  1. Slide 1: Powering the Future – Investor Update

    POWERING THE FUTURE ASX Investor :Update RVT| August 2025 | ASX:RVT CORPORATE PRESENTATION August 2025

  2. Slide 2: Company Background

    COMPANY BACKGROUND Richmond Vanadium Technology Limited (RVT) is a 100% Australian-owned, emerging, minerals development company. RVT is currently advancing a $242.2milion1 vanadium project (Richmond – Julia Creek) in Queensland’s North-West Minerals Province (500km west of Townsville and 400km east

  3. Slide 3: RVT Board & Leadership

    RVT BOARD & LEADERSHIP Brendon Grylls Xiang (Shawn) Lin Executive Chair Non-Executive Director Brendon brings extensive relationships and networks at all levels of business and government. After Shawn holds a Bachelor of Commerce majoring in accounting and economics from Carleton 16 years as State M

  4. Slide 4: Mine to Metal to Battery

    MINE TO METAL TO BATTERY An economic analysis for beneficiation to a concentrate in Australia, and a comparison of recovery offshore in China or onshore in Australia was carried out as part of the PFS. The PFS recommended that recovery to produce V2O5 flake be carried out offshore due to lower capit

  5. Slide 5: Richmond Vanadium Project Overview

    RICHMOND VANADIUM PROJECT OVERVIEW1 • Mining friendly jurisdiction within the North-West Minerals Province of Queensland (Australia) • Close to major infrastructure and services • PFS completed in 2019, updated in 2021 • Declared a Co-ordinated Project in 2022 • BFS underway for completion in 2026 •

  6. Slide 6: Simple Geology and Low-Cost Mining

    SIMPLE GEOLOGY AND LOW-COST MINING1 • Mineralisation associated with the Toolebuc formation at an average depth of 2 - 25m • Starter pit to focus on upper mineralised zone: – highest grade based on drilling to date (0.52% V2O5) – free dig open cut mining with very low strip ratio (0.92) – amenable t

  7. Slide 7: Largest Mineral Resource of Its Kind in the World

    LARGEST MINERAL RESOURCE OF ITS KIND IN THE WORLD1 Global Mineral Resource estimate of 1.8Bt @ 0.36% for 6.65Mt V2O5 at 0.30% cut-off Ore Reserve estimate of 459Mt @ 0.49%for 2.25Mt V2O5 1 Refer Prospectus dated 14 October 2022, Section 4 and Supplementary Prospectus dated 21 October 2022 released t

  8. Slide 8: Vanadium Supply

    Australia Brazil 28.9% VANADIUM SUPPLY1 0.5% Russia World’s United States • Current production ~140ktpa – 90% from 4 countries 19.6% Vanadium 0.2% Reserves – China, Russia, South Africa and Brazil (2022) China • Production from secondary sources 37.2% South Africa – steel slag, stone coal, fly ash 1

  9. Slide 9: Meeting Future Vanadium Demand

    MEETING FUTURE VANADIUM DEMAND Vanadium Production and Consumption 280,000 260,000 240,000 74,000 MTV/year in supply from new sources is required by 2030 in order to meet the 2030 demand projection, 220,000 including the Guidehouse Research forecast 200,000 for vanadium use in energy storage MTV 180

  10. Slide 10: Multiple Processing Pathways

    MULTIPLE PROCESSING PATHWAYS Concentrating Recovery RVT PFS Flow Sheet Mining Concentrating Leaching Purifying Vanadium No No No Pentoxide Drill & Blast Milling Roasting V2O5 1.83% +98.6% vanadium concentrate1 vanadium flake1 Concentrating Electrolyte Direct Concentrate to Electrolyte Flow Sheet Min

  11. Slide 11: Vanadium Leasing Model

    VANADIUM LEASING MODEL By leasing the vanadium electrolyte, clients can access the benefits of vanadium flow batteries, including high safety, long- duration storage, and low life-cycle costs, without bearing the full upfront cost. This model addresses key challenges in vanadium electrolyte finance,

  12. Slide 12: Major Components of Battery Storage Costs

    Major Components of Battery Storage Costs CAPEX is the costs you will incur to buy, install and commission the battery safely. While CAPEX of newer technologies may be relatively high, it generally decreases over time as install base grows, supply chains expand and economies of scale are realized. C

  13. Slide 13: Vanadium Flow Batteries v Lithium-Ion Batteries

    VANADIUM FLOW BATTERIES v LITHIUM-ION BATTERIES Attribute Lithium-Ion Vanadium Flow Battery (VFB) Duration Short (<2h) Long (6–8h+) The Electrolyte Leasing Opportunity CAPEX Lower upfront Higher – but leasing model achieves parity VFB electrolyte is 32% of total VFB system cost LCOS (Global Avg.) ~$

  14. Slide 14: Multiple Processing Pathways

    MULTIPLE PROCESSING PATHWAYS Concentrating Recovery RVT PFS Flow Sheet Mining Concentrating Leaching Purifying Vanadium No No No Pentoxide Drill & Blast Milling Roasting V2O5 1.83% +98.6% vanadium concentrate1 vanadium flake1 Concentrating Electrolyte Direct Concentrate to Electrolyte Flow Sheet Min

  15. Slide 15: The Vanadium Flow Battery (VFB) Long Duration Energy Storage

    THE VANADIUM FLOW BATTERY (VFB) LONG DURATION ENERGY STORAGE (LDES) Infinite Life l High Output l Low Maintenance l Safe • PERFORMANCE: consistent output, long battery life with low electrolyte degradation & infinite life cycle. • DESIGN: efficient, scalable, stackable, virtually unlimited storage c

  16. Slide 16: Corporate Snapshot

    CORPORATE SNAPSHOT CAPITAL STRUCTURE KEY SHAREHOLDERS RVT $8.8m $13.43m 221.8m Directors, Management & Staff (inc assoc) 4.5% ASX Code Cash Market Cap Shares (as at 30/6/2025) (as at 11/8/2025) on Issue Institutions / Corporate 15% PROJECT PORTFOLIO Richmond – Julia Creek Vanadium Project The Richmo

  17. Slide 17: Chair and Director visiting site during 2023 drilling program

    (L-R) Chair, Brendon Grylls & Non-Executive Director, Dr Shaun Ren visiting site during 2023 drilling program at Lilyvale Station, Richmond Investor Update | August 2025 | ASX:RVT

  18. Slide 18: Investment Advantage

    INVESTMENT ADVANTAGE Location Potential Feasibility & Timing Environmental Mining-friendly jurisdiction One of the largest Regulatory approvals and of Australia, close trading undeveloped oxide Approvals underway final investment decision partner with China vanadium resources Pre-Feasibility Study e

  19. Slide 19: Contact Us

    CONTACT US Brendon Grylls Executive Chair Monique Stevens Company Secretary & Head of Operations T: +61 8 6141 9500 E: info@richmondvanadium.com.au www.richmondvanadium.com.au Richmond Vanadium Technology This presentation has been authorised for release by the @richvanadium Board of Richmond Vanadi

  20. Slide 20: References

    REFERENCES 1. North West Queensland vanadium project one step closer, Media Statement, The Queensland Cabinet and Ministerial Directory, QL D Government. 2. Renewable Energy Storage Roadmap, CSIRO 3. Hydrogen storage for a net-zero carbon future, The Oxford Institute for Energy Studies 4. US Departm