Slide 1: A Copper Discovery to Production Company
A Copper Discovery to Production Company
Slide 2: Forward Looking Statements
Forward Looking Statements Cautionary Notes and Forward-Looking Statements Forward Looking Statements: Forward-looking information in this presentation includes statements with respect to the the anticipated synergies between Nittetsu and Camino in respect of the Project; the equity financing; the n
Slide 3: Management & Directors
Management & Directors Christoper Adams Herculus Jacobs Justin Machin Director Director Chairman, Director Financial Leader in Debt & Equity Chief Technical Officer – Mining at Denham Managing Director at Denham Capital. M&A Capital. He has held senior roles at Anglo leader in corporate finance and
Slide 4: Our Partners
Our Partners 84-year history as a mining and trading company. Operator of the Atacama Kozan mine in Chile. Constructing the US$400M Arqueros mine in Chile. Energy and resources-focused global private equity firm. $9.7 billion of invested and committed capital. Offices in Houston, London, Boston, and
Slide 5: Camino Strategy – Cashflow and Production Re-rating
Camino Strategy – Cashflow and Production Re-rating Construct Develop Explore Grow The Puquios Copper Mine Los Chapitos Copper Project Maria Cecilia; Los Chapitos M&A Puquios; Plata Dorada Ready to construct; 50:50 with Exploring and delineating Continuing to expand portfolio of Nittetsu resource; N
Slide 6: Camino's Business Plan – a Proven Path to Investor Wealth
Camino’s Business Plan – a Proven Path to Investor Wealth Puquios Los Chapitos 6
Slide 7: Our Projects
Our Projects Maria Cecilia, Peru Copper Porphyry Complex with NI 43-101 Resource Plata Dorada, Peru High Grade Copper Silver Gold Metals Los Chapitos, Peru Exploring and Delineating IOCG-Type Resource Nittetsu 35% Earn-In Puquios, Chile Construction-Ready Copper Project, 50:50 JV with Nittetsu 7
Slide 8: Puquios Project Production in Chile
Puquios Project Production in Camino & Nittetsu 50:50 JV acquired Chile construction ready Puquios in April 2025 Low risk open pit & SX-EW operation in known Copper jurisdiction. Power sources, roads, and water infrastructure established. Primary RCA permit in place to commence production and produc
Slide 9: Production in Chile Upside Opportunities
Production in Chile Upside Opportunities 1. Receive oxide ore from local miners. 2. Use innovative leaching technology to mine deeper sulphide ore. 3. Prospective mine exploration of over 10,000 hectares. Primary sulphide mineralization: Whittle Pits and mineralized material estimate, Asgeomin (2021
Slide 10: Los Chapitos Project Peru
Los Chapitos Project Peru Camino’s Next in Line Targeted Production Asset after Puquios Discovery Drilling within a Major IOCG System Nittetsu investing $9 Million over 3 years to become 35% Partner. Nittetsu and Camino Advancing resource delineation, engineering, and development studies. • Over 26,
Slide 11: Los Chapitos Project
Los Chapitos Project Drilling Highlights - 26,425 Total Meters Drilled Diva Diana Mineralization over 600 meters strike • 25m @ 1.34 % Cu, 13.1 g/t length: Ag from surface in DCH-112 • 95.0m @ 0.85% Cu from 63.5m depth, including 6.2m @ 3.16% Cu Lourdes from 152.3m in DCH-034 • 55.5m @ 0.93% Cu from
Slide 12: Los Chapitos
Los Chapitos Multiple Mineralized Trends Diva, Atajo, La Estancia 12
Slide 13: Los Chapitos
Los Chapitos Neighbours in a Proven District • Rio Tinto: increasing claims contiguous to Camino • Mina Justa: 100,000 tpa copper metal; capital expenditure of US$1.6B. • Marcona: major iron ore mine • Pampa de Pongo (Jinzhao Mining): iron ore deposit and other mining & exploration projects Establis
Slide 14: Maria Cecilia Project
Maria Cecilia Project Existing Resource and Discovery Drilling in a Major Porphyry System • Claims cover 7,110 hectares • Porphyry complex that includes the Toropunto Epithermal deposit and the Emmanuel Porphyry deposit spanning over 5 kilometers Geological similarities to one of Peru’s largest copp
Slide 15: Capital Structure
Capital Structure Shares Outstanding 67,878,378 Camino’s Focus 2025 Warrants (@ $0.60 Exercise Price) 5,555,556 Pre-Construction Detailed Engineering Options 2,929,167 Summer & Fall 2025 Fully Diluted 76,363,101 Construction Debt & Equity Secured Decision Full Release to Construction Management & In
Slide 16: A Copper Discovery to Production Company
A Copper Discovery to Production Company TSXV: COR OTC: CAMZF caminocorp.com info@caminocorp.com 604-493-2058