Pan African Resources Plc · LSE:PAF

Pan African Resources — Non-Deal Roadshow (July 2018)

30 slides from Pan African Resources's roadshow presentation, July 2018

  1. Slide 1: Pan African Resources PLC European Roadshow July 2018

    PAN AFRICAN RESOURCES PLC EUROPEAN ROADSHOW JULY 2018

  2. Slide 2: Disclaimer

    DISCLAIMER The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries or affiliated companies. This presentation has not been filed, lodged, registered or approved in any jurisdiction and recipients of this document should keep themselves informed of and comply with and

  3. Slide 3: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Statements in this report that address exploration activities, mining potential and future plans and objectives of Pan African Resources are forward-looking statements and forward-looking information that involve various risks, assumptions and uncertainties and are not sta

  4. Slide 4: Pan African Resources Overview

    PAN AFRICAN RESOURCES OVERVIEW

  5. Slide 5: Pan African Resources Overview: Background and Asset Overview

    PAN AFRICAN RESOURCES OVERVIEW Background Asset overview • South African mid-tier Gold Producer dual-listed on London’s AIM market and South Africa’s JSE (market capitalisation of ZAR3.2 billion (~USD242 million) • Quality, long-life, low-cost producing assets › Safety – LTIFR well below industry no

  6. Slide 6: Our Long-Life, Low-Cost Tailings Retreatment Operations

    OUR LONG-LIFE, LOW-COST TAILINGS RETREATMENT OPERATIONS Gold surface sources production (6 months ending 31 December) Oz AISC (USD) 60,000 800 49,937oz** 700 600 40,000 500 30,665oz* 400 21,810oz 20,389oz 300 20,000 11,710oz 200 100 0 0 H1 - 2015 H1 - 2016 H1 - 2017 H1 - 2018 Looking ahead Elikhulu

  7. Slide 7: Our Long Life, High Grade Underground Mining Operation – Barberton Mines

    OUR LONG LIFE, HIGH GRADE UNDERGROUND MINING OPERATION – BARBERTON MINES • Life of Mine: 20 years • Three operating underground mines: • Sheba Mine • Consort Mine • Fairview Mine • Birthplace of BIOX® (Biological oxidation) • Treating approximately 22,000 tons of underground ore per month • Average

  8. Slide 8: Operational Cost Comparison

    OPERATIONAL COST COMPARISON PAR lower cost operations (6 months ending 31 December 2017) Barberton BTRP ETRP Elikhulu** Total underground* All in sustaining cost (ZAR’mil) 479.7 74.2 117.4 935.9 264.6 Gold sold (kg) 863 2,368 263 371 871 All-in sustaining cost per Kg (ZAR) 556,220 282,376 316,208 30

  9. Slide 9: Differentiating Factors From Other SA Gold Mines

    DIFFERENTIATING FACTORS FROM OTHER SA GOLD MINES

  10. Slide 10: Differentiating Factors: Operational Risk Reduced via Tailings Operations

    DIFFERENTIATING FACTORS FROM OTHER SA GOLD MINES Operational risk – significantly reduced via long life, low cost tailings operations • Barberton Tailings Retreatment Plant › Initial capital outlay of ZAR326 million (~USD37 million) › Regrind mill installed to improve throughput and recoveries › LOM

  11. Slide 11: Differentiating Factors From Other SA Gold Mines - Safety

    DIFFERENTIATING FACTORS FROM OTHER SA GOLD MINES - SAFETY Accident rates compared to the South African gold mining industry Per million man hours BML LTIFR rate at 2.04 6 5 4 3 2 1 0 2013 2014 2015 2016 2017 2.74 2.97 2.29 3.50 3.51 - 5.13 4.27 4.67 5.22 4.44 PAR Lost-time injury frequency rate (LTI

  12. Slide 12: Re-established Low Cost, Sustaining and Profitable Operations

    RE-ESTABLISHED LOW COST, SUSTAINING AND PROFITABLE OPERATIONS

  13. Slide 13: Introduction: PAN Share Price Underperformance

    INTRODUCTION PAN share price underperformance as a result of operational challenges – 1 year ended 18 July 2018 Relative performance rebased to 100 160 FY17 Trading Results of AGM and Salient update dividend dates 140 Cautionary - ASA Resource Group 120 Removal of ASA Resource Group cautionary 100 F

  14. Slide 14: Cessation of High Cost and High Risk Underground Operations

    RE-ESTABLISHED LOW COST, SUSTAINING AND PROFITABLE OPERATIONS Cessation of high cost and high risk underground operations • Acquired Evander Gold Mines in 2013 from Harmony Gold • High cost due to expanded infrastructure and mining distance from the shaft • Depressed ZAR gold price for past three ye

  15. Slide 15: Remedial Action at Barberton Mines

    RE-ESTABLISHED LOW COST, SUSTAINING AND PROFITABLE OPERATIONS Remedial action at Barberton Mines • BTRP’s low recoveries - installed regrind mill to improves production to 21,000oz per annum • Underground flexibility - improved through additional development to ensure continuous availability of high

  16. Slide 16: Short Term Growth – Elikhulu

    RE-ESTABLISHED LOW COST, SUSTAINING AND PROFITABLE OPERATIONS Short term growth – Elikhulu • A near commissioned tailings plant forecast to produce 56,000 ounces per annum › Forecast capital of ZAR1.74 billion (~USD125 million) – forecasting payback of 4 years post commissioning › Real post tax IRR

  17. Slide 17: Elikhulu Progress

    RE-ESTABLISHED LOW COST, SUSTAINING AND PROFITABLE OPERATIONS Elikhulu progress 17

  18. Slide 18: Short - Medium Term Growth Prospects

    SHORT - MEDIUM TERM GROWTH PROSPECTS

  19. Slide 19: Short - Medium Term Growth Prospects: Royal Sheba Project

    SHORT - MEDIUM TERM GROWTH PROSPECTS Royal Sheba project Expansion of an previously mined orebody to produce an estimated 30,000 ounces per annum over medium term. Orebody is being accessed from 23 Level Sheba Mine development of which +/-900m has been developed and approximately 850m remains 19

  20. Slide 20: Egoli Project Overview

    SHORT - MEDIUM TERM GROWTH PROSPECTS Egoli project overview LOM Production Profile (ROM tonnes) • An orebody adjacent to Evander’s No 7 Shaft infrastructure. The Project will use the established No 7 Shaft and 50 000 metallurgical facilities, which are approximately 3km from 40 000 the shaft infrast

  21. Slide 21: Growth Prospects – Exploration Prospects

    SHORT - MEDIUM TERM GROWTH PROSPECTS – EXPLORATION PROSPECTS Short Term Exploration › Independent geological consultancy conducted a review of the group’s mining rights resulting in: – In excess of 35 targets being identified and ranked on prospectivity for exploration; – Exploration has commenced o

  22. Slide 22: Exploration Programs at Barberton Mines

    SHORT - MEDIUM TERM GROWTH PROSPECTS – EXPLORATION PROGRAMS AT BARBERTON MINES Royal Sheba (0.2Moz) New Consort (0.2Moz) Quartz Ridges (0.15Moz) PC Extension (0.1Moz) Belview BIF (0.1Moz) 3 Shaft Contorted Bar (0.1Moz) North star & Betty 50koz Gould Salvation (0.1Moz) 22

  23. Slide 23: SA Mining Environment

    SA MINING ENVIRONMENT

  24. Slide 24: SA Mining Environment

    SA MINING ENVIRONMENT • Declining production profile, increasing costs • Negative perceptions of SA mining industry › Underground mines – deep and increasingly › Safety - challenges difficult and expensive › Uncertainty around mining legislation › Declining employment numbers › Labour and community

  25. Slide 25: SA Mining Environment: Positives on South Africa

    SA MINING ENVIRONMENT Positives on South Africa • Mining safety › Between 1993 and 2016 mining fatalities reduced by 88% › Mining injuries have decreased by 9% from 2016 to 2017 Number of fatalities – SA Mining 700 600 500 400 300 200 100 0 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004

  26. Slide 26: Summarised Investment Case

    SUMMARISED INVESTMENT CASE Achievements and business prospects: • Operational challenges of 2017 financial year – remedial action achieving desired results on all fronts to re- establish sustainable operations • Cessation of Evander’s loss making underground mining production – materially reducing g

  27. Slide 27: Thank You

    THANK YOU

  28. Slide 28: Thank You Appendix

    THANK YOU APPENDIX

  29. Slide 29: Differentiating Factors - Profitability: Dividends Paid

    DIFFERENTIATING FACTORS FROM OTHER SA GOLD MINES - PROFITABILITY Dividends paid ZAR million / GBP million ZAR300.0m 350 ZAR258.0m GBP17.1m ZAR240.3m 300 GBP14.7m GBP14.3m ZAR210.0m ZAR185.0m 250 GBP9.7m GBP10.0m 200 150 100 50 0 2013 2014 2015 2016 2017 Headline earnings per share ZAR cents / GBP pe

  30. Slide 30: PAR's Well Established Track Record

    PAR’S WELL ESTABLISHED TRACK RECORD PAR historic dividend yield relative to market 1.4x 6% 1.2x 5% 1.0x 4% 0.8x Dividend yield Payout ratio 2.8% 3% 0.6x 0.59x 2.0% 2% 0.4x 1% 0.2x 1.4% 1.4% 1.1% 1.4% 1.1% 1.8% 4.1% 5.4% 1.2% 1.5% 0.8% 2.3% 4.0% 5.6% 3.2% 1.3% 3.1% 0.0x 0% Newmont AngloGold Ashanti N

Pan African Resources — Non-Deal Roadshow (July 2018) on 6ix