara Project – Highly Sought-after Limestone Project SOALARA PROJECT OVERVIEW For personal use only ▪ Soalara Limestone Project is a 100%-owned asset, located on the South Western coast of Madagascar – Two contiguous permits that cover an area of 18.75 km2, granted for exploitation of limestone o

  11. Slide 11: Cassius Mining – Proposed 2018-19 Milestones

    Cassius Mining – Proposed 2018-19 Milestones PRIORITY TO RANK, DRILL AND EVALUATE TARGETS … CONVERT PROSPECTING LICENSE TO MINING LICENSE For personal use only … DELINEATE AN INAUGURAL RESOURCE Aerial magnetic and radiometric survey Results of aerial magnetic and radiometric survey generates structu

  12. Slide 12: Appendix

    For personal use only APPENDIX ASX: CMD 12

  13. Slide 13: Experienced Board & Strong In-Country Team

    Experienced Board & Strong In-Country Team Corporate In-Country For personal use only JAMES ARKOUDIS DAVID CHIDLOW CEO PROJECT TECHNICAL DIRECTOR James has been working in the gold mining sector in Ghana for Over 35 years experience in the resources sector, adds valuable the past 4½ years. Previousl

  14. Slide 14: Mineralisation Style

    Gbane Project – Mineralisation Style PHASE 1 & 2 MINERALISATION IS ANALOGOUS TO THE For personal use only ADJACENT HIGH-GRADE SHAANXI GOLD MINE ▪ Gold mineralisation is associated with a series of discontinuous quartz-carbonate veins hosted in a series of low angle (30-40o) mylonitic and highly alte

  15. Slide 15: Exploration To Date

    Gbane Project – Exploration To Date PHASE 1 & 2 DRILL PROGRAMS For personal use only ▪ Phase 1 and 2 programs were carried out in mid-2017 and concentrated on the central part of the Gbane Project Licence Area adjacent to the operating gold mine with approximately 200 x 150 metre spacing – 8,637 met

  16. Slide 16: Exploration To Date (cont'd)

    Gbane Project – Exploration To Date (cont’d) PHASE 1 & 2 DRILL PROGRAMS For personal use only ▪ To date, 26 mineralised and altered shear-vein zones have been identified with excellent geological continuity confirmed along strike length 3D View of Identified Stacked Mineralisation Shear Zones Gold G

  17. Slide 17: Exploration To Date (cont'd) – Significant Phase 1 and 2 Drill Results

    Gbane Project – Exploration To Date (cont’d) as announced previously on the ASX SIGNIFICANT PHASE 1 DRILL RESULTS SIGNIFICANT PHASE 2 DRILL RESULTS For personal use only Vertical Vertical Interval Length Grade Interval Length Grade Hole Number Depth (m) Hole Number Depth (m) (m down hole) (m) (g/t)

  18. Slide 18: Exploration To Date – Phase 3 Drill Program

    Gbane Project – Exploration To Date (cont’d) PHASE 3 DRILL PROGRAM ▪ Phase 3 drilling (2,421 metres, 11 holes) was conducted in late 2017, approximately 700m south-east of For personal use only Phases 1 and 2, and was designed to intersect mineralisation, geology and structure in intrusive diorites

  19. Slide 19: Exploration To Date (cont'd) – Significant Phase 3 Drill Results

    Gbane Project – Exploration To Date (cont’d) as announced previously on the ASX SIGNIFICANT PHASE 3 HIGH GRADE DRILL RESULTS SIGNIFICANT PHASE 3 LOW GRADE DRILL RESULTS Interval Length Grade Vertical Hole Interval Length Grade Vertical For personal use only Hole Number (m downhole) (m) (g/t) Depth (

  20. Slide 20: Artisanal Workings

    Gbane Project – Artisanal Workings ARTISANAL WORKINGS INDICATIVE OF For personal use only EXTENSIVE MINERALISATION ▪ Extensive artisanal workings occur around the village of Tarkwa and adjacent to the operating Shaanxi gold mine, following the main Nangodi trend for at least 3 kms in a NNW-SSE direc

  21. Slide 21: Disclaimer

    DISCLAIMER For personal use only The purpose of this presentation is to provide general information about Cassius Mining Limited (the “Company”). Unless otherwise stated herein, the information in this presentation is based on the Company’s own information and estimates may also contain information

  22. Slide 22: Contact Us

    ASX: CMD For personal use only CONTACT US: CEO Managing Director James Arkoudis Anthony Karam T. +61 2 9321 7943 T. +61 2 9321 7941 E. james@cassiusmining.com E. anthony@cassiusmining.com Director / Company Secretary Wayne Kernaghan T. +61 2 8226 3323 E. wayne@cassiusmining.com AUSTRALIAN OFFICE GHA

Cassius Mining — Investor Presentation (May 2018) on 6ix