Wildcat Resources Ltd. · ASX:WC8

Wildcat Resources — Rottnest Institutional Conference 2026

35 slides from Wildcat Resources's conference presentation, Mar 17, 2026

  1. Slide 1: Timing Is Everything

    For personal use only TIMING IS EVERYTHING ROTTNEST INSTITUTIONAL CONFERENCE Growing a multi-generational lithium pipeline ASXWC8 MARCH 2026

  2. Slide 2: Corporate Snapshot

    CORPORATE SNAPSHOT S H ARES WC8 1,339M ASX CODE SHARES ON ISSUE TABBA TABBA $560M $48.5M For personal use only Lithium MARKET CAP AT 42c CASH AT BANK 74.1MT @ 1.0% Li2O (31 Dec 2025) ~18% owned by Management RES EARCH COVERAGE MT ADRAH Gold $1.20 770,000 oz @ 1.1g/t Au $0.61 $1.10 $0.65 $0.75 ASX 

  3. Slide 3: Board of Directors & Management

    BOARD OF DIRECTORS & MANAGEMENT JEFF FIONA SAMUEL MATTHEW ELLIOTT VAN MAANEN EKINS BANKS NON-EXECUTIVE CHAIRMAN NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR EXECUTIVE DIRECTOR o +30 yrs exploration, mining and o 30 yrs of experience in accounting, o Geologist with 20+ yrs of o Joint founder of Wild

  4. Slide 4: Summary: Advanced and Development Ready

    SUMMARY INVESTOR SNAPSHOT ADVANCED AND DEVELOPMENT READY STATEGIC LOCATION 80KM FROM PORT CLOSE TO PORT (80km) / MINING LEASE (Previously mined for tantalum) LOW-COST OPERATION 50km For personal use only US$ 541/t (lowest quartile C1 cost) LARGE, HIGH CONFIDENCE MAIDEN RESOURCE (94% Indicated) 100%

  5. Slide 5: Tabba Tabba Key Drilling Highlights

    EXPLORATION TABBA TABBA KEY DRILLING HIGHLIGHTS For personal use only 54.4m @1.2% Li2O from 267.9m 180.0m @1.1% Li2O from 206.0m 39.0m @ 1.3% Li2O from 28.0m LEIA CHEWY LUKE (TADD030) (est. true width) (TARC148) (est. true width) (TARC150) (est. true width) 50.0m @1.1% Li2O from 178.0m 119.2m @1.0%

  6. Slide 6: Bolt Cutter Second Growth Engine

    EXPLORATION BOLT CUTTER SECOND GROWTH ENGINE 20.0m @1.7% Li2O from 43.0m BOLT CUTTER (BCRC002) (12.0m est. true width) 12.8m @2.0% Li2O from 45.3m (BCDD001) (est. true width) 12.0m @1.7% Li2O from 90.0m (BCRC034) (est. true width) 13.0m @1.4% Li2O from 90.0m For personal use only (BCRC003) (est. tru

  7. Slide 7: Wildcat Progress and Delivery

    DEVELOPMENT WILDCAT PROGRESS AND DELIVERY BOLT CUTTER RESOURCE DISCOVERY - For personal use only EXECUTION BOLT CUTTER MAIDEN RESOURCE 74Mt @ 1.0% FUNDING 94% INDICATED Jul 25 DFS STUDY DISCOVERY - LUKE Aug 25 MAJOR NATIVE TITLE AGREEMENT DISCOVERY - LEIA Nov 24 PFS STUDY Apr 24 - 3 discoveries in 3

  8. Slide 8: Significant Tonnes per Vertical Metre

    SIGNIFICANT TONNES PER VERTICAL METRE PFS DEVELOPMENT – SUPPORTS LARGE SCALE OPEN PIT MINING Resource per 20m bench Surface High tonnes Tonnes Li2O per vertical metre (Mt) (%) Indicated 70.0 1.01 For personal use only Inferred 4.1 0.76 94% indicated Total 74.1 1.00 ~90Mt Tonnes above cut-off grade o

  9. Slide 9: Compelling PFS Economics

    PFS FINANCIAL COMPELLING PFS ECONOMICS A CYCLE RES ILIEN T PROJECT WITH STRON G MARGIN S US$ 1,384 ~A$ 1.2bn ~A$ 3.2bn IRR 23% Post-tax NPV8 Post-tax FCF Post-tax IRR For personal use only US$ 2,000 ~A$ 2.9bn ~A$ 6.5bn IRR 40% Post-tax NPV8 Post-tax FCF Post-tax IRR CURRENT SPOT CATEGORY UNIT FLOOR

  10. Slide 10: Tabba Tabba DFS and Beyond – Value Upside Opportunities

    DEVELOPMENT TABBA TABBA DFS AND BEYOND – VALUE UPSIDE OPPORTUNITIES DFS ❑ Adjoining Tenement acquisition • Reduced haulage distance – Reduced Opex ❑ Plant and Mine design optimisation For personal use only • Optimise mining scenario to maximise profitability • Additional Chewy and potentially Han, H

  11. Slide 11: Production Timing Meets Demand

    MARKET PRODUCTION TIMING MEETS DEMAND GLOBAL DEMAND AND SUPPLY (Mt LCE) Planned Development Pathway DEMAND DRIVERS EV growth For personal use only Grid-scale battery storage AI / data center energy demand Source: Benchmark Mineral Intelligence Lithium Fostering to 2040; SRP Global: Supply Demand GNP

  12. Slide 12: Disciplined, Flexible Funding Strategy

    FINANCIAL DISCIPLINED, FLEXIBLE FUNDING STRATEGY STRATEGIC DEBT INVESTOR (PROJECT LEVEL) FUNDING For personal use only GOVERNMENT OPTIONS FUNDS OFFTAKE PREPAY DIRECT EQUITY INVESTMENT Our approach is to optimise the funding mix to minimise dilution, preserve project upside, and accelerate developmen

  13. Slide 13: Plan for the Year: Exploration and Studies

    DELIVER PLAN FOR CY 26 EXPLORATION ✓ Continue discovery drilling at Bolt Cutter – unlock system ✓ First pass field work on new targets ✓ Drill testing high ranked targets For personal use only ✓ Potential to acquire new tenements STUDIES ✓ Maiden Resource on Bolt Cutter ✓ DFS Tabba Tabba ✓ Progress

  14. Slide 14: Summary: Key Value Drivers

    SUMMARY KEY VALUE DRIVERS RIGHT LOCATION RIGHT ASSETS RIGHT TEAM o Tier-1 Pilbara, 80km from port o Tabba Tabba - Impressive size, o Track record of value creation For personal use only o Camp and haul road in place scale and quality o Proven discovery and o Commanding land position o Bolt Cutter –

  15. Slide 15: Thank You

    For personal use only THANK YOU. ROTTNEST INSTITUTIONAL CONFERENCE Presented by AJ Saverimutto info@wildcatresources.com.au www.wildcatresources.com.au ASXWC8 MARCH 2026

  16. Slide 16: Tabba Tabba Exploration Strategy

    EXPLORATION TABBA TABBA EXPLORATION STRATEGY BUILDING A 50-YEAR PIPELINE Resource Development Reserve Tabba Tabba PENDING Tabba Tabba Resource LIVE Mt Adrah - Au For personal use only Bolt Cutter Central Testing Move all Drill Target 5 Target 92 Hagrid up or out Targets are Li unless Exploration Def

  17. Slide 17: Tabba Tabba PFS Overview

    PFS TABBA TABBA PFS OVERVIEW G LO B A L R E S O U R C E 74.1Mt @ 1.0% Li2O (0.45 Li2O Cut Off) PREFEASIBILITY KEY METRIC UNIT 94% Indicated Mineral Resource STUDY • Leia Resource – 46.8Mt @ 1.05 Li2O Spodumene Product Type • Luke Resource – 16.2 @ 0.91 Li2O Concentrate Chewy, Han and Hutt (~10.7Mt),

  18. Slide 18: Project Plant Layout

    PFS PROJECT PLANT - LAYOUT Admin Security / Gatehouse Concentrate Stockpile Flotation Milling For personal use only Crushed Ore Stockpile Crushing / Screening Power Station Thickeners Primary Crusher ASX  WC8 Investor Presentation March 2026 Wildcat Resources Limited 18

  19. Slide 19: Approvals

    DEVELOPMENT APPROVALS Tabba Tabba fits within WA EP ACT Government’s Critical Minerals • Targeting Part IV – Assessment on Referral Information (ARI) Strategy, which provides streamlined • Part V approvals to be completed in parallel approvals process and Government support (Green Energy Major Proje

  20. Slide 20: Mineral Resource

    GEOLOGY MINERAL RESOURCE Tonnes Li2O Ta2O5 Fe2O3 Li2O Ta2O5 Category (Mt) (%) (ppm) (%) (T) (lb) Indicated 70.0 1.01 53 0.64 709,100 9,948,600 For personal use only Inferred 4.1 0.76 65 0.88 31,100 724,700 Total 74.1 1.00 54 0.65 740,200 10,673,300 Li2O Ta2O5 Fe2O3 Li2O Ta2O5 Ta2O5 Category MRE Doma

  21. Slide 21: Open Pit Mining

    DEVELOPMENT OPEN PIT MINING MINE DESIGN PARAMETERS Spodumene Ore Pit stage Tonnes Li2O Li2O Grade Ta2O5 grade Fe2O3 Grade CUT OFF GRADE (Mt) (kt) (%) (ppm) (%) 1 2.6 25.1 0.96 78.8 1.55 • Open Pit – 0.30% Li2O • Underground – 0.70% Li2O 2 10.7 102.9 0.96 69.3 1.08 For personal use only 3 8.5 85.3 1.

  22. Slide 22: Underground Mining

    DEVELOPMENT UNDERGROUND MINING UNDERGROUND MINE DESIGN S TO P O P T I M I S AT I O N PRODUCTION SCHEDULE • Cut off Grade – 0.70% Li2O • Identified three mining areas for Luke (South, • Underground production schedule aims to • Underground design considers separate Upper Central and North) and two fo

  23. Slide 23: Mining – Open Pit and Underground Combined

    DEVELOPMENT MINING – OPEN PIT AND UNDERGROUND COMBINED Year Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL TMM Pit Stage 1 Mt 12.1 19.5 6.0 - - - - - - - - - - - - 37.6 TMM Pit Stage 2 Mt 1.4 14.7 21.5 31.0 5.8 2.6 2.3 3.8 0.7 - - - - - - 83.8 TMM Pit Stage 3 Mt - 0.1 10.3 6.6 19.1 16.8 3.5 9.7 6.5

  24. Slide 24: Mining – Open Pit and Underground Combined Continued

    DEVELOPMENT MINING – OPEN PIT AND UNDERGROUND COMBINED CONTINUED For personal use only ASX  WC8 Investor Presentation March 2026 Wildcat Resources Limited 24

  25. Slide 25: Ore Reserve

    PFS ORE RESERVE • The JORC Code (2012) Tabba Tabba Probable Ore Reserve is 46.3Mt at 1.0% Li2O.Note: Ore Reserves at 1/7/2025. COG applied: • In addition to the open pit Ore Reserve the pits contain a small volume of inferred mineralisation that does not report to the ORE. The inferred material cons

  26. Slide 26: Process Plant – Crushing and Milling

    DEVELOPMENT PROCESS PLANT – CRUSHING AND MILLING CRUSHING GRINDING Three-stage crushing: • Single Stage Ball Mill • Primary crusher – Jaw • Grind size of P80 180µm Can we add a • Secondary crusher – Cone being targeted diagram here as we • Tertiary crusher – Cone • Grinding Circuit capable of have d

  27. Slide 27: Process Plant – Flotation and Thickening

    DEVELOPMENT PROCESS PLANT – FLOTATION AND THICKENING F LOTAT I O N THICKENING Two trains at 2.2Mtpa for • Thickening capable of 4.5Mpta (Stage 1 and 2) supporting both stage 1 and Three stages of flotation: stage 2 from commencement • Rougher; For personal use only • Separate thickening of the • Cle

  28. Slide 28: Metallurgy

    DEVELOPMENT METALLURGY Parameter Scoping Master Composite PFS Master Composite P R O C E S S I N G M E T H O D O LO G I E S T E S T E D Head Grade (Li2O) 1.42 1.01 • DMS / HLS Grind Size (µm) 150 180 • DMS / HLS and flotation Deslime Loss (%) 10.2 7.2 • Flotation Magnetic Rejects (%) N/A 0.55 Roughe

  29. Slide 29: Tailings Storage Facility (TSF)

    DEVELOPMENT TAILINGS STORAGE FACILITY (TSF) T S F PA R A M E T E R S TA I L I N G S G E O C H E M I S T R Y • Total tailings production: 74.1 Mt; • Life of Mine (LoM): 18 years; • Minimum total freeboard of 0.5 m. • Annual tailings production: ~3.85 Mtpa (dry tonnes); • The tailings solids sample wa

  30. Slide 30: Tailings Storage Facility (TSF) Continued

    DEVELOPMENT TAILINGS STORAGE FACILITY (TSF) CONTINUED T S F PA R A M E T E R S The tailings are classified as non-plastic silty silt/clay, with a particle Consolidation and Settlement Behaviour: density of 2.6 t/m³. • Undrained oedometer testing produced a settled dry density of Particle Size Distri

  31. Slide 31: Roads

    DEVELOPMENT ROADS SITE ACCESS ROAD New site access road to be established between Marble Bar Road and the Mine • Located on high ground to provide all weather access • Designed for quad road trains / super triples For personal use only Marble Bar and Site Access Road Intersection: • Main Roads appro

  32. Slide 32: Mine Services Areas

    DEVELOPMENT MINE SERVICES AREAS OPEN PIT & UNDERGROUND Area to support mining operation Key infrastructure: • Fuel bay (light and heavy vehicles) • Workshops For personal use only • Offices and ablutions • Washdown bay ASX  WC8 Investor Presentation March 2026 Wildcat Resources Limited 32

  33. Slide 33: Utilities

    DEVELOPMENT UTILITIES POWER • Build Own Operate (BOO) power plant planned • Combination of battery, solar and gas turbine • Wind turbines considered but not included due to cost and site requirements For personal use only W AT E R Groundwater: • Sourced from the open pit and underground • Three bore

  34. Slide 34: Camp

    DEVELOPMENT CAMP E A R LY W O R K S C A M P The existing 80-person camp will support the early works program including: • Bulk earthworks • Establishment of the permanent 600-person camp For personal use only • Once the permanent camp is established, the existing camp will be surplus PERMANENT CAMP

  35. Slide 35: Disclaimer

    DISCLAIMER This presentation has been prepared by Wildcat Resources Ltd (WC8 or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentation

Wildcat Resources — Rottnest Institutional Conference 2026 on 6ix