  1. Slide 1: Uniquely Positioned to Deliver Superior Value

    TSX:DPM TSX: DPM ASX: DPM Uniquely Positioned to Deliver Superior Value Second Quarter 2026 Results July 31, 2026

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Forward Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of forward looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “guidance”, “outlook”

  3. Slide 3: Non-GAAP Measures

    Non-GAAP Measures Certain financial measures referred to in this presentation are not measures recognized under IFRS and are referred to as Non-GAAP financial measures or ratios. These measures have no standardized meanings under IFRS and may not be comparable to similar measures presented by other

  4. Slide 4: Q2 2026 Highlights

    Q2 2026 Highlights

  5. Slide 5: Second Quarter Highlights

    Second Quarter Highlights Performance demonstrates strengths that underpin growth strategy ☑ Advancing Growth Pipeline ☑ Record Financial Results • Major discovery at Brevene South Porphyry • Record $227 million of free cash flow2 • Wedge Zone exploration prospect • Record $211 million of adjusted n

  6. Slide 6: Vareš Ramping up to Full Production in 2026

    Vareš Ramping up to Full Production in 2026 On track to achieve 850,000 tonnes by year-end 2026 a transitional year for Vareš Ramp-up Progress through 2026 • Development rates advancing according to plan • Advancing paste backfill plant and second filter press • Accelerating gold and silver producti

  7. Slide 7: Progressing Priority Projects at Vareš

    Progressing Priority Projects at Vareš On track to achieve 850,000 tonne per annum rate by year-end Construction of paste backfill plant advancing well Progressing installation of the second tailings filter press 7 Information Category: Confidential - General

  8. Slide 8: Chelopech: Near-Term Growth Underpinned by Consistent Delivery

    Chelopech: Near-Term Growth Underpinned by Consistent Delivery On-track to meet 2026 guidance Q2 2026 Q2 2025 H1 2026 H1 2025 2026 Guidance4 Ore processed Kt 549 541 1,056 1,074 2,100 - 2,200 Head grades: Gold g/t 3.03 3.35 2.85 2.98 Silver g/t 18.04 6.49 15.93 6.48 Copper % 0.78 0.67 0.76 0.63 Reco

  9. Slide 9: Wedge Zone Discovery

    Wedge Zone Discovery Located in Chelopech mine concession approximately 250 m from existing Mineral Reserves • Potential to augment Chelopech life of mine plan • Initial mineral resource estimate by year-end 2026 • Newly discovered high-grade zone • Higher than current reserve grade of 2.2 g/t Au •

  10. Slide 10: Brevene South Porphyry Discovery

    Brevene South Porphyry Discovery Major discovery of high-grade gold-copper porphyry system adjacent to Chelopech mine • Results demonstrating grade, scale and continuity • 713 m at 2.52 g/t AuEq, including 398 m at 3 g/t AuEq • Hole terminated after drilled 1 km, ended in mineralization • Outlined a

  11. Slide 11: Advancing the Čoka Rakita Project

    Advancing the Čoka Rakita Project High-margin growth project with first production targeted for H1 2029 Feasibility Study Results6 • Feasibility study outlines a robust, high-margin gold operation $782M NPV5% | 36% IRR robust economics at $1,900/oz. Au • NPV5% of $2.2B at $3,500/oz. gold price • Swi

  12. Slide 12: Rakita Camp: Large, Untested Porphyry-Skarn System

    Rakita Camp: Large, Untested Porphyry-Skarn System Multiple prospects within 1km to 2km from Čoka Rakita project infrastructure • Intensive camp-wide exploration campaign ongoing • 5 discoveries since 2022, with several untested targets to the north • Drilling re-commended at the Čoka Rakita licence

  13. Slide 13: Ada Tepe: Responsible Mine Closure

    Ada Tepe: Responsible Mine Closure Restoring and returning the mine footprint to the Natura 2000 protected area • First new mine in the Balkans in over 40 years • Demonstration of DPM’s ability to permit, build and operate world-class assets Demonstrating a new track record of responsible mine closu

  14. Slide 14: Growing Precious Metals Producer

    Growing Precious Metals Producer Organic growth funded from a strong balance sheet Operating Assets Growth Pipeline Optimizing plan for Wedge Zone to potentially benefit 2028E 355 - 400 Growth prospects 305 - 365 320 - 365 Čoka Rakita Dumitru Potok 288 project +189,000 oz.6 Wedge Zone (first 5 years

  15. Slide 15: Financial Results Highlights

    Financial Results Highlights 1515

  16. Slide 16: Financial Results Highlights

    Financial Results Highlights Record earnings and free cash flow $ millions except where noted Q2 2026 Q2 2025 % change H1 2026 H1 2025 % change Record free cash flow2 Revenue 361.5 186.5 94% 671.9 330.6 103% $227.3 million Adjusted net earnings3 210.8 87.6 141% 379.0 143.0 165% Per share ($/sh) 0.95

  17. Slide 17: Key Cost Metrics and Capital Expenditures

    Key Cost Metrics and Capital Expenditures All-in sustaining cost1,5 Capital expenditures $ per GEO sold $ millions All-in sustaining cost Average realized gold price7 Sustaining Growth 200 - 230 215 $4,635 $4,375 1,300 - 1,450 62.1 28.0 25 - 32 $1,214 $1,417 3.2 6.4 Q2 2026 H1 2026 2026 Guidance 4 Q

  18. Slide 18: Financial Strength to Fund Growth

    Financial Strength to Fund Growth Growing cash position with no debt and a track record of shareholder returns Financial Position Shareholder Returns $ millions $ millions Total liquidity $1.2B Up to $200M of share buybacks in 2026 18 Information Category: Confidential - General

  19. Slide 19: Growing European Precious Metals Producer

    Growing European Precious Metals Producer Peer-leading growth and margins for quality returns through the cycle Hungary Operator with 11-year track record 350,000 GEO at $1,450/oz GEO sold Croatia Romania Bosnia and Serbia Herzegovina High-margin production growth Rakita Camp prospects Bulgaria deve

  20. Slide 20: Footnotes

    Footnotes 1 Cost of sales per GEO sold represents cost of sales for Chelopech, Ada Tepe and Vareš, divided by GEO sold. All-in sustaining cost per GEO sold, is a non-GAAP ratio which represents cost of sales less depreciation, amortization and other non-cash items plus treatment charges, penalties,

  21. Slide 21: Corporate Head Office Investor Relations

    Corporate Head Office 150 King Street West, Suite 902 Toronto, Ontario M5H 1J9 T: 416 365-5191 Investor Relations jcameron@dpmmetals.com T: 416 219-6177 www.dpmmetals.com