Element 25 Limited · ASX:E25

Element 25 — Shareholder Meeting (June 2026)

31 slides from Element 25's shareholder meeting presentation, Jun 23, 2026

  1. Slide 1: Building a Global Manganese Business

    Building a Global Manganese Business Sustainable manganese ore and HPMSM for global steel and battery markets. Presentation – E25 Extraordinary General Meeting (23 June 2026) ASX : E25 OTCQX : ELMTF

  2. Slide 2: Disclaimer

    Disclaimer This presentation (Presentation) contains only a brief overview of Element 25 Limited and its associated entities (Element 25 or E25) and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Element 25's projects, may

  3. Slide 3: Element 25 Introduction

    Element 25 Introduction Long-Life, 100%-Owned Manganese Mine E25 Construction Ready Mine Expansion Strong Feasibility Study/Financials ELMTF ESG Leading Innovative HPMSM Flowsheet ISSUED SHARES 326M Tier 1 Jurisdiction Tier 1 Project Customers & Partners TOTAL DEBT NIL 3

  4. Slide 4: Strategic Vision to Create Shareholder Value

    Strategic Vision to Create Shareholder Value Butcherbird Expansion Louisiana HPMSM Expand Globally 1.1Mt p.a. Manganese Concentrate USA Critical Raw Materials HPMSM Expansion - EU & Asia Build and commission a large-scale processing Construct the first US HPMSM processing facility Multiple HPMSM mod

  5. Slide 5: The Butcherbird Manganese Project

    The Butcherbird Manganese Project

  6. Slide 6: Butcherbird Manganese Project, WA

    Butcherbird Manganese Project, WA World-Class Large-Scale Long-Life Mine Production Resource >18 years production >270M tonnes 1.1M tonnes per year § Unique geology - very clean metallurgically – no toxic contaminants. § Located in Australia, a Tier-1 jurisdiction with strong ESG regulation. § Produ

  7. Slide 7: Large, Long-Life Manganese Mine in the Pilbara

    Large, Long-Life Manganese Mine in the Pilbara CONSTRUCTION READY Manganese ore loadout • Granted Mining Lease during Stage 1 pilot • Fully Permitted operations. Mining Lease - M52/1074 Mining Reserve: 101.4Mt @ 10.4% Mn1 • Early Procurement Commenced • Existing infrastructure in place (bore fields,

  8. Slide 8: Simple Geology: Low-Cost, Low-Impact Operations

    Simple Geology: Low-Cost, Low-Impact Operations Classification Tonnes (Mt) Mn (%) Contained Mn (Mt) RESOURCE GROWTH POTENTIAL Resource 274 10.0 27.4 • Large resource offers long term Reserve 101.4 10.4 10.5 operating potential. • Mineralisation outside existing resource provides upside. • Ore suitab

  9. Slide 9: Butcherbird to Expand to 1.1Mt p.a. Production

    Butcherbird to Expand to 1.1Mt p.a. Production New, re-designed and expanded processing facility to optimise and scale the process. LOGWASHER Key Metrics Unit Value Ore Mined Ktpa 6,100 Concentrate Prod. Ktpa 1,100 SCREEN DMS PLANT Concentrate Grade Mn 31.6% Undiscounted AUD (pa) $70.5 Cashflow Mine

  10. Slide 10: From Design to Construction – First Process Equipment Arrives

    From Design to Construction – First Process Equipment Arrives Logwasher arrives Fremantle Ports, WA… First Main Plant Item, the Logwasher, arrives at Port of Fremantle: • The logwasher is one of three main processing sections, alongside Crushing/Screening and the Dense Media Separation (DMS) unit. •

  11. Slide 11: Butcherbird Expansion – On Track for Production in Q1 2027

    Butcherbird Expansion – On Track for Production in Q1 2027 • Detailed engineering well advanced utilizing Integrated project Team (IPT) approach. • Long lead time procurement progressed with orders placed for crusher and logwasher equipment. • Key construction and operational contracts being finalis

  12. Slide 12: Butcherbird Expansion Project Timeline Guidance

    Butcherbird Expansion Project Timeline Guidance BBX Project Plan Summary 2026 2027 Quarter 1 2 3 4 1 2 3 4 Month J F M A M J J A S O N D J F M A M J J A S O N D Major Milestones Finalise Funding Commissioning Commercial Production Major Activities All Approvals and Permitting Project Financing Detai

  13. Slide 13: The Manganese Ore Market

    The Manganese Ore Market

  14. Slide 14: Manganese Is Comparatively Abundant But Not Everywhere…

    Manganese Is Comparatively Abundant But Not Everywhere… • Manganese deposits heavily concentrated in Manganese ore global distribution: challenging jurisdictions. • Australia is the only allied country with significant manganese reserves and production. • Australian manganese production declining wi

  15. Slide 15: Butcherbird Expansion – Scale Supports Lower Cost Structure

    Butcherbird Expansion – Scale Supports Lower Cost Structure Global Production Cost Curve – US$/dmtu CIF China Butcherbird Expansion Project 2025 FS Sale Price (Yrs 1-5) (US$4.59/dmtu CIF China AISC) Long-term Average Price(44% CIF China) Woodie Woodie Current Spot Price (44% CIF China) Butcherbird E

  16. Slide 16: Butcherbird Expansion – Low Costs Underpin Strong Margins

    Butcherbird Expansion – Low Costs Underpin Strong Margins Historical Mn Ore Price Cycles – US$/dmtu CIF China 36.5% Mn Index High Grade Index (historical) (historical) BBX AISC Cost (2025 FS) BBX Sale Price 44% Index Basis (Yrs 1-5 2025 FS) Reference: Project Blue 2025 16 Reference: Company ASX Rele

  17. Slide 17: High Purity Manganese Strategy

    High Purity Manganese Strategy

  18. Slide 18: Manganese Is Abundant But Refining Capacity Is Not…

    Manganese Is Abundant But Refining Capacity Is Not… Refined battery grade manganese capacity is heavily concentrated in China. Manganese South Africa Ore China Other Refined Manganese Breaking the Chinese Supply Chain Dominance • Refined manganese (HPMSM) capacity is heavily concentrated with >95% o

  19. Slide 19: Improved, Cost-Competitive, Cleaner Process Technology

    Improved, Cost-Competitive, Cleaner Process Technology The Element 25 Process brings significant changes & improvements: E25 technology enhances ESG profile by: • Eliminating waste residues. • Eliminating toxic Reagents like fluorine. • Increased efficiency and lower costs. Fewer Reagents Lower Emis

  20. Slide 20: Global Refining Capacity in the Longer Term

    Global Refining Capacity in the Longer Term ** Flagship Louisiana HPMSM Facility: EU EU & UK policy shifts are MoU signed with Nissan • Supply chain security needs driving competing with the IRA Chemical Corporation to capital flows into US projects. for investment in battery jointly develop HPMSM •

  21. Slide 21: Manganese is a Key Raw Material in the Energy Transition

    Manganese is a Key Raw Material in the Energy Transition Battery Grade Manganese supply chains heavily concentrated in China • Battery demand is diversifying beyond EVs: Grid storage entering mass deployment, with BNEF reporting 112 GW / 307 GWh of non-pumped hydro storage additions in 2025 and fore

  22. Slide 22: Global EV Sales Outlook Remains Strong

    Global EV Sales Outlook Remains Strong Global passenger-vehicle sales by drivetrain EV market share continues to grow: • Electric vehicles to reach over 50% market penetration by 2030 according to Bloomberg NEF. • Short-term policy settings have reduced uptake in some markets but medium-term demand

  23. Slide 23: Transition to Higher Manganese Battery Cathodes

    Transition to Higher Manganese Battery Cathodes LMFP, LMR, LMNO and NMX cathode chemistries offer improved safety, higher energy density, reduced cost per kWh and greater supply chain flexibility. High Mn means reduced reliance on Ni and Co: Reduced nickel and very low to no cobalt content. Referenc

  24. Slide 24: Louisiana Battery Grade HPMSM

    Louisiana Battery Grade HPMSM

  25. Slide 25: DoE MESC Grant - Supporting Local Raw Material Supply

    DoE MESC Grant - Supporting Local Raw Material Supply Local Supply Chain Mn Ore Comminution • Process and supply chain developed to maximise U.S. industry US$166M Reductant involvement. Leach Grant • Working with partners GM and Acid Stellantis to supply low carbon HPMSM for EV batteries. Purificati

  26. Slide 26: Louisiana HPMSM Project – Strong Fundamentals

    Louisiana HPMSM Project – Strong Fundamentals Strong Project Support: Project timing under strategic review to ensure stakeholders alignment: • US$166M DoE grant funding. • Major global OEM partners. • US government critical minerals policies. The Louisiana Project is Strategic: Partners • First-of-

  27. Slide 27: Sustainable, Secure Manganese Supply

    Sustainable, Secure Manganese Supply • 18.3-Year Reserve within granted Mining Lease Long Mine Life at Butcherbird • 274Mt Resource global resource with exploration upside • Feasibility Study and project permitting complete Construction Ready • Northern Australia Infrastructure Facility (NAIF) finan

  28. Slide 28: Planned HPMSM facility in Louisiana, USA

    Planned HPMSM facility in Louisiana, USA For Illustration Purposes Only 28 *Subject to successful project financing and permitting

  29. Slide 29: Contact Details

    Contact Details Justin Brown Media Inquiries: Managing Director Nathan Ryan Email: admin@e25.com.au Email: nathan.ryan@nwrcommunications.com.au Phone: +61 (8) 6375 2525 Phone: +61 (0) 420 582 887 ASX : E25 OTCQX : ELMTF

  30. Slide 30: Butcherbird Manganese Mine - Resources & Reserves

    Butcherbird Manganese Mine - Resources & Reserves 1 Ore Reserve Deposit Classification Tonnes (Mt) Grade (Mn%) Contained Mn (Mt) • Current Reserve: Proved 11.3 11.8 1.33 Yanneri Ridge • Only utilises approximately ~40% of Probable 70.4 10.2 7.15 Coodamudgi Proved - - - global Mineral Resource; Proba

  31. Slide 31: Competent Person’s Statement

    Competent Person’s Statement The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results and Exploration

Element 25 — Shareholder Meeting (June 2026) on 6ix