Slide 1: Tabba Tabba 'White Gold' – Australia's Next Large-Scale Lithium Project
For personal use only TABBA TABBA ‘WHITE GOLD’ Australia’s Next Large-Scale Lithium Project From discovery to development ASXWC8 Colorado Springs USA
Slide 2: Rapidly Advancing the Tabba Tabba Lithium Project
DEVELOPMENT DEAL HISTORY For personal use only 3 of 4 Sons of Gwalia projects are now the RAPIDLY ADVANCING world’s largest hard-rock spodumene THE TABBA TABBA LITHIUM PROJECT mines. GREENBUSHES Similar LCT Talison pegmatites Tabba Tabba Mineralised WODGINA pegmatite outcrops MinRes & Albemarle 50:5
Slide 3: Corporate Snapshot
CORPORATE SNAPSHOT For personal use only S H ARES WC8 1,607M ASX CODE SHARES ON ISSUE TABBA TABBA ~A$482M A$77.1M Lithium MARKET CAP AT 30c PROFORMA CASH BALANCE post raise (25 Sep 2026) 74.1MT @ 1.0% Li2O ~9% owned by Management RES EARCH COVERAGE MT ADRAH $0.80 Gold $1.00 770,000 oz @ 1.1g/t Au $1
Slide 4: Overview: Investor Snapshot
OVERVIEW INVESTOR SNAPSHOT STRATEGIC | ACCESSIBLE | WELL-SERVICED For personal use only MINING LEASE CLOSE TO PORT (80km) Previously mined for tantalum LOW-COST PRODUCER (PFS) (C1 US$541, AISC US$658) LARGE, HIGH CONFIDENCE MAIDEN RESOURCE (94% Indicated and open at depth) 100% OFFTAKE UNENCUMBERED
Slide 5: Tabba Tabba – Thick Continuous Pegmatites
EXPLORATION TABBA TABBA – THICK CONTINUOUS PEGMATITES only Luke and Leia in PFS RESOURCE use 74.1Mt (> 0.45% Li2O c.o.g.) personal 90 Mt (> 0.3% Li2O c.o.g.) PFS Recovery > 74% Surface For 54.4m @1.2% Li2O from 267.9m 180.0m @1.1% Li2O from 206.0m 39.0m @ 1.3% Li2O from 28.0m CHEWY LEIA LUKE (TADD03
Slide 6: Bolt Cutter Discovery – Second Growth Engine
EXPLORATION BOLT CUTTER DISCOVERY SECOND GROWTH ENGINE For personal use only BOLT CUTTER DIS COVERY – 1 0 KM F ROM TABBA TABBA Bolt Cutter Discovery - 10km from Tabba Tabba Organic Growth from soils, mapping, geophysics and drilling Current Footprint 2.3km x 0.8km Only 10km apart Stacked Pegmatite s
Slide 7: Track Record of Delivery
DEVELOPMENT TRACK RECORD OF DELIVERY For personal use only R A P I D LY A DVA N C I N G T H E TA B BA TA B BA PROJECT L I T H I U M P ROJ ECT EXECUTION MAJOR DISCOVERY – Leia (Sep 2023) DISCOVERY – Luke (Apr 2024) TABBA TABBA - MAIDEN RESOURCE – (Nov 2024) DISCOVERY – Bolt Cutter (Aug 2025) PFS STUD
Slide 8: Compelling PFS Economics
PFS FINANCIAL COMPELLING PFS ECONOMICS For personal use only A CYCLE RES ILIEN T PROJECT WITH STRON G MARGIN S US$1,384/t 1 ~A$ 1.2bn ~A$ 3.2bn IRR 23% Post-tax NPV8 Post-tax FCF Post-tax IRR US$2,000/t 2 ~A$ 2.9bn ~A$ 6.5bn IRR 40% Post-tax NPV8 Post-tax FCF Post-tax IRR CATEGORY UNIT FLOOR PFS LON
Slide 9: Australian Spodumene Producers' Nameplate Capacity
DEVELOPMENT AUSTRALIAN S PODUMEN E PRODUCERS ' N AMEPL ATE CAPACITY (Mtpa) For personal use only Source: Company announcements and public disclosures of peer companies, 1. Pilgangoora reflects combined nameplate capacity across the Pilgan Plant (~4.7 Mtpa) and Ngungaju Plant (~0.2 Mtpa). latest avai
Slide 10: Australian Spodumene Producers FOB Operating Cost
FINANCIAL AUSTRALIAN S PODUMEN E PRODUCERS FO B O P ERATIN G CO ST (US $ /t ) For personal use only Source: Company announcements and public disclosures of peer companies, latest available technical reports and # Former GAM Resources Project quarterly reports as at 31 Mar 2026. Tabba Tabba productio
Slide 11: Global Lithium Supply and Demand Outlook
MARKET GLOBAL LITH IUM S UPPLY AN D DEMAN D OUTLOOK 1 (Mt LCE) For personal use only Tabba Tabba targets production ahead of the forecast market tightening EVs and BESS drive the growth Demand outpaces supply Lithium demand by end use, Mt LCE 6 Demand ~5.5Mt 6.0 TABBA TABBA ~2.1 Mt 4.0 4 implied gap
Slide 12: Disciplined, Flexible Funding Strategy
FINANCIAL DISCIPLINED, FLEXIBLE FUNDING STRATEGY For personal use only FUNDING OPTIONS Our approach is to optimise the funding mix to reduce dilution, preserve project upside, and accelerate development. ASX WC8 Wildcat Resources Limited 12
Slide 13: Plan for CY 2026
PLAN PLAN FOR CY 2026 For personal use only DISCOVERY DEVELOPMENT Regional Exploration DFS Bolt Cutter Resource Offtake & Financing Drill Testing New Targets Approvals Brownfields Road Construction M&A People ASX ASX WC8 WC8 Diggers and Dealers Wildcat Resources Limited 13 ASX WC8 Wildcat Reso
Slide 14: Summary: Key Value Drivers
SUMMARY KEY VALUE DRIVERS For personal use only RIGHT LOCATION RIGHT ASSETS RIGHT TEAM o Tier-1 Pilbara, 80km from port o Tabba Tabba - Impressive size, o Track record of value creation o Camp and haul road in place scale and quality o Proven discovery and o Commanding land position o Bolt Cutter –
Slide 15: Thank You
For personal use only THANK YOU From discovery to development Presented by AJ Saverimutto info@wildcatresources.com.au www.wildcatresources.com.au ASXWC8
Slide 16: Disclaimer
DISCLAIMER For personal use only This presentation has been prepared by Wildcat Resources Ltd (WC8 or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be comple
Slide 17: Annexure: Tabba Tabba JORC MRE and Ore Reserve
ANNEXURE For personal use only Table 1 – Tabba Tabba JORC (2012) MRE as at 28 November 2024 (using 0.45% Li2O cut-off). Tonnes Li2O Ta2O5 Fe2O3 Li2O Ta2O5 Category (Mt) (%) (ppm) (%) (T) (lb) Indicated 70.0 1.01 53 0.64 709,100 9,948,600 Inferred 4.1 0.76 65 0.88 31,100 724,700 Total 74.1 1.00 54 0.