Royal Bafokeng Platinum Ltd

Royal Bafokeng Platinum — Bank of America Merrill Lynch 2012 Global Metals, Mining & Steel Conference

41 slides from Royal Bafokeng Platinum's conference presentation, May 15, 2012

  1. Slide 1: A compelling platinum investment

    Slide 1: A compelling platinum investment

    A compelling platinum investment Bank of America Merrill Lynch 2012 Global Metals, Mining & Steel Conference, Miami 15–17 May 2012 www.bafokengplatinum.co.za

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: About RBPlat

    Slide 3: About RBPlat

    About RBPlat www.bafokengplatinum.co.za 2

  4. Slide 4: About Royal Bafokeng Platinum (RBPlat)

    Slide 4: About Royal Bafokeng Platinum (RBPlat)

    About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Assets located on Western Limb of Bushveld Complex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine JV (unincorporated JV with Anglo American Platinum) • BRPM (operating since 1998), producin

  5. Slide 5: Ownership structure

    Slide 5: Ownership structure

    Ownership structure Royal Bafokeng Holdings (RBH) Anglo American Platinum Public Investors 100% 100% Royal Bafokeng Platinum Holdings Rustenburg Platinum Mines 57.13% 30.25% 12.62% 100% Royal Bafokeng Resources 33% 67% Bafokeng Rasimone Platinum Mine JV Project expansion Operations Styldrift I BRPM

  6. Slide 6: Prime location on the Western Limb

    Slide 6: Prime location on the Western Limb

    Prime location on the Western Limb www.bafokengplatinum.co.za 5

  7. Slide 7: Ideally positioned for regional consolidation

    Slide 7: Ideally positioned for regional consolidation

    Ideally positioned for regional consolidation www.bafokengplatinum.co.za 6

  8. Slide 8: Our strategy

    Slide 8: Our strategy

    Our strategy • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • Build flexibility in the business with co-extraction, whilst maintaining Merensky bias • Pursue value-enhancing acquisitions and synergies • Bring Styldrift II forward

  9. Slide 9: Our business

    Slide 9: Our business

    Our business www.bafokengplatinum.co.za 8

  10. Slide 10: Quality resource with attractive prill splits

    Slide 10: Quality resource with attractive prill splits

    Quality resource with attractive prill splits 100% Inclusive Resource RBPlat 67% Au Description Mt 4E g/t 4E Moz Mt 4E g/t 4E Moz Rh 5% BRPM 4% Merensky Measured 14.92 7.63 3.66 10.00 7.63 2.45 Indicated 8.26 7.27 1.93 5.53 7.27 1.29 Pd Inferred 7.64 8.12 1.99 5.12 8.12 1.34 27% Merensky Total 30.82

  11. Slide 11: Quality high-grade resource: resources versus production

    Slide 11: Quality high-grade resource: resources versus production

    Quality high-grade resource Resources versus production Bubble size = 4E PGM production 300 250 Zimplats Lonmin 200 Resource size, (Moz 4E) Amandelbult 150 ILA 100 Bokoni Modikwa BRPM JV: RPM 73.49Moz 6.11 g/t (4E) 50 Zondereinde Marula 0 2 3 4 5 6 7 BRPM JV – Pre Styldrift -50 Source: SFA (Oxford),

  12. Slide 12: Well-understood orebody

    Slide 12: Well-understood orebody

    Well-understood orebody 3D seismic survey • Cumulative drilling up to end of 2011 • total intersection points: 9 150 • total drillholes: 6 023 • total metres: 1 397km • 2011 exploration: • 65 surface drillholes, 70 000m (50 342m Styldrift II, 19 658m Frischgewaagd) • 260 reef intersections per reef

  13. Slide 13: Well-established shallow Merensky producer on Western Limb

    Slide 13: Well-established shallow Merensky producer on Western Limb

    Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 13 years of operation • well-understood, defined geology • well established mining platform • experienced management team • full mining and concentrating infrastructure on BRPM site (200ktpm) • Shallow depth

  14. Slide 14: Long-term shallow depth mining

    Slide 14: Long-term shallow depth mining

    Long-term shallow depth mining Source: SFA (Oxford), company reports www.bafokengplatinum.co.za 13

  15. Slide 15: Styldrift at 740 mbs in a shrinking minority of shallow mines

    Slide 15: Styldrift at 740 mbs in a shrinking minority of shallow mines

    Styldrift at 740 mbs in a shrinking minority of shallow mines South Africa: 2010 South Africa: 2020 production by depth production by depth Source: SFA (Oxford), company reports 13% 35% 31% 18% 33% 34% 19% 17% <500 mbs 500 - 1000 mbs <500 mbs 500 - 1000 mbs 1000 - 1500 mbs + 1500 mbs 1000 - 1500 mbs

  16. Slide 16: Merensky biased production, with significant quality UG2

    Slide 16: Merensky biased production, with significant quality UG2

    Merensky biased production, with significant quality UG2 • Merensky production growth at Styldrift I from 2017 • 2.7Mtpa yielding 320koz 4E/annum • total BRPM JV production 610koz 4E/annum • UG2 to gradually replace Merensky production from 2014 at BRPM South shaft, and from 2025 at North shaft • UG

  17. Slide 17: Competitive operating cost with scope for further cost reduction

    Slide 17: Competitive operating cost with scope for further cost reduction

    Competitive operating cost with scope for further cost reduction • Improvement opportunities Pt Source: Macquarie research, company reports • continued optimisation of production volumes • cost optimisation through expenditure review and analysis • leveraging full potential of BRPM resource base • e

  18. Slide 18: Poised to grow organically and through consolidation

    Slide 18: Poised to grow organically and through consolidation

    Poised to grow organically and through consolidation • High-grade resource base with significant organic growth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining shallow Merensky reef • increase in production planned with Styldrift I Project (

  19. Slide 19: Poised to grow organically and through consolidation, cont’d

    Slide 19: Poised to grow organically and through consolidation, cont’d

    Poised to grow organically and through consolidation, cont’d Value-enhancing transactions with Impala • Key commercial terms agreed on: • 7-year mining arrangement (concluded in 2010) with Impala via Impala’s #6 and #8 shafts • resource of 780koz (4E) of UG2 • 30-year mining arrangement (concluded i

  20. Slide 20: Our operations

    Slide 20: Our operations

    Our operations www.bafokengplatinum.co.za 19

  21. Slide 21: BRPM: well-developed infrastructure

    Slide 21: BRPM: well-developed infrastructure

    BRPM: well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO www.bafokengplatinum.co.za 20

  22. Slide 22: BRPM: geology, layout and access

    Slide 22: BRPM: geology, layout and access

    BRPM: geology, layout and access Layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding www.bafokengplatinum.co.za 21

  23. Slide 23: BRPM: production

    Slide 23: BRPM: production

    BRPM: production • Smooth operational handover from 4th January 2010 BRPM recovery (4E) % 89.0 87.8 • Operational strategy aimed at optimising 87.0 86.1 86.3 86.5 throughput and revenue 85.0 84.1 • expand UG2 production 83.0 % 81.0 • increase stopable reserves 79.0 • upgrading of BRPM concentrator 7

  24. Slide 24: BRPM: operating costs

    Slide 24: BRPM: operating costs

    BRPM: operating costs Description Unit 2011 2010 Operating labour Employees 7 942 7 670 On-mine cash cost/tonne milled R/t 782 707 On-mine cash cost/4E oz delivered R/oz (4E) 6 399 5 901 On-mine cash cost/Pt oz delivered R/oz (Pt) 9 863 9 076 www.bafokengplatinum.co.za 23

  25. Slide 25: Styldrift I Project

    Slide 25: Styldrift I Project

    Styldrift I Project www.bafokengplatinum.co.za 24

  26. Slide 26: Styldrift I Project

    Slide 26: Styldrift I Project

    Styldrift I Project Capital budget – nominal R millions Capital cash flow – nominal 3 000 Description Unit Mining Concentrator Total 2 500 Authorised and 2 000 Rm 6 289 1 422 7 711 contingency 1 500 Escalation Rm 3 153 938 4 091 1 000 500 Total nominal Rm 9 442 2 360 11 802 0 Latest cost forecast Rm

  27. Slide 27: Styldrift I Project, cont’d

    Slide 27: Styldrift I Project, cont’d

    Styldrift I Project, cont’d Project timetable • Overall project on schedule • Progress (30th April 2012) • planned % complete: 28.16% • actual % complete: 28.24% www.bafokengplatinum.co.za 26

  28. Slide 28: Styldrift I Project, cont’d

    Slide 28: Styldrift I Project, cont’d

    Styldrift I Project, cont’d Production profile Styldrift I production 3 000 2 500 2 000 kt 1 500 1 000 500 - Styldrift I Merensky www.bafokengplatinum.co.za 27

  29. Slide 29: Styldrift I Project, cont’d

    Slide 29: Styldrift I Project, cont’d

    Styldrift I Project, cont’d Optimisation studies • Detailed review of overall mine design in progress, key elements being reviewed: • room and pillar and associated infrastructure • room widths reduced to 8m • redesign of stope ore handling infrastructure requirements (on reef as opposed to footwall

  30. Slide 30: Further organic growth in Styldrift II

    Slide 30: Further organic growth in Styldrift II

    Further organic growth in Styldrift II • Styldrift II project area • resource area ± 23 million m2 • depth 900m — 1 400m, average dip 90 • average Merensky/UG2 middling 35m • Potential size of investment similar to Styldrift I • Opportunity being evaluated through: • study consisting of a concept, p

  31. Slide 31: Financial performance

    Slide 31: Financial performance

    Financial performance www.bafokengplatinum.co.za 30

  32. Slide 32: Key features for year ended 31 December 2011

    Slide 32: Key features for year ended 31 December 2011

    Key features for year ended 31 December 2011 • Fatality-free year • Conclusion of landmark three-year wage agreement • Production of 281 598 PGMs (4E oz) despite challenging environment • BRPM concentrator recoveries improve by 1.5% to 87.83% • BRPM revenue up by 2% to R2.97 billion • Cash operating

  33. Slide 33: Key financial performance indicators

    Slide 33: Key financial performance indicators

    Key financial performance indicators* Description 2011 2010 Average basket price (R/Pt oz) 16 282 15 555 Revenue (Rm) 2 975 2 107 Cost of sales (Rm) 2 409 1 608 Gross profit (Rm) 566 499 Operating profit (Rm) 517 440 EBITDA (Rm) 1 036 815 Net profit after tax (Rm) 411 3 166 Headline earnings (Rm) 27

  34. Slide 34: Key financial performance indicators, cont’d

    Slide 34: Key financial performance indicators, cont’d

    Key financial performance indicators, cont’d Description 2011 2010 Cash generated by operations (Rm) 1 025 785 Cash, net of debt (incl. pref share investment) (Rm) 1 364 1 150 Capex (Rm) 1 164 976 Gross profit margin (%) 19 24 EBITDA margin (%) 35 39 NAV (Rand per share) 69 67 www.bafokengplatinum.c

  35. Slide 35: Sales volumes by metal and average prices achieved

    Slide 35: Sales volumes by metal and average prices achieved

    Sales volumes by metal and average prices achieved 2011 Average price Metals contribution to 2011 revenue Description Sales achieved* volumes ($) Cu, 2.3 Co, 0.4 Platinum (oz) 182 712 1 697/oz Ni, 9.3 Ru, 0.7 Palladium (oz) 74 820 720/oz Ir, 1.1 Rh, 5.4 Gold (oz) 9 806 1 716/oz Au, 3.6 Rhodium (oz)

  36. Slide 36: Breakdown of cost of sales

    Slide 36: Breakdown of cost of sales

    Breakdown of cost of sales* Breakdown of 2011 COS (%) Description 2011 2010 3% R million Labour 674 490 33% 36% Utilities 145 88 Contractor costs 377 264 Materials and other mining costs 583 402 Other 80 (10) 8% 20% Labour Cost of sales (excluding 1 891 1 234 depreciation and amortisation) Utilities

  37. Slide 37: Cash flow analysis

    Slide 37: Cash flow analysis

    Cash flow analysis 2500.0 326 1 147 2000.0 1 025 1500.0 250 15 1 364 R million 4 1 099 1000.0 899 500.0 0.0 Cash and cash Cash generated Settlement of Capex Other Cash and cash Initial Dividends Cash and cash equivalent 1 Jan by operations RPM receivable equivalent 31 investment capitalised to equiv

  38. Slide 38: 1st quarter 2012 performance

    Slide 38: 1st quarter 2012 performance

    1st quarter 2012 performance % Change Q1 Q1 Q4 Q1 2012 Q1 2012 Description Unit 2012 2011 2011 vs. vs. Q1 2011 Q4 2011 Safety LTIFR (/200,000 hrs) rate 0.67 1.11 0.84 40% 20% SIFR (/200,000 hrs) rate 0.45 0.35 0.45 -27% 0% Production Tonnes delivered to concentrators kt 532 550 496 -3% 7% Total tonn

  39. Slide 39: Our investment case

    Slide 39: Our investment case

    Our investment case www.bafokengplatinum.co.za 38

  40. Slide 40: A compelling platinum investment

    Slide 40: A compelling platinum investment

    A compelling platinum investment • Compelling sector with strong demand and supply fundamentals • Well-established, shallow Western Limb Merensky producer with well-developed infrastructure • Competitive operating cost with scope for further cost reduction • Experienced management team with clear fo

  41. Slide 41: Contact details

    Slide 41: Contact details

    Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za www.bafokengplatinum.co

Source: company website

More decks from Royal Bafokeng Platinum Ltd