Dpm Metals Inc. · TSX:DPM

Dpm Metals — Dundee Precious Metals — Investor Presentation (June 2023)

32 slides from Dpm Metals's investor presentation, June 2023

  1. Slide 1: Unlocking Resources and Generating Value to Thrive and Grow Together

    Unlocking Resources and Generating Value Unlocking Resources and Generating Value TO THRIVE TO THRIVE AND GROW TOGETHER AND GROW TOGETHER June 2023 TSX:DPM TSX:DPM

  2. Slide 2: Forwarding Looking Statements

    Forwarding Looking Statements Certain statements and other information included in this presentation and our other disclosure documents constitute “forward looking statements” or “forward looking information” (collectively, “Forward Looking Statements”). Forward Looking Statements are statements tha

  3. Slide 3: Use of Non-GAAP Measures

    Use of Non-GAAP Measures Certain financial measures referred to in this presentation are not measures recognized under IFRS and are referred to as Non-GAAP financial measures or ratios. These measures have no standardized meanings under IFRS and may not be comparable to similar measures presented by

  4. Slide 4: Well-Positioned to Continue Delivering Value

    Well-Positioned to Continue Delivering Value DPM’s strong fundamentals represent an attractive value opportunity Strong Production & AISC Building Our Pipeline Profile • Advancing permitting for Loma Larga • 270,000 Au oz. average annual • New high-grade discovery at Čoka Rakita in production4 Serbi

  5. Slide 5: Delivering Value-Generating Catalysts

    Delivering Value-Generating Catalysts Recent newsflow highlights positive developments in DPM’s portfolio Ada Tepe life of mine plan with additional production New high-grade discovery in Serbia 22% increase to LOM recovered gold ounces Exceptional new drill results from Čoka Rakita High margin ounc

  6. Slide 6: Our Global Portfolio

    Our Global Portfolio Proven track record of transforming assets into highly-efficient operations CHELOPECH | gold-copper mine CANADA Location Chelopech, Bulgaria Ownership 100% CORPORATE HEAD OFFICE Stage Producing Location Toronto, Canada SERBIA TIMOK | gold project BULGARIA ADA TEPE | gold mine Lo

  7. Slide 7: Solid Three-Year Outlook

    Solid Three-Year Outlook Strong production profile, attractive AISC and significant free cash flow generation Strong Production Profile Attractive All-in Sustaining Cost Gold contained in concentrate produced All-in sustaining cost ($/oz. Au)(1) Improved compared to Improved compared to previous out

  8. Slide 8: Q1 2023 Results Highlights

    Q1 2023 Results Highlights Solid gold production and cost performance driving significant free cash flow Metals Production All-in Sustaining Cost1 Metals contained in concentrate produced ($ per gold ounce sold)(1) Gold (K oz.) 270 - 315 Copper (M lbs) $872 $700 - $860 69 30 - 35 7 4 Q1 2023 2023 Gu

  9. Slide 9: Attractive Development & Exploration Projects Driving Future Growth

    Attractive Development & Exploration Projects Driving Future Growth Portfolio offers strong production & FCF, and significant organic growth potential Operating Assets Loma Larga Exploration Projects 500 +200 koz8 Čoka Rakita & Timok gold project (Serbia) 450 Improved versus previous outlook as Tier

  10. Slide 10: High-Quality Growth Project: Loma Larga (Ecuador)

    High-Quality Growth Project: Loma Larga (Ecuador) Potential to add low-cost production growth to our portfolio Project milestones • Underground gold-copper development project with potential to produce approximately 200,000 gold ounces annually6 ✓ Technical approval of the Environmental Impact Asses

  11. Slide 11: Encouraging Exploration Results at Tierras Coloradas (Ecuador)

    Encouraging Exploration Results at Tierras Coloradas (Ecuador) Drilling confirms presence of well-mineralized low-sulphidation epithermal vein system Located in the Loja province of Ecuador Low sulphidation epithermal vein system mapped over a 3 x 3.5 km area ▪ Over 8 km of vein strike length deline

  12. Slide 12: High-Grade Discovery at Čoka Rakita (Serbia)

    High-Grade Discovery at Čoka Rakita (Serbia) Large defined footprint; remains open in multiple directions Overview TIMOK GOLD PROJECT Proven & Probable Mineral Reserve Located 3 km SE of Timok gold project 836 Koz., 22.7Mt @ 1.15 g/t Measured & Indicated Mineral Resource 693 Koz., 23.0 Mt @ 0.94 g/t

  13. Slide 13: Čoka Rakita Highlights & Next Steps

    Čoka Rakita Highlights & Next Steps Highlights • Strong mineralized footprint with high-grade zone • ~90% recoveries through gravity and flotation • Good infrastructure, approximately 35 km from Bor • Proximity to DPM operations in Bulgaria • Strong fit with underground and processing expertise • Op

  14. Slide 14: Chelopech: Near Mine Exploration to Add Resources

    Chelopech: Near Mine Exploration to Add Resources Focused on extending mine-life through in-mine and brownfields exploration Adding Mine Life Strong track record of adding incremental mineral reserves to offset depletion 2022: extended mine life to 2031 2023 Activities 50,000 m of brownfield drillin

  15. Slide 15: Ada Tepe: Brownfields Exploration

    Ada Tepe: Brownfields Exploration Focused on targets within mine concession and regional licences Priorities for 2023 11,000 m of drilling on the Chiirite licence Permitting for exploration drilling at Krumovitsa Drilling could increase to 26,000 m subject to the timing of permits TSX: DPM 15

  16. Slide 16: An Industry Leader in ESG

    An Industry Leader in ESG Sustainability highlights demonstrate our strong performance track record Reduced Total Reportable Reduced SO2 at Tsumeb by 95%, Injury Frequency Rate by 33% compared with peak in 2014 STRONG RATINGS by independent 6 million hours without a lost-time Zero discharge of indus

  17. Slide 17: Adding Value through Innovation

    Adding Value through Innovation Leveraging innovative technology to optimize performance and mitigate cost pressures Increasing Lowering Improving Reducing safety mining costs operating performance environmental impact Integrated machine vision Mechanized emulsion charging Advanced process control A

  18. Slide 18: Track Record of Disciplined Capital Allocation

    Track Record of Disciplined Capital Allocation Balancing financial strength, reinvestment and return of capital to shareholders Growing Financial Strength Investing in our Future $473M growing net cash position Cash position ($M) Added Loma Larga project and $433 $473 advancing permitting $150M undr

  19. Slide 19: Attractive Valuation

    Attractive Valuation DPM offers a compelling value opportunity Strong production Robust free cash flow Returning capital and cost profile and balance sheet to shareholders Building our pipeline Unique capabilities Attractive valuation Price to 2023 Cash Flow Dividend Yield P/NAV 10.9 10.5 10.6 3.9%

  20. Slide 20: Key Value Generating Catalysts

    Key Value Generating Catalysts Strong production Robust free cash flow Returning capital and cost profile and balance sheet to shareholders Building our pipeline Unique capabilities Attractive valuation CHELOPECH MINE ADA TEPE MINE LOMA LARGA PROJECT ČOKA RAKITA TSUMEB SMELTER • Optimized recoveries

  21. Slide 21: Appendix

    APPENDIX APPENDIX TSX DPM 21

  22. Slide 22: Detailed 2023 Guidance

    Detailed 2023 Guidance US millions, unless otherwise indicated Chelopech Ada Tepe Tsumeb Corporate and Other Consolidated Ore processed (’000s tonnes) 2,090 – 2,200 730 – 810 - - 2,820 – 3,010 Cash cost per tonne of ore processed1 53 – 58 73 – 79 - - - Metals contained in concentrate produced2,3 - G

  23. Slide 23: Three-Year Outlook

    Three-Year Outlook Strong production profile, attractive all-in sustaining cost & significant free cash flow generation • Gold production increased in 2023 and 2024, compared with previous outlook US millions, unless otherwise indicated 2022 RESULTS 2023 GUIDANCE 2024 OUTLOOK 2025 OUTLOOK Gold conta

  24. Slide 24: Chelopech, Bulgaria

    Chelopech, Bulgaria High-quality, low-cost flagship operation Chelopech, Bulgaria • Strong, reliable producer with a track record of extending mine life • Focused on mine and process plant optimization • Leader in digital innovation, achieving significant improvements in efficiencies, environmental

  25. Slide 25: Ada Tepe, Bulgaria

    Ada Tepe, Bulgaria Low-cost open pit operation generating significant free cash flow Ada Tepe, Bulgaria • One of the highest grade open pit mines in the world with a LOM gold grade of 5.2 g/t • Contributing significant free cash flow generation to DPM’s portfolio Gold Contained in Concentrate Produc

  26. Slide 26: Tsumeb, Namibia

    Tsumeb, Namibia Specialty smelter Tsumeb, Namibia • Focused on operational stability, efficiencies and cost reduction Complex Concentrate Smelted (k tonnes) Sustaining Capital Expenditures ($M) 230 230 230 19 14 - 17 14 - 17 174 10 - 13 4 4 4 4 4 2022A 2023E 2024E 2025 2022A 2023E 2024E 2025E 4. Ref

  27. Slide 27: Strong Mineral Resource and Mineral Reserve Base

    Strong Mineral Resource and Mineral Reserve Base Mineral Reserves 11, 12, A, B, C Mineral Resources 11, 12, A, B, C Million Au Cu Million Au Cu Au (g/t) Cu (%) Au (g/t) Cu (%) Tonnes (Moz) (Mlbs) Tonnes (Moz) (Mlbs) Chelopech Chelopech Proven 8.1 0.647 140 2.47 0.78 M&I 16.4 1.303 281 2.47 0.78 Prob

  28. Slide 28: Our GHG Emissions Reduction Targets

    Our GHG Emissions Reduction Targets The next step in realizing our objective of generating a net positive impact • Result of a global team effort, with representation from all our operations and projects • Targets are aligned with latest Intergovernmental Panel on Climate Change & reflect aspiration

  29. Slide 29: Top Shareholders and Analyst Coverage

    Top Shareholders and Analyst Coverage Dundee Precious Metals has 190M shares outstanding (as of December 31, 2022) TOP SHAREHOLDERS ANALYST COVERAGE Beacon Securities Bereket Berhe Blackrock Inc. 12.7% BMO Capital Markets Raj Ray Van Eck Associates Corporation 9.2% CIBC World Markets Cosmos Chiu Fir

  30. Slide 30: Footnotes

    Footnotes 1. Cost of sales per ounce of gold sold represents cost of sales for Chelopech and Ada Tepe, divided by payable gold in concentrate sold. This measure is before by-product credits. All-in sustaining cost per ounce of gold is a non-GAAP ratio which represents cost of sales less depreciation

  31. Slide 31: Footnotes and Disclaimers

    Footnotes and Disclaimers Qualified Person Disclosure A. The Mineral Resource and Mineral Reserve estimates for Chelopech and other scientific and technical information which supports this press release was prepared by Petya Kuzmanova, MIMMM, CSci, Senior Resource Geologist, of the Company, under th

  32. Slide 32: TSX:DPM

    Corporate Head Office 150 King Street West, Suite 902 Toronto, Ontario M5H 1J9 T: 416 365-5191 Investor Relations jcameron@dundeeprecious.com T: 416 219-6177 www.dundeeprecious.com Follow us on Twitter @DundeePrecious TSX:DPM Visit our LinkedIn page linkedin.com/company/dundee-precious-metals-inc/

Dundee Precious Metals — Investor Presentation (June 2023) on 6ix