Golden Dawn Minerals Inc

Golden Dawn Minerals — Investor Presentation (November 2011)

34 slides from Golden Dawn Minerals's investor presentation, November 2011

  1. Slide 1: Golden Dawn Minerals, Greenwood & Royal Attwood Projects

    Slide 1: Golden Dawn Minerals, Greenwood & Royal Attwood Projects

    Golden Dawn Minerals, Inc. Greenwood & Royal Attwood Projects 2011 Exploration Greenwood, British Columbia, Canada November 2011 TSXV : GOM Frankfurt : 3G8

  2. Slide 2: Forward Looking Statements & Cautionary Statements

    Slide 2: Forward Looking Statements & Cautionary Statements

    GOLDEN DAWN MINERALS Forward Looking Statements & Cautionary Statements Except for historical information contained herein, this presentation may contain forward-looking statements including, but not limited to, comments regarding predictions and projections. Forward-looking statements address futur

  3. Slide 3: Share Structure & Financials

    Slide 3: Share Structure & Financials

    Golden Dawn Minerals, Inc. Share Structure & Financials CAPITAL STRUCTURE & FINANCIALS ISSUED SHARES: 100.1 Million (142 million fully diluted) OUTSTANDING WARRANTS: 35.7 Million @$0.14 avg. (yields $5.1 Million) OUTSTANDING OPTIONS: 6.3 Million SHAREHOLDERS: +1,000 (approx.) DIRECTORS/MANAGEMENT OW

  4. Slide 4: Golden Dawn Claims

    Slide 4: Golden Dawn Claims

    Golden Dawn Claims Greenwood Project (Wild Rose, Tam O’ Shanter, & Boundary Falls Claims) & Royal Attwood Project GREENWOOD & ROYAL ATTWOOD PROJECTS 0.2 M oz Au 3 Motherlode 1.0 M oz Au Tam 0’ Shanter Claims Greenwood GREENWOOD PROJECT Wild Rose To Claims Osoyoos Boundary Falls Claims ROYAL Grand Fo

  5. Slide 5: Golden Dawn Properties

    Slide 5: Golden Dawn Properties

    Golden Dawn Properties Greenwood & Royal Attwood Projects South-Central British Columbia, Canada INACTIVE Au Mine/Prospect Tam O’ Shanter Claims CLAIMS ACTIVE CLAIMS N WILD ROSE- DEADWOOD DRILLING Wild Rose Claims DEADWOOD Boundary Falls Claims WILD ROSE MAY-MAC 2,000 SOIL SAMPLES; Royal Attwood Cla

  6. Slide 6: Greenwood Project: Deadwood Gold Zone Exploration Target

    Slide 6: Greenwood Project: Deadwood Gold Zone Exploration Target

    Greenwood Project Wild Rose & Tam O'Shanter Claims – Deadwood Gold Zone Low Grade Bulk-Tonnage Conceptual Geological Exploration Target Conceptual Target is 1 to 3 million ounces of Gold at 0.5 to 0.75 g/t Gold

  7. Slide 7: Deadwood Gold Zone Initial Inferred Mineral Resource Estimate

    Slide 7: Deadwood Gold Zone Initial Inferred Mineral Resource Estimate

    Greenwood Project Deadwood Gold Zone within the Tam O’Shanter – Wild Rose Properties Initial Inferred* Mineral Lower Cut Off Au Metric Au Grade Troy Oz (grams/tonne) Tonnes** Resource Estimate 1.2 98,200 1.85 5,800 *Inferred Mineral Resources are not 1.1 135,800 1.66 7,200 Mineral Reserves. Inferred

  8. Slide 8: Best Historic & 2010-2011 Vein Intercepts

    Slide 8: Best Historic & 2010-2011 Vein Intercepts

    Greenwood Project Wild Rose & Tam O’Shanter Area Best Historic & 2010 – 2011 Vein Intercepts Intercepts into Wild Rose – Wild Cat Vein System Interval Gold Silver Copper DH 92-31 1.03m 21.30 g/t Au DDH 86-5 1.8m 10.23 g/t Au 14.57 ppm Ag DH 86-12 1.7m 8.37 g/t Au 6.82 ppm Ag DH 87-4 2.16m 8.50 g/t A

  9. Slide 9: Historic & 2010-2011 Best Low Grade Bulk Tonnage Intercepts

    Slide 9: Historic & 2010-2011 Best Low Grade Bulk Tonnage Intercepts

    Greenwood Project Deadwood & Wild Rose Area Historic & 2010-2011 Best Low Grade Bulk Tonnage-type Intercepts Thick-Interval Intercepts Interval Gold Silver Copper DH 92-27 63.00m 0.95 g/t Au DH 91-16 26.15m 0.754 g/t Au 10WR01 30.65m 0.19 g/t Au 0.06% Cu 10WR02 21.73m 0.17 g/t Au 0.01% Cu 10WR03 18.

  10. Slide 10: Target Comparison: Large Low Grade Bulk Tonnage Projects

    Slide 10: Target Comparison: Large Low Grade Bulk Tonnage Projects

    Greenwood Project Target Comparison Large Low Grade Bulk Tonnage Projects Kinross Fort Knox Mine* *Mineral Reserve and Resource Summary from Kinross www.kinross.com 42 Km north of Fairbanks Alaska Open Pit Mining with Traditional CIP Mill, some heap leaching 2010 Production 350,000 oz Au 2010 Co

  11. Slide 11: Leet / Livengood Mineral Resource

    Slide 11: Leet / Livengood Mineral Resource

    Leet Resource covers 2.5 km? of 145 km? land package Mineralization occurs from surface to 300 metre depth as disseminated gold and gold in veinlets hosted in sedimentary and volcanic rocks Infill drilling has converted +90% of mineralization from Inferred and Indicated to the Measured Resource Cate

  12. Slide 12: Capex Requirement Comparison

    Slide 12: Capex Requirement Comparison

    Mining $271.4 Processing Plant $499.8 Mining Cost $3.87 Infrastructure and Tailing Management $203.9 Mill Processing Cost $6.81 Other (Owner’s Cost, EPCM, Indirect costs etc.) $315.9 G&A Cost (transport included) $0.81 Contingency $323.0 Reclamation $0.08 Total Initial CAPEX $1,614 Gold Refining $0.

  13. Slide 13: Potential Target Types

    Slide 13: Potential Target Types

    Greenwood Project Potential Target Types 1. Multiple gold-copper target types from previous work & current geophysical surveys. 2. Bulk tonnage gold-copper systems of Overlook, South Penn & Golden Eagle types in Republic District. 3. Higher-grade sulphide-rich gold-silver base metals in Rossland-typ

  14. Slide 14: Greenwood Project Highlights

    Slide 14: Greenwood Project Highlights

    Greenwood Project Highlights 1. $20 million historical database: +100 drillholes, geophysical & geochemical surveys, reports, etc. 2. Planned mine bulk sample – potential early production. 3. On-site 130 tpd gravity & flotation mill & tailings pond on Boundary Falls property. 4. No. 7 Adit of May-Ma

  15. Slide 15: Current Exploration Targets

    Slide 15: Current Exploration Targets

    Greenwood Project Current Exploration Targets 1. Deadwood Zone - Potential for open-ended low-grade gold zone 2,000 meters long X 50 to 80 meters wide X 300 meters deep. 2. Wild Rose Vein System - High-grade high sulphide quartz carbonate vein-type – with series of en echelon veins. 3. May-Mac Gold-

  16. Slide 16: Surveys & Drilling Completed Over the Last Months

    Slide 16: Surveys & Drilling Completed Over the Last Months

    Greenwood Project Surveys & Drilling Completed Over the Last 12 Months AIRBORNE & GROUND GEOPHYSICS:  AeroTEM III Total Magnetic Intensity (TMI).  AeroTEM III Electro-Magnetics (ZOFF or ZOFF2).  Titan 24 Deep IP and Magnetotellurics – Royal Attwood January, 2011  Standard Induced Polarization (I

  17. Slide 17: Summary of Geophysics & Geochemistry

    Slide 17: Summary of Geophysics & Geochemistry

    Greenwood Project Summary of Geophysics & Geochemistry  Magnetic anomalies may reflect magnetite bearing intrusives bordered by gold skarns.  EM Conductors are numerous & un-tested. May represent high sulfide veins or skarns, or massive sulfide zones.  IP chargeability anomalies numerous & un-tes

  18. Slide 18: The Secret to Revitalizing the Historic Greenwood Region

    Slide 18: The Secret to Revitalizing the Historic Greenwood Region

    The Secret to Revitalizing the Historic Greenwood Region • Consolidated land position • Successful NEW TECHNOLOGY • Airborne TDEM Geophysics • Commitment to expenditure and systematic exploration Lay of the Land - Covered Historic Phoenix Cu-Au Mine (produced 1+million oz Au, 6 million oz Ag 520 mil

  19. Slide 19: Greenwood Region & Technology

    Slide 19: Greenwood Region & Technology

    Greenwood Region & Technology TDEM = Time Domain Electromagnetics (EM) It has led to the discovery of more 1.5 million oz Au in projects APEX has been involved with in the last 6 years

  20. Slide 20: Golden Dawn Claims

    Slide 20: Golden Dawn Claims

    Golden Dawn Claims Greenwood & Royal Attwood Projects South-Central British Columbia, Canada INACTIVE Tam O’ Shanter Claims CLAIMS Au Mine/Prospect ACTIVE CLAIMS N WILD ROSE- DEADWOOD DRILLING Wild Rose Claims DEADWOOD Boundary Falls Claims WILD ROSE 2,000 SOIL SAMPLES; MAY-MAC Royal Attwood Claims

  21. Slide 21: Boundary Falls Mine & Mill Site

    Slide 21: Boundary Falls Mine & Mill Site

    Greenwood Project Boundary Falls Mine & Mill Site MINE DUMP MILL

  22. Slide 22: View of the Robert Mill and tailings pond

    Slide 22: View of the Robert Mill and tailings pond

    View of the Robert Mill and tailings pond, taken from edge of # 6 Adit dump.

  23. Slide 23: May-Mac Property Long Section

    Slide 23: May-Mac Property Long Section

    May-Mac Property Long Section Potential Target is 100,00 tonnes at 3-5 g/t Au, 10-20 oz Ag, 3% Cu, Pb, Zn

  24. Slide 24: Boundary Falls Project: Maymac Mine Underground

    Slide 24: Boundary Falls Project: Maymac Mine Underground

    Boundary Falls Project Maymac Mine Underground Potential for early stage revenue No. 7 Level Portal No. 7 Level Main Vein in Back – Roughly 1 m across

  25. Slide 25: Boundary Falls Claims Electro-Magnetic, Magnetic & Soil Anomalies

    Slide 25: Boundary Falls Claims Electro-Magnetic, Magnetic & Soil Anomalies

    Greenwood Project Boundary Falls Claims Electro-Magnetic, Magnetic, & Soil Anomalies BOUNDARY FALLS CLAIMS

  26. Slide 26: Widespread Gold in Soils: Wild Rose Boundary Area

    Slide 26: Widespread Gold in Soils: Wild Rose Boundary Area

    WIDESPREAD GOLD IN SOILS: WILD ROSE BOUNDARY AREA Deadwood Zone MayMac

  27. Slide 27: New IP Targets Boundary Falls Area

    Slide 27: New IP Targets Boundary Falls Area

    NEW IP TARGETS BOUNDARY FALLS AREA MayMac

  28. Slide 28: Golden Dawn Claims

    Slide 28: Golden Dawn Claims

    Golden Dawn Claims Greenwood & Royal Attwood Projects South-Central British Columbia, Canada INACTIVE Tam O’ Shanter Claims CLAIMS Au Mine/Prospect ACTIVE CLAIMS N WILD ROSE- DEADWOOD DRILLING Wild Rose Claims DEADWOOD Boundary Falls Claims WILD ROSE 2,000 SOIL SAMPLES; MAY-MAC Royal Attwood Claims

  29. Slide 29: Royal Attwood Project: 2011 Titan Survey

    Slide 29: Royal Attwood Project: 2011 Titan Survey

    Royal Attwood Project Royal Attwood Project 2011 Titan 24 Survey (14.4 line-km) TITAN 24 SURVEY LINES 0 2.4 Kilometers Royal Attwood Claims

  30. Slide 30: Royal Attwood Project: 2011 Titan Survey Results

    Slide 30: Royal Attwood Project: 2011 Titan Survey Results

    Royal Attwood Project 2011 Titan 24 Survey (14.4 line-km) QUANTEC TITAN 24 SURVEY IS DEEP-PROBING SYSYEM MEASURING:  Resistivity (DC)  Chargeability (IP)  Magneto-telluric Resistivity (MT) 14.4 LINE-KM SURVEY YIELDED:  26 Moderate- to High-priority Anomalies worthy of follow-up geophysics, geoch

  31. Slide 31: Aerial View of Titan 24 Survey Lines

    Slide 31: Aerial View of Titan 24 Survey Lines

    Golden Dawn Claims Royal Attwood Project 2011 Titan 24 Survey (14.4 line-km) 0 ~1.0 N Kilometers AERIAL VIEW OF TITAN 24 SURVEY LINES

  32. Slide 32: Quantec Geoscience Titan 24 Data Inversion Sections

    Slide 32: Quantec Geoscience Titan 24 Data Inversion Sections

    QUANTEC GEOSCIENCE TITAN 24 DATA – INVERSION SECTIONS ROYAL ATTWOOD AREA 500 m

  33. Slide 33: Golden Dawn Team

    Slide 33: Golden Dawn Team

    Golden Dawn Team Wolf Wiese; Chief Executive Officer & Director Ernesto Higueras; President & Director Jayram Hosanee; Chief Financial Officer & Director Hans Schwable; Director Frank Wright, P.Eng; Director Stewart Jackson, Ph.D., P.Geo; Advisory Board Michael Dufresne, M.Sc., P.Geo; Consultant &Ch

  34. Slide 34: Greenwood & Attwood Project Budgets

    Slide 34: Greenwood & Attwood Project Budgets

    Greenwood & Attwood Project Budgets Wild Rose/Tam O’ Shanter, Boundary Falls, & Royal Attwood Claims (April 2012) WILD ROSE-TAM O’ SHANTER Geophysical & Geochemical Ground Work $ 150,000 - Completed Drilling - 5,000 Meters $1,250,000 TOTAL $1,400,000 BOUNDARY FALLS Geophysical & Geochemical Ground W

Source: Internet Archive copy of wp.goldendawnminerals.com

More decks from Golden Dawn Minerals Inc