Blackrock Silver Corp · TSXV:BRC

Blackrock Silver — Investor Presentation (October 2025)

31 slides from Blackrock Silver's investor presentation, October 2025

  1. Slide 1: Driving the Queen of the Silver Camps Towards Production

    DRIVING THE QUEEN OF THE SILVER CAMPS TOWARDS PRODUCTION OCTOBER 2025 CORPORATE PRESENTATION TSX-V: BRC | OTC: BKRRF | FSE: AHZ0

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains "forward-looking statements" and "forward-looking information" (collectively, “forward-looking statements”) within the meaning of Canadian and United States securities legislation, including the United States Private Securities Litigation Reform

  3. Slide 3: Stock Info

    STOCK INFO TSX-V: BRC | OTC: BKRRF | FSE: AHZ0 Institutions Including, but not limited to: BRC Share Price Performance Last 12 Months Eric Sprott $1.00 14 Global X Silver Miners Volume in Millions Share Price (C$) $0.90 Index (SIL) 12 $0.80 Sprott A.M. 10 41% $0.70 Volume in Millions US Global Share

  4. Slide 4: Tonopah West: Silver-Gold

    Tonopah West: Silver-Gold • Updated 2025 mineral resource estimate outlines 21.1M AgEq ounces Indicated within 1.33M tonnes at a block diluted grade of 493 g/t AgEq AND 86.88M AgEq ounces Inferred within 5.14M tonnes at a block diluted grade of 523 g/t AgEq 1 AgEq cutoff grade is based a total minin

  5. Slide 5: Tonopah Silver District

    TONOPAH SILVER DISTRICT The Queen of the Silver Camps • One of the largest historic silver districts in North America, producing 174 Mozs Ag & 1.8 Mozs Au from 7.5m tonnes • Mined from underground from 1900 to 1930, with peak years producing up to 14,000,000oz/ year AgEq; Victor vein was 24m thick w

  6. Slide 6: PEA based on September 2024 MRE - Key Metrics

    PEA based on September 2024 MRE - Key Metrics Assumption / Results 2024 PEA Total tonnes processed over the LOM 4,114,000 Base Case : $23 Silver, $1900 Gold: Total waste mined over the LOM 1,486,000 Gold grade mined – LOM average (g/t) 3.34 • After-tax NPV (5%) $326-million Silver grade mined – LOM

  7. Slide 7: Resource Estimate

    AgEq BLOCK DILUTED GRADE Ounces of Ounces of Ounces Area cutoff g/t Tonnes Silver Classification(4) 2025 (1) Silver Gold AgEq Silver of Gold g/t g/t g/t (2) Equivalent(3) Victor 180 2,361,000 256.7 3.08 593.2 19,486,000 234,000 45,028,000 Inferred DPB North 180 229,000 166.4 2.01 386.1 1,226,000 15,

  8. Slide 8: Tonopah West Project Timeline

    TONOPAH WEST PROJECT TIMELINE % Reta Institutional: 52% • See February 18, 2025, news release BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE: AHZ0 October 2025 | 8

  9. Slide 9: Tonopah West: Picking Up Where Historic Miners Left Off

    TONOPAH WEST: PICKING UP WHERE HISTORIC MINERS LEFT OFF Amalgamation of West End Mining Company and Tonopah Extension Mining Company now owned 100% by Blackrock Silver. This property represents the 3rd largest historic producer in the district*. Purple - Tonopah Extension Mining Company land (in pur

  10. Slide 10: Clear Resource Expansion Potential

    CLEAR RESOURCE EXPANSION POTENTIAL • Multiple deposits tracked across open vein corridor that follows outer and an inner ring structures spanning 4.5km in strike length • The system also remains open to the south, northwest, at depth. • Conversion drilling at DPB-South established initial Indicated

  11. Slide 11: Eastern Expansion Drill Program

    Eastern Expansion Drill Program • 7,000 metre, 24 drillhole, Eastern Expansion drill program targeting 1.2km trend completed in September. • Initial Assays*: • TXC25-166: 5.03 metres grading 750 g/t AgEq (306.8 g/t Ag & 4.06 g/t gold Au from 165.2 metres, including 1.83 metres grading 1,660 g/t AgEq

  12. Slide 12: DPB South Sections

    DPB SOUTH SECTIONS BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE: AHZ 12

  13. Slide 13: Denver, Paymaster, Bermuda and Merten Veins

    DENVER, PAYMASTER, BERMUDA AND MERTEN VEINS BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE: AHZ 13

  14. Slide 14: Denver, Paymaster, Bermuda and Merten Veins

    DENVER, PAYMASTER, BERMUDA AND MERTEN VEINS BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE: AHZ 14

  15. Slide 15: Denver, Paymaster, Bermuda and Merten Veins

    DENVER, PAYMASTER, BERMUDA AND MERTEN VEINS BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE: AHZ 15

  16. Slide 16: 2020-2025 Drill Campaign

    2020-2025 DRILL CAMPAIGN 165.5 km of RC & Core drilling completed from June 2020 to September 2025 2020-focus: maiden drill program focussed on discovery 2021 –focus: resource delineation and maiden resource estimate 2022 –focus: step out exploration drilling 2023 –focus: resource modelling and upda

  17. Slide 17: Tonopah West PEA Report – September 2024

    Tonopah West PEA REPORT – SEPTEMBER 2024

  18. Slide 18: PEA – Site Layout

    PEA – Site Layout Small footprint 1,500 tonnes per day Mill Produce gold and silver dore’ bars at site A portion of the tailing used underground as paste back fill “See Tonopah West Technical Report filed on the Company’s SEDAR+ profile at www.sedarplus.ca and the Company’s September 4, 2024 news re

  19. Slide 19: PEA - Sensitivities

    PEA - Sensitivities After-Tax IRR Sensitivity to Metal Prices Silver Price ($US/Troy Oz.) After-Tax NPV 5% Sensitivity to Metal Prices (US$M) -20% -10% 23.00 10% 20% Silver Price ($US/Troy Oz.) 20% 40% 44% 47% 51% 54% -20% -10% 23.00 10% 20% ($US/Troy Oz.) 20% 334 374 414 454 495 Gold Price 10% 36%

  20. Slide 20: PEA - Operating and Capital Costs

    PEA - Operating and Capital Costs LOM Per Payable Oz Per Payable Oz Operating Costs (US$M) Ag (US$) AgEq (US$) Mining 328 $ 10.31 $ 4.91 Processing 154 $ 4.85 $ 2.31 General Administrative (site) 24 $ 0.77 $ 0.36 Royalties and Production Taxes 95 $ 3.00 $ 1.43 Current Reclamation & Bond Premiums 5 $

  21. Slide 21: PEA – Production Profile

    PEA – Production Profile Operating Production (2) Gross Operatin Sustainin Initial Project Costs & Year Revenue g Cash g Capex Cash AISC Royalties Capex Gold Silver (3) Flow (6) Flow (7) (5) (4) Kozs US$ Millions Year -2 0 0 0 0 0 0 18 -18 0 Year -1 0 0 0 0 0 0 126 -126 0 Year 1 35 2837 133 53 79 40

  22. Slide 22: Gold & Silver Recoveries

    GOLD & SILVER RECOVERIES Silver Extraction 450 400 Extracted Ag, gms/MT 350 300 250 200 150 100 50 0 Denver/Paymaster/Mule Bermuda/Merten Victor Composite Northwest Composite Composite Composite p80 0.075 mm p80 0.053 mm p80 0.045 mm p80 0.053 mm p80 0.053 mm p80 0.053 mm p80 0.053 mm p80 0.053 mm p

  23. Slide 23: Infrastructure, Electricity, Casinos..

    Infrastructure, Electricity, Casinos.. TONOPAH WEST PROJECT 23 October 2025|23

  24. Slide 24: Tonopah North Lithium

    TONOPAH NORTH LITHIUM • Large land package consists of 260 unpatented mining claims covering 20 sq km adjacent to Tonopah West vein system to south and American Lithium’s TLC Project to northwest, representing the crossroads between where the Tonopah silver district intersects with the Tonopah lithi

  25. Slide 25: Silver Cloud

    SILVER CLOUD The Richest Gold Mining Area In North America • Large land package consists of 572 mining claims covering 45sq km (+12,000 acres) • Centered on the Northern Nevada Rift, adjacent to Hecla’s Hollister mine • 3 core drillhole programme completed in November 2022 : SBC22-020 intersected 70

  26. Slide 26: LS Epithermal Pathfinders: Historic Mercury Mines

    LS EPITHERMAL PATHFINDERS: HISTORIC MERCURY MINES • Mercury and arsenic are the ultimate pathfinder elements for low-sulphidation epithermal gold deposits • The Silver Cloud project is named after the past producing Silver Cloud gold mine where past high-grade intercepts were encountered by Teck and

  27. Slide 27: Similar Trends & Depths

    SIMILAR TRENDS & DEPTHS There is no assurance that mineralization comparable to that on adjacent properties will be discovered on Blackrock’s Silver Cloud Project -North-Northwest veins -Productive zone between 4200 and 5100 ft RL - Volcanic hosted BLACKROCKSILVER.COM| TSX-V: BRC | OTC: BKRRF | FSE:

  28. Slide 28: Comparison of Midas & Hollister Mines

    COMPARISON OF MIDAS & HOLLISTER MINES There is no assurance that mineralization comparable to that on adjacent properties will be discovered on Blackrock’s Silver Cloud Project 5000 ft RL Midas Mine • NNW-NW oriented veins Hollister Mine • Productive zone between 4500 and 5500 ft RL • E-W oriented v

  29. Slide 29: Executive Directors

    Executive Directors Bill Howald Andrew Pollard Daniel Vickerman Executive Chairman President & CEO, Director SVP Corporate Development, Director William (Bill) Howald is a successful Andrew Pollard is a company builder with Mr. Vickerman is a seasoned institutional entrepreneur who founded several p

  30. Slide 30: Independent Directors

    Independent Directors Tony Wood Tom Peregoodoff David Laing Director Director Lead Director Tony Wood currently serves as Chief David Laing is a mining engineer with 40 Financial Officer of Aurania Resources Inc. Tom Peregoodoff has over 30 years of resource years of experience in the industry. He i

  31. Slide 31: TSX-V: BRC OTC: BKRRF FSE: AHZ0

    TSX-V: BRC www.blackrocksilver.com OTC: BKRRF FSE: AHZ0

Blackrock Silver — Investor Presentation (October 2025) on 6ix