Richmond Vanadium Technology Pty Ltd. · ASX:RVT
Richmond Vanadium Technology Pty — FerroAlloyNet 17th International Vanadium Products Forum 2024
51 slides from Richmond Vanadium Technology Pty's conference presentation, Mar 25, 2024
Slide 1: ASX Announcement: Corporate Presentation
ASX ANNOUNCEMENT 25/03/2024 CORPORATE PRESENTATION Richmond Vanadium Technology Limited (ASX:RVT) is pleased to provide the attached presentation which will be delivered at FerroAlloyNet’s 17th International Vanadium Products Forum being held in China 25 – 27 March 2024. FerroAlloyNet was founded in
Slide 2: New Vanadium Resource Emerging from Australia
NEW VANADIUM RESOURCE EMERGING FROM AUSTRALIA For personal use only ASX Investor :Update RVT| December 2022 | ASX:RVT FERRO.ALLOY.NET FORUM PRESENTATION MARCH 2024
Slide 3: Important Notice & Disclaimer
IMPORTANT NOTICE & DISCLAIMER IMPORTANT NOTICE AND DISCLAIMER • are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are These presentation materials and the accompanying verbal presentation (together, the Presentation Materials) have bee
Slide 4: A Better World for Our Children
A BETTER WORLD FOR OUR CHILDREN We are all human and want to leave a better world for our children. Human-induced climate change is an unprecedented challenge and a global problem like no other. For personal use only If we want to decarbonise the world, we have to work together. In 2020, President X
Slide 5: The Battery Storage Revolution
THE BATTERY STORAGE REVOLUTION The world cannot achieve its energy transition targets without utility scale, long duration battery storage. This has been demonstrated by For personal use only growing installations of gigawatt hour battery energy storage systems. The adoption of lithium-ion battery s
Slide 6: VRFBs in Operation, Under Construction, Announced
200 VRFBs IN OPERATION Dalian Rongke Power (China) 42 VRFBs UNDER CONSTRUCTION 49 VRFBs ANNOUNCED For personal use only San Diego Gas & Electric (USA) North Harbour Clean Energy (NSW) Yadlamalka (South Australia) Energy Superhub Oxford (UK) Investor Source: Vanitec 5 March Update 2024 | |ASX:RVT Dec
Slide 7: Meeting Future Vanadium Demand
MEETING FUTURE VANADIUM DEMAND Vanadium Production and Consumption 280,000 For personal use only 260,000 240,000 74,000 MTV/year in supply from new sources is required by 2030 in order to meet the 2030 demand projection, 220,000 including the Guidehouse Research forecast 200,000 for vanadium use in
Slide 8: Vanadium Supply
Australia Brazil 28.9% VANADIUM SUPPLY1 0.5% Russia World’s United States 19.6% 0.2% • Current production ~100ktpa – 90% from 4 countries Vanadium Reserves For personal use only – China, Russia, South Africa and Brazil (2022) China • Production from secondary sources 37.2% South Africa – steel slag,
Slide 9: Australian Government Support for Critical Minerals
AUSTRALIAN GOVERNMENT SUPPORT FOR CRITICAL MINERALS Prime Minister of Australia – Hon. Anthony Albanese MP1 We want to move Australia up the international value chain For personal use only in critical minerals, energy and manufacturing. And I'm pleased to announce today a doubling of our investment
Slide 10: Australian Vanadium Deposits
RICHMOND VANADIUM (oxide / soft rock) For personal use only TNG (hard rock / titanomagnetite) VELOX ENERGY (oxide / soft rock) QEM AUSTRALIAN VANADIUM (oxide / oil shale) (hard rock / titanomagnetite) MULTICOM NEOMETALS RESOURCES (hard rock / titanomagnetite) (oxide / oil shale) CRITICAL SUREFIRE RE
Slide 11: Introducing the People Who Understand China
INTRODUCING THE PEOPLE WHO UNDERSTAND CHINA The Board of Richmond Vanadium DR SHUANG (SHAUN) REN MR BRENDON GRYLLS MR JON PRICE MRS LILY ZHAO NON-EXECUTIVE DIRECTOR INDEPENDENT NON-EXECUTIVE CHAIR MANAGING DIRECTOR TECHNICAL DIRECTOR & CHIEF PROJECT ENGINEER For personal use only Born in Henan Provi
Slide 12: Corporate Snapshot
CORPORATE SNAPSHOT For personal use only CAPITAL STRUCTURE KEY SHAREHOLDERS Directors, Management RVT $15.6m $76.53m & Staff (inc assoc) 8% ASX Code Cash Market Cap (as at 31/12/2023) (as at 12/03/2024 Institutions / Corporate 15% 221.8m 13.5m 3.3m Shares Options Performance on Issue on Issue1 Right
Slide 13: Richmond Vanadium Project Overview
RICHMOND VANADIUM PROJECT OVERVIEW1 • Mining friendly jurisdiction within the North-West For personal use only Minerals Province of Queensland (Australia) • Close to major infrastructure and services • Pre-Feasibility Study completed in 2019, updated in 2021 • Bankable Feasibility Study underway for
Slide 14: Global Primary Mineral Resources
GLOBAL PRIMARY MINERAL RESOURCES Resource Tonnes Resource Grade Concentrate Grade 2000 3.00% For personal use only 1800 2.50% 1600 1400 2.00% V2O5 Grade (%) Million Tonnes (MT) 1200 1000 1.50% 800 1.00% 600 400 0.50% 200 0 0.00% Richmond Vanadium Bushveld Australian Bushveld Technology Largo Maracas
Slide 15: Simple Geology and Low-Cost Mining
SIMPLE GEOLOGY AND LOW-COST MINING1 For personal use only • Mineralisation associated with the Toolebuc formation at an average depth of 2 - 25m • Average grade based on drilling to date within the starter pit is 0.52% V2O5 with highest intercept 0.88% V2O5 over 1m) • Free dig open cut mining with v
Slide 16: Lilyvale Deposit Ore Reserve
LILYVALE DEPOSIT ORE RESERVE1 • Maiden open pit Ore Reserve at the Lilyvale Deposit of: 459.2Mt @ 0.49% for 2.25Mt V2O5 For personal use only • Two pits designed over the Lilyvale Deposit Indicated Mineral Resource: – LOM (Life of Mine) pit hosting Probable Reserves; and – STARTER pit focussed on th
Slide 17: Extensive Metallurgical Testwork
EXTENSIVE METALLURGICAL TESTWORK 1 • Key to unlocking the great potential is finding the right metallurgical solution to economically extract the vanadium from the ore. For personal use only • 5 years of metallurgical testwork conducted using expertise at Changsha Research Institute of Mining & Meta
Slide 18: Comparison of Estimated Production Cost Breakdown
COMPARISON OF ESTIMATED PRODUCTION COST BREAKDOWN Soft Oxide vs Titanomagnetite Vanadium Deposits Concentrating Recovery For personal use only to minimum 98% to meet vanadium flake standard TITANOMAGNETITE VANADIUM DEPOSIT Drill & Blast Mining Milling Concentrating Roasting Leaching Purifying ≈10% ≈
Slide 19: Mine to Metal to Battery
MINE TO METAL TO BATTERY Electrolyte For personal use only manufacture Low impact shallow mining BFS will assess In-country and offshore recovery to 99% V2O5 Townsville Conventional low-cost Battery Renewable concentrate making Energy Storage Richmond Actively seeking downstream electrolyte and batt
Slide 20: Environmental - Social - Governance
ENVIRONMENTAL - SOCIAL - GOVERNANCE Environmental Social Governance For personal use only • Environmental Impact • We serve as a catalyst • We value accountability, Statement underway – for local economic transparency, fairness and final terms issued by state development through responsibility for t
Slide 21: Investment Advantage
INVESTMENT ADVANTAGE For personal use only Location Potential Feasibility & Timing Environmental Mining-friendly jurisdiction One of the largest Regulatory approvals and of Australia, close trading undeveloped oxide Approvals underway final investment decision partner with China vanadium resources P
Slide 22: Contact Us
This presentation has been authorised for release by the CONTACT US Board of Richmond Vanadium Technology Limited For personal use only Jon Price Managing Director T: +61 8 6141 9500 E: info@richmondvanadium.com.au Dr Shuang (Shaun) Ren Non-Executive Director T: +61 8 6141 9500 E: info@richmondvanad
Slide 23: Appendices
For personal use only APPENDICES Investor Update | December 2022 | ASX:RVT
Slide 24: Appendix - Mineral Resource and Ore Reserve Estimates
APPENDIX 1 - MINERAL RESOURCE AND ORE RESERVE ESTIMATES1 Richmond – Julia Creek Project Richmond – Julia Creek Project Mineral Resource and Contained Metal (at 0.30% V2O5 cut-off) Ore Reserve (Lilyvale Deposit) For personal use only Tonnage V2O5 V2O5 Tonnage V2O5 V2O5 Deposit Category Category (MT)
Slide 25: Appendix - Summary of Key PFS Outcomes
APPENDIX 2 - SUMMARY OF KEY PFS OUTCOMES1 PFS outcome PFS outcome Sensitivity Analysis Measure US$9.60/lb V2O5 US$9.60/lb PFS outcome PFS outcome PFS outcome (Study Price) Measure V2O5 at US$7.60/lb US$8.60/lb US$10.60/lb Life of Mine (LOM) (Study Price) V2O5 V2O5 V2O5 For personal use only PFS (Ini
Slide 26: Appendix - Peer Comparison Table
APPENDIX 3 – PEER COMPARISON TABLE Resource Resource Resource Total Resource Concentrate Company Code Project Stage Grade Information Source and Notes Category Tonnes (Mt) (Mt @ V2O5 %) Grade (V2O5 %) Indicated 429.4 0.50 Richmond Richmond – 1,838Mt @ 0.36% Refer Prospectus dated 14 October 2022 and
Slide 27: 澳大利亚新兴钒资源
澳大利亚新兴钒资源 For personal use only ASX:RVT 投资者更新 | 2022年12月 | ASX:RVT FERRO.ALLOY.NET论坛演示 2024年三月
Slide 28: 重要通知和免责声明
重要通知和免责声明 重要通知和免责声明 • 这些估计和假设基于公司认为合理的一系列技术、商业、经济、竞争、政治和社会不确定性和 这些演示材料和随附的口头演示(统称为演示材料)是由Richmond Vanadium Technology Limited( contingencies; 简称RVT或公司)准备的。通过接收演示材料,您向公司承认并声明您已阅读、理解并接受本免责声 • 涉及已知和未知的风险和不确定性,可能导致实际事件或结果与此类前瞻性陈述中反映的估计或预 明的条款。 For personal use only 期事件或结果有实质性差异; 可能包括有关价格、成本、结果和资本支出的估计和假
Slide 29: 为我们的孩子创造一个更美好的世界
为我们的孩子创造一个更美好的世界 For personal use only 我们都是人类,希望为我们的孩子留下一个更美好的世界。 人为引起的气候变化是一项前所未有的挑战,是一个全球 性的问题。如果我们想要实现全球脱碳,我们必须共同努力。 2020年,习近平主席宣布中国承诺在2030年达到碳排放峰值,并在2060年实现碳中和。 中国在清洁能源方面的投资 1 超过了世界上任何其他国家。截至2023年6月,可再生能源已经取代煤炭成为中国最大的装机容量 。 1《关于中国脱碳的六个理由》一文作者是中国水风险(CWR)的刘洪桥,发表于2023年9月20日,《中国的巨大放缓》 3 投资者更新 2024年3
Slide 30: 电池储能革命
电池储能革命 没有大规模、长时间的电池储能, 世界无法实现能源转型目标。 这一 For personal use only 论断通过不断增长的千兆瓦小时电池储能系统的安装,得到证明。 目前锂离子电池储能系统在市场上占据主导地位。因为其行业接受 度高且前期成本优势,暂时成为首选的电池系统。 由于以下原因,钒液流电池的使用正在增加: • 安全问题 • 电池寿命 • 可回收性 • 能够实现更长时间的储能(+4小时)。 中国在采用钒液流电池方面处于领先地位,而世界其他地区正在逐 渐迎头赶上。 1《关于中国脱碳的六个理由》一文作者是中国水风险(CWR)的刘洪桥,发表于2023年9月20日,《中国的巨大放
Slide 31: 钒液流电池运行中、建设中、已公布
运行中:200个钒液流电池 大连融科(中国) 建设中:42个钒液流电池 已公布:49个钒液流电池 For personal use only 圣地亚哥燃气 和电力(美国) North Harbour Clean Energy (新南威尔士州) Yadlamalka (南澳大利亚) Energy Superhub Oxford(英国) 投资者更新 来源:Vanitec 5 2024年3月| 2022年12月 | ASX:RVT | ASX:RVT
Slide 32: 满足未来钒需求
满足未来钒需求 钒供应与需求 280,000 For personal use only 260,000 240,000 需要来自新矿山的每年额外74,000 MTV供应 才能满足2030年钒的需求预测 220,000 Guidehouse Research预测到2030年 200,000 用于储能的钒的使用量 MTV 180,000 160,000 140,000 120,000 100,000 80,000 2018 2019 2020 2021 2022 2023e 2024e 2025e 2026e 2027e 2028e 2029e 2030e 2023年生产量 现有资源的增加量 需
Slide 33: 钒供应
澳大利亚 巴西 钒供应1 0.5% 28.9% 俄罗斯 美国 19.6% 世界钒储量 0.2% • 当前产量约10万吨每年-90%来自4个国家 (2022年) For personal use only – 中国、俄罗斯、南非和巴西 中国 • 作为副产品生产来源 37.2% 南非 – 钢渣、石煤、飞灰 13.7% • 作为主产品生产来源 – 钒钛磁铁矿石 俄罗斯 5.0m MTV • 当前全球资源-6300万吨 • 当前全球储量-2600万吨 • 澳大利亚拥有全球第二大的钒储量,但不生产钒 美国 中国 0.045m MTV 9.5m MTV 巴西 1 参考“2023年矿物商品概要”,美国地质调
Slide 34: 澳大利亚政府支持战略矿产
澳大利亚政府支持战略矿产 For personal use only 资源部联邦部长 - 尊敬的Madeleine King议员2 钒液流电池是在澳大利亚发明的,澳大利亚的钒将在能源转型中 发挥关键作用。 钒产量在国际上高度集中,它被列入澳大利亚的关键矿产清单。 澳大利亚政府通过包括关键矿产设施和北澳基础设施基金在内的 措施支持关键矿产项目。 1 参考与澳大利亚总理安东尼·阿尔巴内斯议员的新闻发布会,2023年10月25日,华盛顿 2 参考昆士兰政府媒体声明“汤斯维尔钒电池制造业蓬勃发展”,2024年2月21日 8 投资者更新 2024年3月| 2022年12月 | ASX:RVT | ASX
Slide 35: 澳大利亚钒矿床
富蒙德钒 (氧化物/软岩) For personal use only TNG (硬岩/钒钛磁铁矿) VELOX ENERGY (氧化物/软岩) QEM AUSTRALIAN VANADIUM (氧化物/油页岩) (硬岩/钒钛磁铁矿) MULTICOM NEOMETALS RESOURCES (硬岩/钒钛磁铁矿) (氧化物/油页岩) CRITICAL SUREFIRE RESOURCES MINERALS GRP (硬岩/钒钛磁铁矿) (氧化物/油页岩) 澳大利亚钒矿床 澳大利亚拥有全球第二大的钒储量,但没有生产钒 9 投资者更新 2024年3月| 2022年12月 | ASX:RVT | A
Slide 36: 介绍理解中国的人
介绍理解中国的人 Richmond Vanadium董事会 任双奎博士 布伦登·格里尔斯先生 乔恩·普莱斯先生 赵凌丽女士 非执行董事 独立非执行主席 董事总经理 技术总监& 首席项目工程师 For personal use only 任双奎出生于河南省,他在澳大 布伦登在商界和政府的各个层面拥有广泛的 乔恩拥有布里斯班格里菲斯大学的环境科学学位, 赵凌丽出生于北京,拥有20多年的 利亚国立大学获得经济地质学博 关系和网络。 他曾担任高级内阁部长和西澳 西澳矿业学院的采矿冶金研究生学历和矿产经济学 项目管理和工程经验。 士学位,并拥有超过35年的勘探 大利亚州议会议员长达16年,代表西澳大利
Slide 37: 公司概况
公司概况 For personal use only 资本结构 主要股东 1560万澳元 7653万澳元 董事,管理层及员工 8% RVT ASX代码 现金 市值 (截至2023年12月31日) (截至12/03/2024) 机构/企业 15% 2.218亿 1350万 330万 股份 期权 绩效 已发行 已发行1 权益2 其他股东 77% 1包括650万董事期权和665万首席经理期权,全部锁定期为2年,至2024年12月13日 2包括180万董事绩效权益,锁定期为2年,至2024年12月13日 11 投资者更新 2024年3月| 2022年12月 | ASX:RVT | ASX:RVT
Slide 38: 富蒙德钒项目概述
富蒙德钒项目概述1 For personal use only • 位于昆士兰州西北矿产省的矿业友好管辖区(澳 大利亚) • 靠近重要基础设施和服务 • 2019年完成的可行性研究,2021年更新 • 银行可行性研究正在进行中,预计于2025年6月 完成 • 环境批准工作正在进行中 • 目标在2025年9月做出建设决策 1 请参阅于2022年10月14日发布的招股说明书和于2022年10月21日发布的补充招股说明书,附件2“主要PFS结果摘要”附在本演 示文稿中,并参阅ASX于2022年12月9日发布的公告“Epic被任命为交付EIS”,于2023年3月9日发布的公告“DRA Global被任
Slide 39: 全球主要矿产资源
全球主要矿产资源 资源量 资源品位 精矿品位 2000 3.00% For personal use only 1800 2.50% 1600 1400 2.00% V2O5 含量(%) 百万吨(MT) 1200 1000 1.50% 800 1.00% 600 400 0.50% 200 0 0.00% Richmond Vanadium Bushveld Australian Bushveld Technology Largo Maracas Bushveld Brits Glencore Vanadium Resources Mokopane Vanadium Vametco Metal
Slide 40: 简单地质和低成本采矿
简单地质和低成本采矿1 For personal use only • 矿化物与Toolebuc层位相关,平均深度为2-25米 • 首采坑钻探平均品位是0.52% V2O5 ,最高品位 0.88% V2O5 超一米厚 • 露天开采,剥采比极低 (0.92) • 可以较低成本去除粗粒级部分以生产高品位钒精 矿1.83% V2O5 • 废料/尾矿无毒 1 请参阅2022年10月14日的招股说明书和2022年10月21日的补充招股说明书,于2022年12月9日发布至ASX 14 投资者更新 2024年3月| 2022年12月 | ASX:RVT | ASX:RVT
Slide 41: Lilyvale矿床矿石储量
LILYVALE矿床矿石储量1 • Lilyvale矿床的初步露天矿石储量为: 4.592亿吨 @ 0.49%,含225万吨V2O5 For personal use only • 在Lilyvale矿床控制性矿产资源上设计了两个采矿坑: – LOM(矿山寿命)采矿坑承载可采储量;以及 – 首采矿坑专注于LOM采矿坑的高品位部分 • 根据2012年JORC规范,这两个采矿坑都承载了根据控制性资源设 计的可采储量。 • 超过76%的资源已升级为控制性类别 • 首采矿坑旨在在早期采矿阶段实现较低的剥离比(0.92)和较高 的矿石品位(0.52% V2O5)。 Lilyvale矿床的矿石储量 - 截
Slide 42: 完整详细的冶金试验
完整详细的冶金试验 1 • 解锁巨大潜力的关键是找到经济有效的选矿冶金解决方案,从 For personal use only 矿石中提取钒。 • 在长沙矿冶研究院、湖南有色金属研究院、北京矿冶研究总院 专业知识指导下,进行了5年的选矿冶金试验。 • 所有试验都采用了已生产的成熟技术,以降低技术风险。 • 确定了两步工艺: - 第一阶段将矿石从0.49%的采矿品位升级到1.82%的V2O5 精矿品位。 - 第二阶段通过精炼提取,生产出98%的V2O5,用于钢铁和 储能市场。 • 所生产的精矿中钙含量大大降低,使得可以采取多种下游加工 工艺。 • 实验工作为可行性研究提供了流程设计。 16 投资
Slide 43: 预估生产成本细化比较
预估生产成本细化比较 软氧化物与钒钛磁铁矿 浓缩 回收 For personal use only 达到最低98%以符合钒片标准 钒钛磁铁矿型钒矿 钻孔和爆破 采矿 磨矿 浓缩 烧结 浸出 纯化 ≈10% ≈30% ≈40% ≈20% ≈50% ≈40% ≈10% 1.4 – 1.48% 钒精矿 软氧化物型钒矿 采矿 浓缩 浸出 纯化 ≈30% ≈20% ≈40% ≈10% 否 否 否 钻孔和爆破 磨矿 烧结 1.83% +98.6% 钒精矿1 钒片1 1 请参阅2022年10月14日的招股说明书和2022年10月21日的补充招股说明书, 17 投资者更新 2024年3月| 2022年12月
Slide 44: 从矿石到电池
从矿石到电池 电解液制造 For personal use only 低影响 浅层开采 BFS将评估 国内和海外冶炼 制造99%纯度的V2O5 汤斯维尔 传统低成本选矿 电池制造 可再生能源储存 富蒙德 积极寻求下游电解液和电池制造合作伙伴 18 投资者更新 2024年3月| 2022年12月 | ASX:RVT | ASX:RVT
Slide 45: 环境 - 社会 - 治理
环境 - 社会 - 治理 For personal use only 环境 社会 治理 • 环境影响评估正在进行中 • 通过与当地社区进行公开 • 我们重视问责制、透明度 -州政府于2023年3月发布 和相互尊重的合作,我们 、公平性和对所有利益相 最终条款1 促进了当地经济发展 关者的责任 • 初步环境评估表明没有重 • 使用当地企业-土木工程、 • 昆士兰州首个被宣布为协 大环境限制,不会阻止项 住宿、服务和餐饮 调项目的重要矿产项目 目继续进行2 全球公认的世界经济论坛(WEF)采纳 ESG框架-季度报告正在进行中 1 请参阅ASX公告“发布环境影响评估条款”,2023年4月11日 19
Slide 46: 投资优势
投资优势 For personal use only 地点 潜力 可行性研究和环境批 时间 准正在进行中 澳大利亚是矿业友好的 世界上最大的未开发氧 预计将在2025年9月获 司法管辖区,与中国是 化钒资源之一,能够以 2021年完成的可行性前期研 得监管批准和最终投资 紧密的贸易伙伴 当前的处理能力支持 究 - 以每磅9.60美元的价格 决策 100年以上的钒生产1 生产V2O5,项目的NPV 项目位于靠近现有基础 预计从2026年开始, (10)为6.13亿澳元,IRR 设施的地方,包括连接 预计从2020年到2029 当前钒市场动态将因全 为38%,回收期为3.2年1 到汤斯维尔港的主要
Slide 47: 联系我们
联系我们 本演示文稿已获Richmond钒技术有限公司董事会授权发布 For personal use only 乔恩·普赖斯 董事总经理 电话:+61 8 6141 9500 邮箱:info@richmondvanadium.com.au 任双奎博士 非执行董事 电话:+61 8 6141 9500 邮箱:info@richmondvanadium.com.au www.richmondvanadium.com.au Richmond钒技术 @richvanadium 投资者更新 | 2022年12月 | ASX:RVT
Slide 48: 附录
For personal use only 附录 投资者更新 | 2022年12月 | ASX:RVT
Slide 49: 附录1 - 矿产资源和矿石储量估计
附录1 - 矿产资源和矿石储量估计1 富蒙德钒矿项目 富蒙德钒矿项目 矿产资源和含金属量(截止于0.30% V2O5) 矿石储量(Lilyvale矿床) For personal use only 吨位 V2O5 V2O5 吨位 V2O5 V2O5 矿床 分类 分类 (百万吨) (%) (百万吨) (百万吨) (%) (百万吨) Rothbury 推测 1,202 0.30 3.75 已证实 0.00 0.00 0.00 Lilyvale 控制 430 0.50 2.15 可能的 459.2 0.49 2.25 Lilyvale 推测 130 0.41 0.53 总计 459.2 0.49 2
Slide 50: 附录2 - 主要PFS结果摘要
附录2 - 主要PFS结果摘要1 PFS结果 敏感性分析 测量 钒价格为US$9.60/磅 V2O5 PFS结果 (研究价格) 测量 价格为US$9.60/磅 V2O5 PFS结果 PFS结果 PFS结果 (研究价格) 钒价格为US$7.60/磅 钒价格为US$8.60/磅 钒价格为US$10.60/磅 V2O5 V2O5 V2O5 矿山寿命(LOM) For personal use only PFS(最初25年寿命) (基于在澳大利亚进行选矿,离岸精炼) 总开采体积(Mt) 951.7 剥离比(废石:矿石) 1.07 开采矿石(Mt) 101.5 矿石品位 V2O5(%) 0.49 开采矿
Slide 51: 附录3 - 同行比较表
附录3 - 同行比较表 资源吨数 (百 资源品位 总资源量 公司 代码 项目 阶段 资源类别 浓缩品位 信息来源和注释 万吨) (V2O5 %) (百万吨 @ V2O5 %) 指示 429.4 0.50 Richmond Richmond – 1,838百万吨 @ 0.36% 请参阅于2022年10月14日发布的招股说明书和于2022年10月21日发布的补充招股说明书, ASX:RVT 开发 1.82 Vanadium Julia Creek (截止 V2O5 = 0.30%) 于2022年12月9日发布至ASX 推测 1,408.6 0.33 测定 145.5 0.72 For person
Richmond Vanadium Technology — FerroAlloyNet 17th International Vanadium Products Forum 2024 on 6ix