Slide 1: 08 and 09 Line Static Wire Replacement Project
08 and 09 Line Static Wire Replacement Project May 2011
Slide 2: Project Background
Project Background • December 2008 – Ice storm impacts MA and NH • April 2009 – Unitil retains TRC to conduct FG&E sub‐ transmission review • November 2009 – MA DPU orders sub‐transmission report submittal with recommendations • December 2009 – Unitil submits report with nine recommendations from TR
Slide 3: Static Wire
Static Wire • The topmost wire of a sub‐transmission line • Connected either to the grounding conductor or directly to ground • Directs surges from lightning strikes to ground and away from conductors • Shorter useful lifespan than conductor
Slide 4: Sub-transmission System
Sub‐transmission System • Regional transmission system connection in Fitchburg • Four municipalities supplied • Eight 69 kV lines • About 40 line miles • 13 substations
Slide 5: Line Construction (Typical)
Line Construction (Typical) • Single, wood pole • 50‐80 feet high • Horizontal post construction • Three posts (line insulators) per pole • Three phases per pole – alternating sides • Pole ground and insulating rods
Slide 6: Line View (Typical)
LINE 8 STR. #37 LINE 9 STR. #37 Unitil
Slide 7: Project Statistics
Project Statistics 7 7 Line ROW - Pole Guy Wetlands Water = Municipality i Line | Miles | Acres | Structses | Replace | Replace Crossings Fitchbu 1g 08 0.89 16.10 14 0 3 1 3 0 0 09 0.89 15 0 2 Lunenbu ‘ 7 19 08 5.18 7197 19.17 70 0 6 4 4 2 0 0 0 0 09" 5.01 22.35 84 2 0 0 1 0 08 Tap 1.13 20.84 17 1 5
Slide 8: Sensitive Receptors
Sensitive Receptors • Potential Vernal Pool • Priority Habitat • PH 1477 ‐ Squannassit Area of Critical Concern • Wetlands • Deep marshes • Shallow marshes/fens • Wooded swamp (coniferous and deciduous) • Water • Streams (multiple) • Bixby Reservoir
Slide 9: Best Management Practices
Best Management Practices • Swamp mats used to cross wetlands • Swamp mats used to bridge brooks and small streams
Slide 10: Best Management Practices (continued)
Best Management Practices (continued) • Wide‐tracked vehicle (digger) positioned atop swamp mats and wide‐ wheeled ATV • Wide‐tracked vehicles (bucket and excavator) atop swamps mats
Slide 11: Best Management Practices (continued)
Best Management Practices (continued) • Rut leveling and mulching on ROW access road • Gravel pad for road turn‐ out transition onto ROW access road