Slide 1: Condensed Consolidated Interim Results for six months ended 30 June 2020
CONDENSED CONSOLIDATED INTERIM RESULTS 20 FOR THE SIX MONTHS ENDED 30 JUNE 2020 20

Slide 2: Condensed Consolidated Interim Results
Condensed Consolidated Interim Results for the six months ended 30 June 2020

Slide 3: Contents
CONTENTS Overview Market review Operational review Financial review Outlook and guidance

Slide 4: Overview
O1 OVERVIEW NORE THAN MINING

Slide 5: Human, Financial, Manufactured and Natural capital highlights
Human Financial Manufactured Natural > 37.4% > 573.6% increase > Strong performance > Potable water cost saving > 16.7% 45 production > days lost > > R701.8 million > 12.9% decrease > RPM deferred water treated at R225 million consideration settled the BRPM plant > 10.1% increase Condensed Consolida

Slide 6: RBPlat, BRPM and Styldrift achievements and project updates
RBPlat BRPM Styldrift Achievements 2020 Project update 2020 Project update > > > > > > > Condensed Consolidated Interim Results for the six months ended 30 June 2020

Slide 7: COVID-19 awareness campaigns
1 2 3 4 5 COVID-19 NUTRITIONAL VIRAL SPREAD EDUCATION QUARANTINE, AWARENESS SUPPORT REDUCTION AND SUPPORT ISOLATION AND CAMPAIGNS CONTAINMENT TREATMENT FACILITIES Condensed Consolidated Interim Results for the six months ended 30 June 2020

Slide 8: Market Review
O02 MARKET REVIEW

Slide 9: Global platinum and palladium supply forecast
Global platinum supply forecast Global palladium supply forecast 10.0 10.0 Peak = 7.3 9.0 9.0 2.0 2.1 8.0 8.0 7.0 Peak = 6.9 7.0 1.6 6.6 6.0 2014= 4.9 6.0 5.0 5.3 5.0 2014 = 6.4 5.3 4.0 4.0 3.7 3.0 3.0 2.6 3.1 2.0 2.0 2.1 1.9 1.0 1.0 0.0 0.0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 201

Slide 10: Strong average basket price and PGM demand outlook
> Strong average basket price of R28 388.8/4E oz Indexed price (2 January 2019 = 100) – 4E Basket driven by a higher rhodium price and rand weakness 600 > Automotive demand for platinum and palladium 500 forecast to decline in 2020 > Industrial, jewellery and investment demand also 400 forecast to d

Slide 11: Operational Review
03 OPERATIONAL REVIEW

Slide 12: Growth through Styldrift supported by increased Merensky and UG2
We are committed towards Growth through Styldrift achieving sustainability through supported by increased balancing our aspirations of Merensky and UG2 responsible mining with concentrating capacity SUSTAINABLE accountability for our impacts on RESPONSIBILITY GROWTH the environment, society and the

Slide 13: Safety performance: no operational fatalities
Total recordable injury frequency rate Serious injury frequency rate Lost time injury frequency rate H1 2020 PERFORMANCE 10.000 9.267 2.000 1.843 3.000 8.643 > No operational fatalities 2.475 2.500 for the period 8.000 1.600 1.900 /1 000 000 hrs 2.000 /1 000 000 hrs 1.747 /1 000 000 hrs 6.000 5.550

Slide 14: COVID-19 preventative and supportive response
Strict screening, testing and social distancing protocols Tracking and reporting Preventative Response Supportive Response Hygiene, sanitisation, PPE, disinfection Dedicated COVID-19 treatment, quarantine and isolation facilities Optimised operating schedules and shift rotation Mine clinic and immun

Slide 15: Sustainability and community initiatives
˃ RBPlat supports all ˃ Waterkloof Hills School SDGs – prioritised and to be built over a 2 year adopted them as part of period in partnership our sustainability with the North West framework Department of Education ˃ Potable water savings ˃ R47.1 million due to treatment of invested in social and 2

Slide 16: Development, stoping and tonnes hoisted
Description Unit H1 2018 H1 2019 H1 2020 % Var Total tonnes hoisted Built-up head grade (4E) Total development km 17.0 18.9 15.0 (20.6) 2 000 5.0 BRPM BRPM BRPM SD BRPM km 13.7 15.6 12.2 (21.8) 4.17 4.11 SD 4.06 3.98 1 600 4.0 3.81 SD Styldrift km 3.3 3.3 2.8 (15.2) SD 3.36 SD 721 SD 425 850 Total s

Slide 17: Tonnes milled and 4E metals in concentrate
Description Unit H1 2018 H1 2019 H1 2020 % Var Total tonnes milled 4E metals in concentrate Total tonnes milled kt 1 529 1 869 1 623 (13.2) 2 100 250 BRPM kt 1 123 1 112 913 (17.9) 1 869 1 900 199.2 Styldrift kt 406 757 710 (6.2) 200 1 700 1 623 173.5 Merensky kt 1 314 1 610 1 319 (18.1) 1 529 164.5

Slide 18: Labour numbers and productivity
Description Unit H1 2018 H1 2019 H1 2020 % Var Capital labour 4 000 Total labour No. 8 520 9 524 10 248 (7.6) Working cost labour No. 5 627 8 522 9 033 (6.0) 3 000 2 893 BRPM No. 5 129 5 006 5 131 2.5 Number 2 000 Styldrift No. 0 2 618 3 007 14.9 1 215 1 002 Central and Shared Services No. 208 454 4

Slide 19: Group cash operating costs
Description Unit H1 2018 H1 2019 H1 2020 % Var H1 2020 Impacts Total cash operating costs R'm 1 342 2 631 2 896 (10.1) > 45 days of production Cash operating cost/tonne milled R/t 1 195 1 407 1 784 (26.8) > 480kt in milled production Cash operating cost/4E oz R/oz 10 449 13 211 16 685 (26.3) > 27.5k

Slide 20: BRPM cash operating costs
Description Unit H1 2018 H1 2019 H1 2020 % Var Cash operating cost/4E ounce 16 000 BRPM cash operating costs R'm 1 342 1 432 1 445 (0.9) 14 490 Cash operating cost/tonne milled R/t 1 195 1 288 1 582 (22.8) 12 000 11 589 10 449 Cash operating cost/4E oz R/oz 10 449 11 589 14 490 (25.0) R/4E oz 8 000

Slide 21: Styldrift cash operating costs
Cash operating cost/4E ounce Description Unit H1 2019 H1 2020 % Var 24 000 Styldrift cash operating costs R'm 1 199 1 451 (21.0) 19 649 20 000 Cash operating cost/tonne milled R/t 1 583 2 044 (29.1) 15 865 16 000 Cash operating cost/4E oz R/oz 15 865 19 649 (23.9) R/4E oz 12 000 Cash operating cost/

Slide 22: Capital expenditure
Description Unit H1 2018 H1 2019 H1 2020 % Var R113 million for H1 2020 Stay-in-business Stay-in-business capital (SIB) R'm 57 53 113 (113.2) capital > 3.9% of total operating cost SIB % of total operating costs % 4.3 2.0 3.9 (95.0) R112 million for H1 2020 Replacement capital R'm 21 6 112 (1 766.7)

Slide 23: Styldrift infrastructure progress and capital expenditure
Key infrastructure % progress Styldrift capital expenditure (R’m) Completed In Progress 14.0 13.3 Spare IMS sections Construction underway Equipped stoping sections 100% 0.4 Trackless workshops 75% 25% H1 2020 capital Capital expenditure Estimate at expenditure project to date completion Ore silos 1

Slide 24: Key drivers to meet 230ktpm steady state
Stoping square metres Stoping quality 60 Key drivers to meet 230ktpm 250 4.01 56 52 48 53 53 steady state 245 50 46 Stoping width (cm) Stoping square metres (000's) 240 40 Focus areas 235 30 230 228 > Maintain minimum of 85% trackless 225 20 fleet availability 220 10 215 0 > Maintain tip-to-face dis

Slide 25: Tailings, concentrator and conveyor projects
BRPM TSF Project studies Q4 2021 > R458 million Overland conveyor phase 2 > Completion date – Q4 2021 > Evaluate overland conveyor options > 63ha footprint increase to directly link mine sites to Maseve concentrator Maseve TSF Maseve and BRPM concentrator > R112 million > In operation optimisation >

Slide 26: Optimise volumes, contain costs and secure operational flexibility
Optimise volumes, contain costs and secure operational flexibility Operational stability Volume growth and operational flexibility > Employee and community COVID-19 support > Styldrift 230ktpm milestone > Effective testing programmes > South shaft UG2 ramp-up (diagnostic and antibody) > Maseve conce

Slide 27: Financial Review
O04 FINANCIAL REVIEW ROYAL BAFOKENG GP PLATINGM NORE THAN MINING

Slide 28: Income statement summary
6 months ended 6 months ended YoY Year ended Description Unit 30 June 2020 30 June 2019 % change 31 December 2019 Revenue R’m 4 606.0 3 163.0 45.6 7 491.9 Cost of sales R’m (3 385.3) (3 114.1) (8.7) (6 810.6) Gross profit R’m 1 220.7 48.9 2 396.3 681.3 Other income R’m 435.7 112.8 286.3 267.9 Admini

Slide 29: Headline earnings and earnings per share
6 months ended 6 months ended YoY Year ended Description Unit 30 June 2020 30 June 2019 % change 31 December 2019 Attributable comprehensive income/(loss) R’m 869.5 (164.4) 628.9 64.1 (Profit)/loss on disposal of PPE and other assets R’m (6.9) - (100.0) 0.1 Scrapping and impairment of non-financial

Slide 30: Headline earnings per share bridge
cents per share - 100.0 200.0 300.0 400.0 500.0 600.0 (200.0) (100.0) Headline earnings per share - 1H19 (70.8) Revenue - exchange rate 248.1 Revenue - metal prices Condensed Consolidated Interim Results for the six months ended 30 June 2020 313.9 Volume variance (79.1) Increase in costs - mining in

Slide 31: Revenue, basket price and contribution by metal
6 months ended 6 months ended YoY Year ended Revenue contribution Description Unit 4.2% 1.1% 30 June 2020 30 June 2019 % change 31 December 2019 0.3% 1.3% Average basket price R/Pt oz 43 681 24 694 76.9 28 743 1.6% Average basket price R/4E oz 28 389 16 024 77.2 18 668 28.1% Average R:US$ exchange r

Slide 32: Cost of sales and administrative expenses
YoY Cost of sales (excl. depreciation and 6 months ended 6 months ended Year ended amortisation) contribution Description Unit % 30 June 2020 30 June 2019 31 December 2019 change Cost of sales R’m (3 385.3) (3 114.1) (8.7) (6 810.6) 33% Cost of sales 42% R’m (3 015.3) (2 645.8) (14.0) (5 726.0) (exc

Slide 33: Operational EBITDA and segment results
Operational EBITDA (2015 to H1 2020) RBR BRPM Styldrift 2 400 Description operations mining mining segment segment segment 711.4 2 100 Six months ended 30 June 2020 R’ million R’ million R’ million 1 800 298.4 Revenue 4 606.0 2 729.6 1 876.4 1 500 R'million 1 599.3 1 559.1 Cost of sales (3 344.0) (1

Slide 34: Cash flow and net cash
6 months ended 30 6 months ended YoY Year ended Description Unit June 2020 30 June 2019 % change 31 December 2019 Cash generated by operating activities* R’m 3 861.3 160.4 2 307.3 1 027.6 - Cash generated by operations R’m 1 764.0 234.0 653.8 1 154.5 - Proceeds from streaming transaction R’m 2 093.5

Slide 35: Capital allocation framework
Our capital allocation framework is integrated into our strategy, budget, planning and management processes, and further enhanced to manage financial health and liquidity. Assessment Valuation Optimal of financial process funding risk and structure returns measure ongoing impact on: performance of:

Slide 36: Net cash, liquidity and dividend policy
> Net cash of R701.8 million at period end* • • > Strong liquidity and funding • • > Dividend policy • • • Condensed Consolidated Interim Results for the six months ended 30 June 2020

Slide 37: Transformative year and finance focus areas
> Transformative year for > Strong financial > Capital allocation to > Finance focus areas for Royal Bafokeng Platinum performance optimise returns 2020 and beyond • • • • • • • • • Condensed Consolidated Interim Results for the six months ended 30 June 2020

Slide 38: Outlook and Guidance
g O5 OUTLOOK AND ec GUIDANCE Fey. ROYAL BAFOKENG QP PLATINGM NORE THAN MINING

Slide 39: 2020 outlook and guidance
> Continued focus on keeping our people healthy and safe > Visibility of COVID-19 second half impact on operations is limited > Production is forecast to be between 3.55Mt and 3.80Mt, yielding between 380koz and 405koz 4E metals in concentrate > Forecast built-up head grade of 3.98g/t to 4.03g/t (4E
Source: Internet Archive copy of implats.co.za
More decks from Royal Bafokeng Platinum Ltd
Renaissance Capital Metals & Mining Conference 202118 slides · May 2021
Merger or Acquisition (October 2019)11 slides · Oct 16, 2019
RBPlat Analyst Roundtable 201910 slides · Aug 6, 2019
Technical Presentation (February 2019)34 slides · Feb 1, 2019
Fact Sheet (2019)11 slides · 2019
FY2017 Earnings Presentation33 slides · 2018