Wildcat Resources Ltd. · ASX:WC8

Wildcat Resources — Mining Forum Americas 2026

17 slides from Wildcat Resources's conference presentation, 2026

  1. Slide 1: Tabba Tabba 'White Gold' – Australia's Next Large-Scale Lithium Project

    TABBA TABBA ‘WHITE GOLD’ Australia’s Next Large-Scale Lithium Project From discovery to development ASXWC8 Colorado Springs USA

  2. Slide 2: Deal History – Rapidly Advancing the Tabba Tabba Lithium Project

    DEVELOPMENT DEAL HISTORY 3 of 4 Sons of Gwalia projects are now the RAPIDLY ADVANCING world’s largest hard-rock spodumene THE TABBA TABBA LITHIUM PROJECT mines. GREENBUSHES Similar LCT Talison pegmatites Tabba Tabba Mineralised WODGINA pegmatite outcrops MinRes & Albemarle 50:50 JV High-grade PILGAN

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT S H ARES WC8 1,607M ASX CODE SHARES ON ISSUE TABBA TABBA ~A$482M A$77.1M Lithium MARKET CAP AT 30c PROFORMA CASH BALANCE post raise (25 Sep 2026) 74.1MT @ 1.0% Li2O ~9% owned by Management RES EARCH COVERAGE MT ADRAH $0.80 Gold $1.00 770,000 oz @ 1.1g/t Au $1.00 $1.30 $1.21 $0.90

  4. Slide 4: Investor Snapshot

    OVERVIEW INVESTOR SNAPSHOT STRATEGIC | ACCESSIBLE | WELL-SERVICED MINING LEASE CLOSE TO PORT (80km) Previously mined for tantalum LOW-COST PRODUCER (PFS) (C1 US$541, AISC US$658) LARGE, HIGH CONFIDENCE MAIDEN RESOURCE (94% Indicated and open at depth) 100% OFFTAKE UNENCUMBERED Part of funding soluti

  5. Slide 5: Tabba Tabba – Thick Continuous Pegmatites

    EXPLORATION TABBA TABBA – THICK CONTINUOUS PEGMATITES Luke and Leia in PFS RESOURCE 74.1Mt (> 0.45% Li2O c.o.g.) 90 Mt (> 0.3% Li2O c.o.g.) PFS Recovery > 74% Surface 54.4m @1.2% Li2O from 267.9m 180.0m @1.1% Li2O from 206.0m 39.0m @ 1.3% Li2O from 28.0m CHEWY LEIA LUKE (TADD030) (est. true width) (

  6. Slide 6: Bolt Cutter Discovery

    EXPLORATION BOLT CUTTER DISCOVERY SECOND GROWTH ENGINE BOLT CUTTER DIS COVERY – 1 0 KM F ROM TABBA TABBA Bolt Cutter Discovery - 10km from Tabba Tabba Organic Growth from soils, mapping, geophysics and drilling Current Footprint 2.3km x 0.8km Only 10km apart Stacked Pegmatite swarm open in multiple

  7. Slide 7: Track Record of Delivery

    DEVELOPMENT TRACK RECORD OF DELIVERY R A P I D LY A DVA N C I N G T H E TA B BA TA B BA PROJECT L I T H I U M P ROJ ECT EXECUTION MAJOR DISCOVERY – Leia (Sep 2023) DISCOVERY – Luke (Apr 2024) TABBA TABBA - MAIDEN RESOURCE – (Nov 2024) DISCOVERY – Bolt Cutter (Aug 2025) PFS STUDY ANNOUNCED – (Jul 202

  8. Slide 8: Compelling PFS Economics

    PFS FINANCIAL COMPELLING PFS ECONOMICS A CYCLE RES ILIEN T PROJECT WITH STRON G MARGIN S US$1,384/t 1 ~A$ 1.2bn ~A$ 3.2bn IRR 23% Post-tax NPV8 Post-tax FCF Post-tax IRR US$2,000/t 2 ~A$ 2.9bn ~A$ 6.5bn IRR 40% Post-tax NPV8 Post-tax FCF Post-tax IRR CATEGORY UNIT FLOOR PFS LONG-TERM PRICE 3 Month A

  9. Slide 9: Australian Spodumene Producers' Nameplate Capacity

    DEVELOPMENT AUSTRALIAN S PODUMEN E PRODUCERS ' N AMEPL ATE CAPACITY (Mtpa) Source: Company announcements and public disclosures of peer companies, 1. Pilgangoora reflects combined nameplate capacity across the Pilgan Plant (~4.7 Mtpa) and Ngungaju Plant (~0.2 Mtpa). latest available technical report

  10. Slide 10: Australian Spodumene Producers FOB Operating Cost

    FINANCIAL AUSTRALIAN S PODUMEN E PRODUCERS FO B O P ERATIN G CO ST (US $ /t ) Source: Company announcements and public disclosures of peer companies, latest available technical reports and # Former GAM Resources Project quarterly reports as at 31 Mar 2026. Tabba Tabba production data sourced from PF

  11. Slide 11: Global Lithium Supply and Demand Outlook

    MARKET GLOBAL LITH IUM S UPPLY AN D DEMAN D OUTLOOK 1 (Mt LCE) Tabba Tabba targets production ahead of the forecast market tightening EVs and BESS drive the growth Demand outpaces supply Lithium demand by end use, Mt LCE 6 Demand ~5.5Mt 6.0 TABBA TABBA ~2.1 Mt 4.0 4 implied gap by 2040 Target first

  12. Slide 12: Disciplined, Flexible Funding Strategy

    FINANCIAL DISCIPLINED, FLEXIBLE FUNDING STRATEGY FUNDING OPTIONS Our approach is to optimise the funding mix to reduce dilution, preserve project upside, and accelerate development. ASX  WC8 Wildcat Resources Limited 12

  13. Slide 13: Plan for CY 2026

    PLAN PLAN FOR CY 2026 DISCOVERY DEVELOPMENT Regional Exploration DFS Bolt Cutter Resource Offtake & Financing Drill Testing New Targets Approvals Brownfields Road Construction M&A People ASX ASX   WC8 WC8 Diggers and Dealers Wildcat Resources Limited 13 ASX  WC8 Wildcat Resources Limited 13

  14. Slide 14: Key Value Drivers

    SUMMARY KEY VALUE DRIVERS RIGHT LOCATION RIGHT ASSETS RIGHT TEAM o Tier-1 Pilbara, 80km from port o Tabba Tabba - Impressive size, o Track record of value creation o Camp and haul road in place scale and quality o Proven discovery and o Commanding land position o Bolt Cutter – emerging discovery dev

  15. Slide 15: Thank You

    THANK YOU From discovery to development Presented by AJ Saverimutto info@wildcatresources.com.au www.wildcatresources.com.au ASXWC8

  16. Slide 16: Disclaimer

    DISCLAIMER This presentation has been prepared by Wildcat Resources Ltd (WC8 or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentation

  17. Slide 17: Annexure

    ANNEXURE Table 1 – Tabba Tabba JORC (2012) MRE as at 28 November 2024 (using 0.45% Li2O cut-off). Tonnes Li2O Ta2O5 Fe2O3 Li2O Ta2O5 Category (Mt) (%) (ppm) (%) (T) (lb) Indicated 70.0 1.01 53 0.64 709,100 9,948,600 Inferred 4.1 0.76 65 0.88 31,100 724,700 Total 74.1 1.00 54 0.65 740,200 10,673,300

Wildcat Resources — Mining Forum Americas 2026 on 6ix