Golden Dawn Minerals Inc

Golden Dawn Minerals — Investor Presentation (November 2012)

29 slides from Golden Dawn Minerals's investor presentation, November 2012

  1. Slide 1: Corporate Presentation

    Slide 1: Corporate Presentation

    Corporate Presentation November 2012 1

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements Except for historical information contained herein, this presentation may contain forward‐looking statements including, but not limited to, comments regarding predictions and projections. Forward‐ looking statements address future events and conditions and therefore involv

  3. Slide 3: Corporate Overview

    Slide 3: Corporate Overview

    Corporate Overview  Production oriented, junior resource exploration company  Gold & Silver production slated to begin within 12‐18 months at two historic mines: May Mac Mine & Wild Rose Mine  Golden Dawn’s Flagship Property: Greenwood Precious Metals Project  Golden Dawn is committed to the sys

  4. Slide 4: Golden Dawn Claims

    Slide 4: Golden Dawn Claims

    Golden Dawn Claims GREENWOOD & ROYAL ATTWOOD PROJECTS 0.2 M oz Au 3 Motherlode 1.0 M oz Au Greenwood GREENWOOD PROJECT WILD ROSE & To MAY MAC MINE Osoyoos Grand Forks 3 Midway CANADA USA N +1.6 M oz Au 0 15 km 4

  5. Slide 5: Golden Dawn Claims

    Slide 5: Golden Dawn Claims

    Golden Dawn Claims  May Mac Mine – high‐grade silver‐gold deposit (surface & Deadwood Resource underground sampling, (279,000 oz Au) ground geophysics & drilling) Wild Rose Mine  Wild Rose Mine – high‐grade gold‐copper sulphide quartz May Mac Mine carbonate vein  Deadwood Zone – potential open‐en

  6. Slide 6: Golden Dawn Claims

    Slide 6: Golden Dawn Claims

    Golden Dawn Claims Deadwood Gold Zone Resource (279,000 oz Au) Wild Rose Veins Wild Rose Mine Greenwood May Mac Mine 500m 6

  7. Slide 7: Deadwood Gold Zone 2011 Resource

    Slide 7: Deadwood Gold Zone 2011 Resource

    Deadwood Gold Zone 2011 Resource Deadwood Gold Zone Resource (279,000 oz Au) Wild Rose Veins Wild Rose Mine 7

  8. Slide 8: Deadwood Gold Zone 2011 Resource

    Slide 8: Deadwood Gold Zone 2011 Resource

    Deadwood Gold Zone 2011 Resource Near Surface Gold‐Silver Resource 300m Wild Rose Mine Deadwood Gold Zone Resource Wild Rose Veins (279,000 oz Au) Gold Veins Open at Depth 700m 8

  9. Slide 9: Deadwood Gold Zone 2011 Resource

    Slide 9: Deadwood Gold Zone 2011 Resource

    Deadwood Gold Zone 2011 Resource Drilling after resource calculation shows gold mineralization open at depth Proposed Drill Program to Further Test Depth of Gold Veins and Expand Resource Silver Zone *DH 11‐19 2.5m @ 13.0 g/t Ag *DH 11‐24 47m @ 0.5 g/t Au *DH 11‐19 31.5m @ 72.6 g/t Ag Incl 12.0m @ 1

  10. Slide 10: Deadwood Gold Zone

    Slide 10: Deadwood Gold Zone

    Deadwood Gold Zone Initial Inferred* Mineral Resource Estimate  Deadwood Zone is located within the Tam O’Shanter & Wild Rose claims  Inferred 43‐101 compliant Mineral Resource Estimate of 279,300 oz. Au at 0.3 g/t cut off  Deadwood Zone has a strike length of 2,000+ meters and depth of 300 meter

  11. Slide 11: Deadwood Zone Drilling

    Slide 11: Deadwood Zone Drilling

    Deadwood Zone Drilling Historic & 2010‐2011 Low Grade Bulk Tonnage Intercepts The 2010‐2011 drill program and the results of previous drilling have outlined a remarkably consistent zone of widespread, low‐grade Au‐Cu mineralization that is a potential open‐ pitable bulk tonnage Au target. 11

  12. Slide 12: Deadwood Zone Summary

    Slide 12: Deadwood Zone Summary

    Deadwood Zone Summary  Deadwood Zone’s bulk‐tonnage deposit, established by a 5,400 meter drill program (completed in December, 2011)  Inferred resource of 20M tons that contains 279,300 oz. Au at a cutoff of 0.3 g/t  Drilling after 2011 resource calculation intercepts gold veins at depth and wil

  13. Slide 13: Wild Rose Mine

    Slide 13: Wild Rose Mine

    Wild Rose Mine Deadwood Gold Zone Resource (279,000 oz Au) Wild Cat Veins Wild Rose Mine 350m 13

  14. Slide 14: Wild Rose Mine: Adits & Veins

    Slide 14: Wild Rose Mine: Adits & Veins

    Wild Rose Mine: Adits & Veins 10,000 tonne bulk sample planned from Wild Rose Mine Wild Rose Drill Highlights width DH (m) g/t Au g/t Ag % Cu 92‐41 0.6 3.05 0.7 25.70 incl 0.3 58.46 92‐42 3.4 1.68 3.0 0.92 87‐5 1.8 0.37 87‐9 0.5 15.86 6.53 0.28 91‐1 0.3 2.03 87‐3 2.3 7.93 12.10 0.38 87‐2 0.2 2.10 86

  15. Slide 15: Wild Rose Mine

    Slide 15: Wild Rose Mine

    Wild Rose Mine  Wild Rose Mine will begin production shortly after the May Mac Mine  Located 2 km north of the historic May Mac Mine  Golden Dawn is preparing to rehabilitate the Wild Rose adit and conduct targeted underground drilling  Underground adit in place and exposed veins identified  10

  16. Slide 16: May Mac Mine

    Slide 16: May Mac Mine

    May Mac Mine Deadwood Gold Zone 279,300 oz Au Resource Wild Rose Minto

  17. Slide 17: May Mac Mine

    Slide 17: May Mac Mine

    May Mac Mine  May Mac Mine slated to begin production in the next 12 months  Small scale historic production at the May Mac Mine exceeds 3,400 tons at an average grade of 5.16 g/t Au, 236 g/t Ag, 1.5% Pb & 1% Zn  Inactive since the 1980s, the property includes 2 principal veins and at least 10 ot

  18. Slide 18: Mill & Tailings Pond

    Slide 18: Mill & Tailings Pond

    Mill & Tailings Pond  On‐site 130 ton‐per‐day flotation mill & tailings pond owned by Golden Dawn  Will be used to process ore from the May Mac & Wild Rose Mines  Mill & Tailings Pond require a rehabilitation program that will cost ~ $850K  Expansion of the mill is anticipated to a level of 30,0

  19. Slide 19: May Mac Mine: Plan View

    Slide 19: May Mac Mine: Plan View

    May Mac Mine: Plan View May Mac Mine 19

  20. Slide 20: May Mac Mine: Section View

    Slide 20: May Mac Mine: Section View

    May Mac Mine: Section View Planned Extension Planned 50m extension to intercept Ore Shoot “AA” 20

  21. Slide 21: Peruvian Miners

    Slide 21: Peruvian Miners

    Peruvian Miners  Golden Dawn is in negotiations with Minera Tauro S.A.C., one of the largest underground mining contractors in Peru  Experts at mining high‐grade, underground gold & silver quartz veins  The Minera Tauro Group has over 1800 miners working in South America & Africa in open pit mine

  22. Slide 22: May Mac & Wild Rose Summary

    Slide 22: May Mac & Wild Rose Summary

    May Mac & Wild Rose Summary  For around $800,000, Golden Dawn will have the data and permits in hand to determine if a bulk sample of 10,000 tons at either the May Mac Mine or Wild Rose Mine is warranted, is feasible and is economically viable  If successful, Golden Dawn will be ready to mine 10,0

  23. Slide 23: Airborne Geophysics Tilt Angle of Total Mag Intensity

    Slide 23: Airborne Geophysics Tilt Angle of Total Mag Intensity

    Airborne Geophysics Tilt Angle of Total Mag Intensity Magnetics Reveals Controlling Structures The Lind Creek fault is significant in that the majority of the past gold production in the Greenwood area has been from mineralization in the upper plate of Deadwood Resource the Lind Creek thrust. Wild R

  24. Slide 24: Golden Dawn Advantage

    Slide 24: Golden Dawn Advantage

    Golden Dawn Advantage  Golden Dawn has a consolidated land position (3,000 ha)  Strong technical & management team  Use of successful new technology, including Airborne TDEM = Time Domain TDEM Geophysics at The Greenwood Project Electromagnetics  Commitment to systematic exploration and developm

  25. Slide 25: Surveys & Drilling Completed

    Slide 25: Surveys & Drilling Completed

    Surveys & Drilling Completed AIRBORNE & GROUND GEOPHYSICS  AeroTEM III Total Magnetic Intensity (TMI)  AeroTEM III Electro‐Magnetics (ZOFF or ZOFF2)  Standard Induced Polarization (IP) – Boundary Falls, October, 2011 SURFACE EXPLORATION  2 Geochemical Surveys – 5,000+ soil samples & 500 MMI samp

  26. Slide 26: Going Forward

    Slide 26: Going Forward

    Going Forward MAY MAC & WILD ROSE MINES (2012)  Refurbishing adits and underground exploration MAY MAC & WILD ROSE MINES (2013)  10,000 ton bulk sampling from each mine  Rehabilitating flotation mill & tailings pond DEADWOOD GOLD ZONE (2013)  10,000 meter diamond drill program planned 26

  27. Slide 27: Capital Structure & Financials

    Slide 27: Capital Structure & Financials

    Capital Structure & Financials Share Price (July 15, 2012) $0.055 52 Week Range $0.05 ‐ $0.36 Market Cap $2.07M Issued Shares 42.6M Outstanding Warrants 11.9M Outstanding Options 1.3M Shareholders +750 Directors/Management Ownership ~15% 27

  28. Slide 28: Management & Directors

    Slide 28: Management & Directors

    Management & Directors Management Wolf Wiese President & CEO Derek Liu, CGA CFO Non‐Executive Directors Advisory Board Frank Wright, P. Eng. Stewart Jackson, PhD & P. Geo. Hans Schwabl Michael Dufresne, M. Sc. & P. Geo. George Sookochoff, B.Comm 28

  29. Slide 29: Contact

    Slide 29: Contact

    575 – 1111 West Hastings Street Vancouver, BC V6E 2J3 Tel: 604‐221‐8936 Fax: 604‐336‐1490 allinfo@goldendawnminerals.com www.goldendawnminerals.com 29

Source: Internet Archive copy of wp.goldendawnminerals.com