Golden Dawn Minerals Inc

Golden Dawn Minerals — Investor Presentation (June 2011)

33 slides from Golden Dawn Minerals's investor presentation, June 2011

  1. Slide 1: Golden Dawn Minerals, Inc.

    Slide 1: Golden Dawn Minerals, Inc.

    Golden Dawn Minerals, Inc. Greenwood & Royal Attwood Projects Contemporary Drilling & Historic Drilling Greenwood, British Columbia, Canada June 2011 TSXV : GOM Frankfurt : 3G8

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    GOLDEN DAWN MINERALS Forward Looking Statements Except for historical information contained herein, this presentation may contain forward‐looking statements including, but not limited to, comments regarding predictions and projections. Forward‐looking statements address future events and conditions

  3. Slide 3: Golden Dawn Team

    Slide 3: Golden Dawn Team

    Golden Dawn Team Wolf Wiese; Chief Executive Officer & Director Jayram Hosanee; Chief Financial Officer, Director Hans Schwable; S h bl Director Frank Wright, P.Eng; Director Stewart Jackson, Ph.D., P.Geo; Advisory Board Michael Dufresne,, M.Sc.,, P.Geo;; Chieff Geologist g

  4. Slide 4: Golden Dawn Claims

    Slide 4: Golden Dawn Claims

    Golden Dawn Claims Greenwood Project (Wild Rose, Tam O’ Shanter, & Boundary Falls Claims) & Royal Attwood Project GREENWOOD & ROYAL ATTWOOD PROJECTS 0.2 M oz Au 3 Motherlode 1.0 M oz Au Tam 0’ Shanter Claims Greenwood GREENWOOD PROJECT Wild Rose To Claims Osoyoos Boundary Falls Claims ROYAL Grand Fo

  5. Slide 5: Golden Dawn Claims: Greenwood & Royal Attwood Projects

    Slide 5: Golden Dawn Claims: Greenwood & Royal Attwood Projects

    Golden Dawn Claims Greenwood & Royal y Attwood Projects j South‐Central British Columbia, Canada INACTIVE Au Mine/Prospect p Tam O’ Shanter Claims CLAIMS ACTIVE CLAIMS N WILD ROSE- DEADWOOD DRILLING Wild Rose Claims BENGAL Boundary Falls Claims WILD ROSE MAY MAC MAY-MAC 2,000 SOIL SAMPLES; Royal Att

  6. Slide 6: Greenwood Project Plan View: Historical & Recent Drilling

    Slide 6: Greenwood Project Plan View: Historical & Recent Drilling

    Golden Dawn Claims G Greenwood dPProject j t Plan View ‐ Historical & Recent Drilling 0 100 METERS Deadwood Area Drilling AU MINE Historical & Recent Wild Rose Area Drilling WILD ROSE AU MINE Drilling GOLD INTERCEPTS 0.10 to 0.25 0.25 to 0.50 0.50 to 1.00 1.00 to 2.00 2.00 to 5.00 5.00 to 10.00 >10.

  7. Slide 7: Greenwood Project Long Section: Historic & Recent Drilling

    Slide 7: Greenwood Project Long Section: Historic & Recent Drilling

    Golden Dawn Claims Greenwood Project Long Section ‐ Historic & Recent Drilling 0 100 METERS Line of Section WILD ROSE AU MINE DEADWOOD AREA WILD ROSE AREA GOLD INTERCEPTS 0.10 to 0.25 0.25 to 0.50 0.50 to 1.00 1.00 to 2.00 2.00 to 5.00 5.00 to 10.00 >10.00 g/t Au g/t Au g/t Au g/t Au g/t Au g/t Au g

  8. Slide 8

    Slide 8

  9. Slide 9: Boundary Falls Claims Block Model Lodes Plan View

    Slide 9: Boundary Falls Claims Block Model Lodes Plan View

    Greenwood Project Boundary Falls Claims Block Model ‐Lodes Plan View

  10. Slide 10: Deadwood Gold Zone Initial Inferred Mineral Resource Estimate

    Slide 10: Deadwood Gold Zone Initial Inferred Mineral Resource Estimate

    Golden Dawn Claims Greenwood Project Deadwood Gold Zone within the Tam O’Shanter – Wild Rose Properties Initial Inferred Mineral Lower Cut Off Au Mtonnes (t) Au Grade Troy Oz Resource Estimate 0.1 g/t Au 38,809,000 0.33 g/t 406,600 0.2 34,176,000 0.35 382,400 *Inferred Inferred Mineral Resources are

  11. Slide 11: Wild Rose & Tam O'Shanter Area Historic Best Intercepts

    Slide 11: Wild Rose & Tam O'Shanter Area Historic Best Intercepts

    Greenwood Project Wild Rose & Tam O’Shanter Area Historic Best Thick‐Interval & Vein Intercepts Intercepts into Wild Rose Vein System DH 92‐31 1.03m 21.30 g/t Au DDH 86‐5 1.8m 10.23 g/t Au 14.57 ppm Ag DH 86‐12 1.7m 8.37 g/ g/t Au 6.82 pp ppm Agg DH 87‐4 2.16m 8.50 g/t Au 4.65 ppm Ag DH 87‐3 2.5m 7.

  12. Slide 12: Deadwood & Wild Rose 2010-2011 Best Vein Intercepts

    Slide 12: Deadwood & Wild Rose 2010-2011 Best Vein Intercepts

    Greenwood Project Deadwood & Wild Rose Area 2010‐2011 Best Vein Intercepts Intercepts into Wild Rose & Wild Cat Veins DH 10WR01 2.55m 1.47 g/t Au 0.62% Cu DH 10WR02 1.70m 9.57 g/t Au 0.21% Cu DH 10WR03 2.74m 0.21 g/t Au 0.04% Cu DH 10WR04 5.10m 1.61 g/t Au 3.11ppm Ag 0.09% Cu DH 10WR05 5.00m 0.79 g/

  13. Slide 13: Deadwood & Wild Rose Thick-Interval Intercepts

    Slide 13: Deadwood & Wild Rose Thick-Interval Intercepts

    Greenwood Project Deadwood & Wild Rose Area 2010‐2011 Best Vein Intercepts Thick‐Interval Intercepts DH 92‐27 63.00m 0.95 g/t Au DH 91‐16 26.15m 0.754 g/t Au 10WR01 30.65m 0.19 g/t Au 0.06% Cu 10 02 10WR02 21 3 21.73m 0 1 g/t 0.17 / Au 0 01% Cu 0.01% C 10WR03 18.75m 0.08 g/t Au 0.08ppm Ag 0.01% Cu 1

  14. Slide 14: Bulk-Tonnage Geological Exploration Target

    Slide 14: Bulk-Tonnage Geological Exploration Target

    Greenwood Project Wild Rose & Tam O'Shanter Claims Bulk‐Tonnage Geological Exploration Target Potential Target is 3 million+ ounces

  15. Slide 15: Potential Target Types

    Slide 15: Potential Target Types

    Greenwood Project j Potential Target Types Multiple gold‐copper target types from previous work & current geophysical surveys. Bulk tonnage gold‐copper systems of Overlook‐type & South Penn in Republic District. Higher‐grade sulphide‐rich gold‐silver base metals in Rossland‐type veins. Gold & copper

  16. Slide 16: Greenwood Project Highlights

    Slide 16: Greenwood Project Highlights

    Greenwood Project j Highlights g g ™ $20 million historical database: +100 drillholes, geophysical & geochemical surveys reports, surveys, reports etc. etc ™ Planned mine bulk sample – potential early production. ™ On‐site 130 tpd p ggravityy & flotation mill & tailings g ppond on Boundaryy Falls pr

  17. Slide 17: Current Exploration Targets

    Slide 17: Current Exploration Targets

    Greenwood Project C Current EExploration l i TTargets ™ Deadwood Zone ‐ Potential for open‐ended low‐grade gold zone 2,000 meters l long X 50 to 80 meters wide id X 200 meters deep. d ™ Wild Rose Vein System ‐ High‐grade High grade vein‐type vein type massive sulphides 750 & 2,000 2 000 meters long.

  18. Slide 18: Surveys & Drilling Completed

    Slide 18: Surveys & Drilling Completed

    Greenwood Project S Surveys & Drilling D illi Completed C l t d AIRBORNE & GROUND GEOPHYSICS: ™ Total Magnetic Intensity (TMI). ™ Vertical Magnetic Component Derivative (ZOFF2). ™ Electro‐Magnetics (EM). ™ Induced Polarization (IP). OTHER SURFACE EXPLORATION: ™ 2 Geochemical Surveys – 2,000 X 2,500

  19. Slide 19: Summary of Geophysics & Geochemistry

    Slide 19: Summary of Geophysics & Geochemistry

    Greenwood Project S Summary off G Geophysics h i &G Geochemistry h it ™ Magnetic anomalies may reflect magnetite bearing intrusives bordered by gold skarns. k ™ EM Conductors are numerous & un‐tested. un tested May correspond to massive sulfides sulfides. ™ Soil Geochemistry on Wild Rose & Tom O’ O

  20. Slide 20: Boundary Falls Mine & Mill Site

    Slide 20: Boundary Falls Mine & Mill Site

    Greenwood Project Boundary Falls Mine & Mill Site MINE DUMP MILL

  21. Slide 21: Boundary Falls Claims Electro-Magnetic, Magnetic & Soil Anomalies

    Slide 21: Boundary Falls Claims Electro-Magnetic, Magnetic & Soil Anomalies

    Greenwood Project Boundary Falls Claims Electro‐Magnetic, Magnetic, & Soil Anomalies BOUNDARY FALLS CLAIMS

  22. Slide 22: Current 2011 Soil Sampling Grid Area

    Slide 22: Current 2011 Soil Sampling Grid Area

    Greenwood Project Wild Rose & Boundary Falls Areas Current 2011 Soil Sampling Grid Area Tam O’Shanter Wild Rose WILD ROSE MAY-MAC Boundary y Falls Royal Attwood

  23. Slide 23: May-Mac Property Long Section

    Slide 23: May-Mac Property Long Section

    May‐Mac Property L Long Section S ti Potential Target is 100 million tonnes at 3‐5 g/t Au, 10‐20 oz Ag, 3% Cu, Pb, Zn

  24. Slide 24: Boundary Falls Claims Block Model Lodes Plan View

    Slide 24: Boundary Falls Claims Block Model Lodes Plan View

    Greenwood Project Boundary Falls Claims Block Model ‐Lodes Plan View

  25. Slide 25: View of the Robert Mill and tailings pond

    Slide 25: View of the Robert Mill and tailings pond

    View of the Robert Mill and tailings pond, taken from edge of # 6 Adit dump.

  26. Slide 26: Royal Attwood Project 2011 Titan Survey

    Slide 26: Royal Attwood Project 2011 Titan Survey

    Golden Dawn Claims Royal Attwood Project 2011 Titan 24 Survey (14.4 line‐km) TITAN 24 SURVEY LINES 0 2.4 Kilometers Royal Attwood Claims

  27. Slide 27: Royal Attwood Project 2011 Titan Survey (14.4 line-km)

    Slide 27: Royal Attwood Project 2011 Titan Survey (14.4 line-km)

    Golden Dawn Claims Royal Attwood Project 2011 Titan 24 Survey (14.4 line‐km) QUANTEC TITAN 24 SURVEY IS DEEP‐PROBING SYSYEM MEASURING: ™ Resistivity (DC) ™ Chargeability (IP) ™ Magneto‐telluric Resistivity (MT) 14.4 LINE‐KM SURVEY YIELDED: ™ 26 Moderate‐ M d to High‐priority Hi h i i Anomalies A li

  28. Slide 28: Aerial View of Titan 24 Survey Lines

    Slide 28: Aerial View of Titan 24 Survey Lines

    Golden Dawn Claims Royal Attwood Project 2011 Titan 24 Survey (14.4 line‐km) 0 ~1.0 N Kilometers AERIAL VIEW OF TITAN 24 SURVEY LINES

  29. Slide 29: Royal Attwood Project Stream Sediment & Soil Geochemistry

    Slide 29: Royal Attwood Project Stream Sediment & Soil Geochemistry

    Royal y Attwood Project j Stream Sediment & Soil Geochemistry ANOMALOUS GOLD IN STREAM & SOIL Royal +10,000 ppb Au in Stream Sed. Attwood +200 ppb Au Property in soil +50 ppb Au in soil 4,000 soil & stream samples 79,000 ppb Au N Soil Survey Limits 11,000 ppb Au 0 1100 METERS 17,000 ppb Au

  30. Slide 30: Royal Attwood Project Geophysical & Soil Grid Gold Anomalies

    Slide 30: Royal Attwood Project Geophysical & Soil Grid Gold Anomalies

    Royal Attwood Project Geophysical & Soil Grid Gold Anomalies GOLD in SOIL • <25-0 ppb Au • 5-25 ppb Au 30-50 ppb Au TITAN 24 SURVEY 55-100 ppb Au 105 200 ppb 105-200 b Au A 205-1160 ppb Au Echo Bay Stream Sediment Anomaly TEM MAG ANOMALY N 1,116 nT 0 1280 Royal EM CONDUCTOR METERS Attwood TDEM 0 nT

  31. Slide 31: Greenwood & Attwood Project Budgets

    Slide 31: Greenwood & Attwood Project Budgets

    Greenwood & Attwood Project Budgets Wild Rose/Tam O’ O Shanter, Boundary Falls, & Royal Attwood Claims WILD ROSE-TAM O’ SHANTER G Geophysical h i l&G Geochemical h i lG Ground dWWork k $ 150 150,000 000 Drilling - 5,000 Meters $1,250,000 TOTAL$1,400,000 BOUNDARY FALLS Geophysical & Geochemical Groun

  32. Slide 32: Share Structure & Financials

    Slide 32: Share Structure & Financials

    Golden Dawn Minerals, Inc. Sh Share St Structure t & Fi Financials i l CAPITAL STRUCTURE & FINANCIALS ISSUED SHARES: 92.2 Million (92,229,940) OUTSTANDING WARRANTS: 40.5 Million @ avg. price of $0.15 (yields $6.2 Million) OUTSTANDING OPTIONS: 7 3 Million 7.3 FULLY DILUTED SHARES: 140 Million (yields

  33. Slide 33: Cautionary Note

    Slide 33: Cautionary Note

    Golden Dawn Minerals, Inc. CAUTIONARY NOTE Historical drilling results are being confirmed by current drilling and such historical results cannot be relied upon until rere‐confirmed. confirmed There are no known mineral resources on the properties, and there can be no assurance that any mineral reso

Source: Internet Archive copy of wp.goldendawnminerals.com

More decks from Golden Dawn Minerals Inc