  2. Slide 2: Net zero future is powered by renewable energy

    | Net zero future is powered by renewable energy Global Power Capacity Trend Global Annual Power Capacity Expansion ables ables <i ewables 300 1% © Nomrerenaes cow) © Renenabs vow) 2022 2030 2050 Wind and solar met the majority of demand growth in 2022 Falling fossil generation as early as 2023 2002

  3. Slide 3: Energy storage, crucial infrastructure in transition to clean energy

    | Energy storage, crucial infrastructure in transition to clean energy End User Reducing electricity cost Reducing maximum power consumption Backup power Microgrid foaming Improving power quality Power Supply Smoothing output Curve tracking Peak shaving and voltage regulation Frequency modulation Pr

  4. Slide 4: Founded: 2008

    Founded: 2008 300+ Patent Technologies Deployed Capacity: 670MWh 50+ International Standards Employee: 600+ First industrial scale VFB plant in the world Annual Production Capacity: 300MW/1,200MWh Largest flow battery R&D center in the world Global VFB Market Share: 60%+ Global VFB Electrolyte Marke

  5. Slide 5: Application of Different Energy Storage Technologies

    Application of Different Energy Storage Technologies 77 | RKP Duration Hour 7 ty ini Pumped Hydro 8hr | 6hr | Vanadium Flow Battery 4hr -— Lead Acid oh Battery Lithium/Sodium Battery 1hr 15 mins -- Supercapacitor toms |- SMES FES | | | | | | | 1KWh 100 KWh 1 MWh 10 MWh 100 MWh 1GWh > 10 GWh Capacita

  6. Slide 6: Safe, Long Lasting

    Safe, Long Lasti @) Features High Safety Level Water-based electrolyte running at room temperature and atmospheric pressure Long Life Time 25 years operation life matches solar and wind asset Sustainable Reusable electrolyte and 100% recyclable battery material Anode: Vo?+H,0 —e sinarge ‘Discharge C

  7. Slide 7: Technical Features

    | Technical Features @ why safe @ why tong life * Water-based electrolyte running at room temperature * Stability is ensured because VFB electrodes provide and atmospheric pressure reaction interface instead of being part of the Ly . 7 . reaction during charge/discharge; * Minimized risk on battery

  8. Slide 8: Technical Features

    | Technical Features @ Why 0 degration Port ery * Reason of VFB degration: Imbalance from minor side reactions ; * Capacitance can be 100% restored online or offline by low cost chemical methods; * 100% capacity retention though life time: * Oefficiency degration through life time. @ why sustainable

  9. Slide 9: Technology Comparison

    Technology Comparison 77 | RKP 70~75% 75% 85~90% Simple and 0 risk of thermal _ Complicated with risk of runaway thermal runaway Inherently Safe Inherently Safe Potential Risks > 25 years > 40 years 7-8 years >20000 cycles _ 5000-10000 cycles Flexible Site Limitations Flexible CNY 0.40 - 0.50 / kWh

  10. Slide 10: Products and Applications

    Products and Applicatio i RKP Stable, Plug-in End User Products ra EV Charging Stations UPower Series Highly integrated cabinet battery Rated power 10 kW per unit concatenation as nec Data Energy storage duratior Centers hours able for power output under 1 MW On-Demand Safe, long lasting, Industrial

  11. Slide 11: Global Projects

    Global Projects Beijing New Energy Base Riicre Std prefecs, Saleen, Integrated Green house Project as | Dalian, Chine 2010 2GWh 6OKW/300KWh . Onhand project contract China 2011 ~ 0 4kW/S4kWh Jinfeng Tech Micro-Grid id Youyi Rd Storage project, Dalian project, Ningxia, China JA) oat ' 670MWh 2015 Wuo

  12. Slide 12: Milestone Project - Renewable Integration

    Milestone Project —- Renewable Integration 77 | RKP Woniushi Wind Farm Energy Storage Station (SMW/10MWPh, Finished in Dec 2012) Highlights iy @ More than 10 years of continuous operation © 100% capacity retention e@World’ s longest running VFB energy storage station wresry, Wind + VFB Wind"oltput V

  13. Slide 13: Milestone Project - Grid Operation

    Milestone Project - Grid Operation iW RKP Hengliu Energy Storage Station Phase 1 (100OMW/400MWAh, finished in Dec 2022) Client @ Dalian City Thermoelectric Group Project Information: @Location: Downtown Dalian @Phase 1: 100MW/400MWh (Indoor) Total: 200MW/800MWh Benefits : @ Peak shaving @ Frequency

  14. Slide 14: Milestone Project - End User

    Milestone Project — End User 77 | RKP Conch Zongyang Energy Storage Station (6MW/36MWh, finished in Dec 2022) Highlights eWorld’ s largest end-user VFB energy storage station @ Decarbonisation for cement industry Client e@ Anhui Conch Cement Corporation Project Information: @Location: Tongling, Chin

  15. Slide 15: More projects

    More projects ejia Wind Storage OMW/40 MWe Mistubishi ESS, Japat (100KW/400KWh) erdn | land ESS; Australia KW/600KWh) if ‘if Wl Gp aaoeanl ania Stor: (1MW/4MWh)