Blackrock Silver Corp · TSXV:BRC

Blackrock Silver — Investor Presentation (October 2024)

30 slides from Blackrock Silver's investor presentation, October 2024

  1. Slide 1: The Reawakening of the Queen of the Silver Camps

    THE REAWAKENING OF THE QUEEN OF THE SILVER CAMPS OCTOBER 2024 CORPORATE PRESENTATION TSX-V: BRC | OTC: BKRRF | FSE: AHZ0

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains “forward-looking statements” within the meaning of Canadian securities legislation. Such forward-looking statements concern the Company’s strategic plans, completion and exercise of the Tonopah option agreement, timing and expectations for the Co

  3. Slide 3: Stock Info

    STOCK INFO TSX-V: BRC | OTC: BKRRF | FSE: AHZ0 Institutions Including, but not limited to: BRC Share Price Performance Since 2019 First Majestic Silver Blackrock 800.0% 4000% Eric Sprott SILJ - Prime Junior Silver Miners Index 58.8% BRC 3500% 105.4% SSI A.M. Silver Price (US$) Gold Price (US$) 108.7

  4. Slide 4: Tonopah West: Advanced Discovery

    Tonopah West: Advanced Discovery • Updated 2024 mineral resource estimate outlines 6.35M tonnes at block diluted grade of 492.5 g/t AgEq for 100.56M ounces AgEq * • Low Cost/Robust Production: PEA outlines 8.6M AgeQ *See news release dated September 4, 2024 . ounces annually at $11.96 AISC; After-ta

  5. Slide 5: Tonopah Silver District

    TONOPAH SILVER DISTRICT The Queen of the Silver Camps • One of the largest historic silver districts in North America, producing 174 Mozs Ag & 1.8 Mozs Au from 7.5m tonnes • Mined from underground from 1900 to 1930, with peak years producing up to 14,000,000oz/ year AgEq; Victor vein was 24m thick w

  6. Slide 6: PEA - Key Metrics

    PEA - Key Metrics Assumption / Results 2024 PEA Total tonnes processed over the LOM 4,114,000 Base Case : $23 Silver, $1900 Gold: Total waste mined over the LOM Gold grade mined – LOM average (g/t) 1,486,000 3.34 • After-tax NPV (5%) $326-million Silver grade mined – LOM average (g/t) 271.0 Silver E

  7. Slide 7: Production & AISC of Tonopah West vs Major Silver Mines

    PRODUCTION & AISC OF TONOPAH WEST VS MA JOR SILVER MINES 25 $30 22.5 $28.54 2023 Annual Silver Eq Sales (M oz Ag Eq) 2023 AISC (US$/oz Ag Eq) 20.8 $26.54 20.3 $23.86 $25 20 $24.28 18.1 $22.93 17.3 Annual Silver Eq Sales (M oz Ag Eq) 16.9 $22.55 $20.45 $21.76 $20 $19.40 AISC (US$/oz Ag Eq) 15 $20.26

  8. Slide 8: Tonopah West PEA vs Other PEA/PFS Stage Silver Projects

    TONOPAH WEST PEA VS OTHER PEA/PFS STAGE SILVER PROJECTS Capital Intensity (Initial CAPEX / Annual Production) (US$/oz AgEq) Enterprise Value / Project NPV5% 0.63x $34.04 $29.64 $28.08 0.48x $19.89 $20.68 0.31x $14.71 0.24x 0.19x 0.15x Reta Institutional: 52% Panuco - Vizsla El Tigre - Silver Tonopah

  9. Slide 9: Tonopah West: Picking Up Where Historic Miners Left Off

    TONOPAH WEST: PICKING UP WHERE HISTORIC MINERS LEFT OFF Amalgamation of West End Mining Company and Tonopah Extension Mining Company now owned 100% by Blackrock Silver. This property represents the 3rd largest producer in the district. Purple - Tonopah Extension Mining Company land (in purple) has n

  10. Slide 10: Clear Resource Expansion Potential; Conventional Underground Mining Methods

    CLEAR RESOURCE EXPANSION POTENTIAL; CONVENTION UNDERGROUND MINING METHODS • Multiple deposits tracked across open vein corridor spanning 4km in strike length with large gaps (1.5km) remaining to infill to bridge deposits together as one • The system also remains open to the south, northwest, at dept

  11. Slide 11: Drills Turning

    DRILLS TURNING • Fully-funded 20,000 metre, 50 drillhole program utilizing 3 drill rigs (2 core, 1 RC) now underway • In-fill drilling (40 drillholes) on 25-metre centers, is anticipated to convert inferred resources located in the shallower portions of the Bermuda and Merten vein systems into measu

  12. Slide 12: Tonopah West PEA vs Other PEA/PFS Stage Silver Projects

    TONOPAH WEST PEA VS OTHER PEA/PFS STAGE SILVER PROJECTS Company Unit Blackrock AbraSilver New Pacific Silver Tiger Southern Silver Vizsla Market Capitalization C$M $69.2 $297.2 $334.0 $71.2 $80.1 $676.3 Enterprise Value C$M $57.7 $292.5 $301.6 $65.5 $78.4 $657.1 Consensus Research P/NAV 0.19x 0.48x

  13. Slide 13: PEA - Sensitivities

    PEA - Sensitivities After-Tax IRR Sensitivity to Metal Prices After-Tax NPV 5% Sensitivity to Metal Prices (US$M) Silver Price ($US/Troy Oz.) Silver Price ($US/Troy Oz.) -20% -10% 23.00 10% 20% -20% -10% 23.00 10% 20% 20% 40% 44% 47% 51% 54% 20% 334 374 414 454 495 ($US/Troy Oz.) ($US/Troy Oz.) 10%

  14. Slide 14: PEA - Operating and Capital Costs

    PEA - Operating and Capital Costs LOM Per Payable Oz Per Payable Oz Operating Costs (US$M) Ag (US$) AgEq (US$) Mining 328 $ 10.31 $ 4.91 Processing 154 $ 4.85 $ 2.31 General Administrative (site) 24 $ 0.77 $ 0.36 Royalties and Production Taxes 95 $ 3.00 $ 1.43 Current Reclamation & Bond Premiums 5 $

  15. Slide 15: PEA – Production Profile

    PEA – Production Profile Operating Production (2) Gross Operatin Sustainin Initial Project Costs & Year Revenue g Cash g Capex Cash AISC Royalties Capex Gold Silver (3) Flow (6) Flow (7) (5) (4) Kozs US$ Millions Year -2 0 0 0 0 0 0 18 -18 0 Year -1 0 0 0 0 0 0 126 -126 0 Year 1 35 2837 133 53 79 40

  16. Slide 16: PEA – Resource Estimate

    PEA – AgEq BLOCK DILUTED GRADE Ounces of Ounces of Ounces Area cutoff g/t Tonnes Silver Gold AgEq Silver Classification(4) (1) Silver of Gold g/t g/t g/t (2) Equivalent(3) Victor 190 2,255,000 258 3.05 532.8 18,698,000 221,000 38,621,000 Inferred Resource DP Bermuda NW Step 190 190 190 1,652,000 1,4

  17. Slide 17: PEA – Site Layout

    PEA – Site Layout Small footprint 1,500 tonnes per day Mill Produce gold and silver dore’ bars at site A portion of the tailing used underground as paste back fill See September 4, 2024 news relese

  18. Slide 18: Gold & Silver Recoveries

    GOLD & SILVER RECOVERIES Silver Extraction 450 400 Extracted Ag, gms/MT 350 300 250 200 150 100 50 0 Denver/Paymaster/Mule Bermuda/Merten Victor Composite Northwest Composite Composite Composite p80 0.075 mm p80 0.053 mm p80 0.045 mm p80 0.053 mm p80 0.053 mm p80 0.053 mm p80 0.053 mm p80 0.053 mm p

  19. Slide 19: Silver Explorers/Developers by Grade & In Situ Multiples

    SILVER EXPLORERS/DEVELOPERS BY GRADE & IN SITU MULTIPLES Blackrock’s mineral resource at 190g/t AgEq cutoff $1.60 Primarily Au-Ag Au - Ag - Polymetallic $1.40 Dolly Varden Vizsla $1.20 EV/Resources (US$/oz AgEq) $1.00 Prime AbraSilver $0.80 $0.60 Blackrock $0.40 Silver One Reta Institutional: 52% Si

  20. Slide 20: Infrastructure, Electricity, Casinos..

    Infrastructure, Electricity, Casinos.. TONOPAH WEST PROJECT 20 OCTOBER 2024|20

  21. Slide 21: Tonopah North Lithium

    TONOPAH NORTH LITHIUM • Large land package consists of 260 unpatented mining claims covering 20 sq km adjacent to Tonopah West vein system to south and American Lithium’s TLC Project to northwest, representing the crossroads between where the Tonopah silver district intersects with the Tonopah lithi

  22. Slide 22: Silver Cloud

    SILVER CLOUD The Richest Gold Mining Area In North America • Large land package consists of 572 mining claims covering 45sq km (+12,000 acres) • Centered on the Northern Nevada Rift, adjacent to Hecla’s Hollister mine • 3 core drillhole programme completed in November 2022 led to Nevada’s newest bon

  23. Slide 23: LS Epithermal Pathfinders: Historic Mercury Mines

    LS EPITHERMAL PATHFINDERS: HISTORIC MERCURY MINES • Mercury and arsenic are the ultimate pathfinder elements for low-sulphidation epithermal gold deposits • The Silver Cloud project is named after the past producing Silver Cloud gold mine where past high-grade intercepts were encountered by Teck and

  24. Slide 24: Similar Trends & Depths

    SIMILAR TRENDS & DEPTHS There is no assurance that mineralization comparable to that on adjacent properties will be discovered on Blackrock’s Silver Cloud Project -North-Northwest veins -Productive zone between 4200 and 5100 ft RL - Volcanic hosted BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE:

  25. Slide 25: Comparison of Midas & Hollister Mines

    COMPARISON OF MIDAS & HOLLISTER MINES There is no assurance that mineralization comparable to that on adjacent properties will be discovered on Blackrock’s Silver Cloud Project 5000 ft RL Midas Mine • NNW-NW oriented veins Hollister Mine • Productive zone between 4500 and 5500 ft RL • E-W oriented v

  26. Slide 26: Leadership

    LEADERSHIP Bill Howald Andrew Pollard Daniel Vickerman Executive Chairman President & CEO, Director SVP Corporate Development, Director William (Bill) Howald is a successful entrepreneur who Prior to joining Blackrock as President & CEO in 2019, Mr. Vickerman is a seasoned institutional sales and fo

  27. Slide 27: Leadership

    LEADERSHIP David Laing Tony Wood Edie Thome Andrew Kaip Director Director Director Lead Director David Laing is a mining engineer with 40 Tony Wood currently serves as Chief Ms. Edie Thome brings a wealth of years of experience in the industry. He is Financial Officer of Aurania Resources senior lea

  28. Slide 28: TSX-V: BRC OTC: BKRRF FSE: AHZ0

    TSX-V: BRC www.blackrocksilver.com OTC: BKRRF FSE: AHZ0

  29. Slide 29: Addendum – Significant Intercepts

    ADDENDUM – SIGNIFICANT INTERCEPTS HOLEID Area From (m) To (m) Length (m) Au_g/t Ag_g/t AgEq_g/t HOLEID Area From (m) To (m) Length (m) Au_g/t Ag_g/t AgEq_g/t HOLEID Area From (m) To (m) Length (m) Au_g/t Ag_g/t AgEq_g/t TW20-001 Victor Vein 554.7 557.8 3.0 2.435 221.3 464.8 TW20-041C Victor 578.2 58

  30. Slide 30: Addendum – Significant Intercepts

    ADDENDUM – SIGNIFICANT INTERCEPTS HOLEID Area From (m) To (m) Length (m) Au_g/t Ag_g/t AgEq_g/t HOLEID Area From (m) To (m) Length (m) Au_g/t Ag_g/t AgEq_g/t TXC21-026 DPB 359.1 363.2 4.1 9.070 1120.0 2027.0 Including 381 382.5 1.5 5.467 487.3 1034.0 Including 361.2 362.1 0.9 20.850 2994.5 5079.5 TX

Blackrock Silver — Investor Presentation (October 2024) on 6ix