  1. Slide 1: FY26H1 Interim Results Presentation

    FY26H1 INTERIM RESULTS PRESENTATION MINING FOR A FUTURE for the six months ended 31 December 2025

  2. Slide 2: Disclaimer

    DISCLAIMER The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries or affiliated companies. This presentation has not been filed, lodged, registered or approved in any jurisdiction and recipients of this document should keep themselves informed of and comply with and

  3. Slide 3: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Statements in this presentation that address exploration activities, mining potential and future plans and objectives of Pan African Resources are forward-looking statements and forward-looking information that involve various risks, assumptions and uncertainties and are n

  4. Slide 4: Overview of Presentation

    OVERVIEW OF PRESENTATION Health and safety Group overview Our operating environment Key features Performance by operation Group AISC Capital projects Organic growth projects ESG: Our “Beyond compliance” approach FY26H1 Financials FY26 Focused on delivery Appendix LSE: PAF | JSE: PAN | OTCQX: PAFRF/P

  5. Slide 5: Health and Safety

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix HEALTH AND SAFETY

  6. Slide 6: Health and Safety

    HEALTH AND SAFETY HEALTH AND SAFETY FY26H1 GROUP SAFETY PERFORMANCE The Group has delivered sustained improvements in safety performance Ongoing safety focus across all operations across all operations, maintaining its leading position within the South African gold mining sector Safety milestones ac

  7. Slide 7: Group Overview

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix GROUP OVERVIEW

  8. Slide 8: Investment Highlights

    GROUP OVERVIEW INVESTMENT HIGHLIGHTS MOVED FROM AIM TO THE MAIN MARKET OF THE LSE AND INCLUSION IN FTSE250 Diversified portfolio of producing gold assets located in two major global mining jurisdictions (South Africa and Australia) Growing production closer to 300koz from a high-margin operating bas

  9. Slide 9: Corporate Snapshot

    GROUP OVERVIEW CORPORATE SNAPSHOT Share price performance Capital structure2 (share price 31 January 2026) JSE: PAN (ZAR) cps (ZAR) 2,922 PAN JSE share price vs Gold price : January 2009=100 LSE: PAF (GBP) pps (GBP) 132.2 Shares issued m 2,334 8,000 7,000 PAN +75X Market capitalisation US$m 4,191 Ne

  10. Slide 10: Group Overview

    GROUP OVERVIEW GROUP OVERVIEW A UNIQUE COMBINATION OF UNDERGROUND AND SURFACE MINING OPERATIONS GROUP OPERATIONS Tennant Mines South Africa Further near-term, low-cost production growth Australia Tennant Mines LSE: PAF | JSE: PAN | OTCQX: PAFRF/PAFRY www.panafricanresources.com 10

  11. Slide 11: Production Profile

    GROUP OVERVIEW PRODUCTION PROFILE GROWING GOLD PRODUCTION BY MORE THAN 40% WITHIN ONE YEAR $1,820/oz to $1,261/oz $1,259/oz $1,309/oz $1,354/oz $1,600/oz $1,870/oz1 300 275-292koz ~35% production from surface 46-50koz 250 197koz Gold production (koz) 202koz 206koz 1.5koz 48-52koz AISC ~$1,637/oz ~60

  12. Slide 12: Operational Snapshot

    GROUP OVERVIEW OPERATIONAL SNAPSHOT 60% of production 40% of production Shallow underground and Low-cost surface tailings – environmental clean-up and rehab benefits High-grade, long-life underground mines Surface / UG Surface Underground Asset Tennant Mines MTR Elikhulu BTRP Evander Barberton Locat

  13. Slide 13: Our Operating Environment

    GROUP OVERVIEW OUR OPERATING ENVIRONMENT 140 YEAR TRACK RECORD OF OPERATING SUCCESSFULLY IN SOUTH AFRICA ELECTRICITY ELECTRICITYAND ANDSA RENEWABLE REGULATORY ELECTRICITY AND SA REGULATORY REGULATORY ELECTRICITY FRAMEWORK, AND SA REGULATORY SECURITY AND STAKEHOLDER ENGAGEMENT FRAMEWORK ENERGY FRAMEW

  14. Slide 14: Key Features

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix GROUP OVERVIEW Key

  15. Slide 15: FY26H1 Key Features

    KEY FEATURES FY26H1 KEY FEATURES OPERATIONAL AND FINANCIAL PERFORMANCE ELECTRICITY AND SA REGULATORY ELECTRICITY AND SA REGULATORY ELECTRICITY AND SA REGULATORY PRODUCTION PERFORMANCE COST PERFORMANCE FINANCIAL PERFORMANCE FRAMEWORK FRAMEWORK FRAMEWORK Group gold production of 128,296oz 52% Group A

  16. Slide 16: Gold Price Received and Margins

    KEY FEATURES GOLD PRICE RECEIVED AND MARGINS PROFITABILITY DRIVEN BY ZAR/KG GOLD PRICE AND COMPETITIVE UNIT COSTS PROFITABILITY GAP WIDENING ELECTRICITY AND SA REGULATORY AS ANNUAL PRODUCTION RAMPS Gold price received vs AISC FRAMEWORK UP CLOSER TO ~300KOZ in FY26 R/kg • Well-positioned to capitalis

  17. Slide 17: Performance by Operation

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix GROUP OVERVIEW Perf

  18. Slide 18: Tailings Retreatment and Surface Business

    PERFORMANCE BY OPERATION TAILINGS RETREATMENT AND SURFACE BUSINESS PROVEN TRACK RECORD OF DELIVERING NEW GOLD PRODUCTION ON BUDGET AND ON SCHEDULE 2013 2015 2018 2024 2025 BTRP ETRP Elikhulu MTR Tennant Mines Stage 1 Nobles Project Capacity (per month) 100kt 200kt 1.2Mt 0.8-1.1Mt 70kt Production (pe

  19. Slide 19: Tailings Operations – Elikhulu

    PERFORMANCE BY OPERATION PERFORMANCE BY OPERATION TAILINGS OPERATIONS – ELIKHULU • Production  15% in FY26H1 at 29,450oz (FY25H1: 25,725oz) • Water treatment plant expansion in progress – • Consistent head grade (>0.3g/t) and metallurgical recoveries maintained • Substantial water cost savings • In

  20. Slide 20: Tailings Operations – BTRP and Sheba Fault

    PERFORMANCE BY OPERATION PERFORMANCE BY OPERATION TAILINGS OPERATIONS – BTRP AND SHEBA FAULT • Production stable at 7,143oz (FY25H1: 7,544oz) BTRP life-of-mine plan – new surface sources • Increase in production cost as anticipated as residual material retreated 60,000 • AISC of US$1,484/oz (FY25H1:

  21. Slide 21: Mogale Tailings Retreatment (MTR)

    PERFORMANCE BY OPERATION PERFORMANCE BY OPERATION MOGALE TAILINGS RETREATMENT (MTR) • Successfully commissioned in October 2024 • Ahead of schedule and US$8m below budget • Payback expected within 2 years post commissioning at current gold prices • Produced 21,729oz in FY26H1 (FY25: 30,806oz) at an

  22. Slide 22: Mogale Socio-Economic Development and Environmental Rehabilitation

    PERFORMANCE BY OPERATION PERFORMANCE BY OPERATION MOGALE SOCIO-ECONOMIC DEVELOPMENT AND ENVIRONMENTAL REHABILITATION History >100 years of underground mining in the West Rand region of the Wits Basin • Production of over 2,000 tons of gold and 240Mt of low-grade gold-bearing tailings material in num

  23. Slide 23: Tennant Mines

    PERFORMANCE BY OPERATION – TENNANT MINES TENNANT MINES NEAR TERM GOLD PRODUCTION GROWTH IN AUSTRALIA TENNANT CREEK MINERAL FIELD Major historical province Long mine life Historically Australia’s highest- Nobles initial 8-year LOM, with grade gold province strategy to expand to >15 years Stage 1: Nob

  24. Slide 24: Australian Operations – Tennant Mines

    PERFORMANCE BY OPERATION PERFORMANCE BY OPERATION AUSTRALIAN OPERATIONS – TENNANT MINES • Nobles plant construction completed April 2025, first gold pour May 2025 • Completed ahead of schedule and within budget • Achieved nameplate capacity of 70ktpm during July 2025 • FY26H1 production commendable

  25. Slide 25: Performance by Operation – Underground

    1. Health and safety 2. Group overview UNDERGROUND OPERATIONS 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY25 Financials 5. FY26 Focused on delivery 6. Appendi

  26. Slide 26: Evander Underground

    PERFORMANCE BY OPERATION – UNDERGROUND PERFORMANCE BY OPERATION EVANDER UNDERGROUND EVANDER 8 SHAFT • Production  87% to 21,640oz (FY25H1: 11,551oz) • Recovered grade of 9.69g/t (FY25H1: 5.74g/t) • AISC reduced to US$1,576/oz (FY25H1: US$2,153/oz) • Increased gold production positively impacts unit

  27. Slide 27: Fairview Mine

    PERFORMANCE BY OPERATION – UNDERGROUND PERFORMANCE BY OPERATION FAIRVIEW MINE Gold production  10% to 20,977oz (FY25H1: 19,095oz) FY26H1 production and costs improved following: • Mining of high-grade ore from the MRC and Rossiter orebodies • 3 Shaft winder upgrade completed, which improves ore tra

  28. Slide 28: Barberton Mines' Smaller Underground Operations

    PERFORMANCE BY OPERATION – UNDERGROUND PERFORMANCE BY OPERATION BARBERTON MINES’ SMALLER UNDERGROUND OPERATIONS CONSORT MINE Gold production  20% to 3,884oz (FY25H1: 3,243oz) • Rehabilitation of PC Shaft infrastructure completed • Allows access to higher-grade areas below 30 Level • Mining commence

  29. Slide 29: Group AISC

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix GROUP OVERVIEW Grou

  30. Slide 30: Group AISC

    GROUP AISC GROUP AISC GUIDING AISC OF US$1,820/oz – US$1,870/oz IN FY2026* Lower cost operations Barberton Total lower Evander Mines’ Tennant cost % Group Elikhulu BTRP MTR underground Fairview Mines operations production AISC per kg 675,221 828,894 880,538 880,103 1,209,004 1,419,945 949,123 (ZAR/k

  31. Slide 31: Group AISC – FY2026 AISC Outlook

    US$/oz GROUP AISC 1,000 0 3,000 500 2,000 2,500 1,500 Endeavour Mining B2Gold Corp GROUP AISC LSE: PAF | JSE: PAN | OTCQX: PAFRF/PAFRY Alamos Gold FY 2026 – AISC OUTLOOK Wesdome Gold Eldorado Gold Barrick Perseus Mining Gold Fields - Group PAR - lower cost operations Source: BMO Capital Markets ‘The

  32. Slide 32: Capital Projects

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 3. ESG: Our “Beyond compliance” approach 4. FY25 Financials 5. FY26 Focused on delivery 6. Appendix GROUP OVERVIEW Capital projects

  33. Slide 33: Capital Projects (USD)

    CAPITAL PROJECTS CAPITAL PROJECTS (USD) INVESTMENT IN ORGANIC GROWTH – MAINTAINING OUR FUTURE PRODUCTION GROWTH TRAJECTORY US$107m US$161m US$167m US$156m US$267m 300 250 200 150 US$m 100 50 0 2023 2024 2025 2026* 2027# Tennant Mines 37 31 107 MTR Project 9 69 53 20 43 Elikhulu 17 16 7 23 7 Evander

  34. Slide 34: Organic Growth Projects

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix GROUP OVERVIEW Orga

  35. Slide 35: Soweto Tailings Retreatment (STR)

    ORGANIC GROWTH PROJECTS SOWETO TAILINGS RETREATMENT (STR) REMINING SOWETO CLUSTER TSFs Feasibility study completed in November 2025 for an integrated operation to treat Soweto Cluster TSFs • >108Mt of Mineral Reserves to be treated through the new processing facility, with an additional 25Mt availab

  36. Slide 36: Tennant Mines – Warrego Gold and Copper Project

    ORGANIC GROWTH PROJECTS TENNANT MINES WARREGO GOLD AND COPPER PROJECT Organic growth through Targeted exploration spend A number of near-term Consolidate stranded third- leveraging existing asset over next 2 years to increase prospects to drive further party resources and regional portfolio Mineral

  37. Slide 37: Tennant Mines – Warrego Gold and Copper Project

    ORGANIC GROWTH PROJECTS TENNANT MINES - WARREGO GOLD AND COPPER PROJECT ORGANIC GROWTH AT TENNANT CREEK, AUSTRALIA • Pan African controls 1,700km2 of highly prospective ground in NT, Australia • 100% owned assets and JV agreements with ERM • Experienced in-country management team in place • Hub and

  38. Slide 38: Evander Mines – Poplar Project

    ORGANIC GROWTH PROJECTS EVANDER MINES – POPLAR PROJECT UNMINED SHALLOW UNDERGROUND MINERAL RESOURCE POPLAR PROJECT • One of the largest unmined Mineral Resources within the Witwatersrand Basin • Estimated Mineral Resource 28.7 Mt at 6.99g/t for 6.46Moz gold • Located within current PAR Mining Right

  39. Slide 39: ESG: Our "Beyond Compliance" Approach

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix ESG Our “Beyond com

  40. Slide 40: ESG: Our "Beyond Compliance" Approach

    ESG: OUR “BEYOND COMPLIANCE” APPROACH ESG: OUR “BEYOND COMPLIANCE” APPROACH GOVERNANCE ENVIRONMENT SOCIAL SOCIAL AND COMPLIANCE SOCIAL SOCIAL RENEWABLE ENERGY PROJECTS STAKEHOLDER ENGAGEMENT SUSTAINABLE COMMUNITIES COMPLIANT WITH GRI REPORTING • Operating solar plants in Barberton • Engagement forum

  41. Slide 41: Our Operating Environment – Renewable Energy Roadmap

    ESG: OUR “BEYOND COMPLIANCE” APPROACH OUR OPERATING ENVIRONMENT OPERATING SUCCESSFULLY IN SOUTH AFRICA – RENEWABLE ENERGY ROADMAP Current Operations and Pipeline of Group Renewable Energy Projects We are committed to achieving a 15% renewable energy mix by 2027, in compliance with our SLBF framework

  42. Slide 42: FY26H1 Financials

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 - Focused on delivery 6. Appendix FY25 FINANCIALS

  43. Slide 43: FY26H1 Financials – Summarised Consolidated Results

    FY26H1 FINANCIALS FY26H1 FINANCIALS SUMMARISED CONSOLIDATED FINANCIAL RESULTS Six months ended Six months ended Movement Salient features Units 31 December 2025 31 December 2024 % change Gold produced oz 128,296 84,705 51.5 Gold sold oz 127,296 79,926 59.3 Revenue US$ million 487.1 189.3 157.3 US$/o

  44. Slide 44: Contractual and Anticipated Debt Redemption Profiles

    FY26H1 FINANCIALS FY26H1 FINANCIALS CONTRACTUAL AND ANTICIPATED DEBT REDEMPTION PROFILES Group Net Senior Debt Profile 0 Dec-2024 Feb-2025 Apr-2025 Jun-2025 Aug-2025 Oct-2025 Dec-2025 Feb-2026 Apr-2026 Jun-2026 Aug-2026 Oct-2026 Dec-2026 -50,000,000 -100,000,000 US$ -150,000,000 -200,000,000 -250,00

  45. Slide 45: Dividends and Shareholder Returns

    FY26H1 FINANCIALS FY26H1 FINANCIALS DIVIDENDS AND SHAREHOLDER RETURNS Historic dividends – record of sector-leading returns to shareholders Maiden interim dividend of ZAR 280million for FY26H1 1,000,000,000 40 900,000,000 35 800,000,000 30 700,000,000 25 Cents per share 600,000,000 ZARm 500,000,000

  46. Slide 46: FY26 – Focused on Delivery

    1. Health and safety 2. Group overview 2.1 Our operating environment 2.2 Key features 2.3 Performance by operation 2.4 Group AISC 2.5 Capital projects 2.6 Organic growth projects 3. ESG: Our “Beyond compliance” approach 4. FY26H1 Financials 5. FY26 Focused on delivery 6. Appendix FY26 - FOCUSED ON D

  47. Slide 47: FY26: Focused on Delivery

    FY26 – FOCUSED ON DELIVERY FY26: FOCUSED ON DELIVERY KEY DELIVERABLES INCLUDE ✓ Continue with focus on health and safety initiatives in our proactive journey to ‘zero harm’ ✓ Focus on achieving production and cost guidance ✓ Execute capital projects designed to sustain and increase future gold produ

  48. Slide 48: Contact Details

    Contact Details: Hethen Hira Head of Investor Relations Phone: + 27 11 243 2900 Email: hhira@paf.co.za www.panafricanresources.com LSE: PAF | JSE: PAN | OTCQX: PAFRF/PAFRY www.panafricanresources.com 48