Strickland Metals Ltd · ASX:STK

Strickland Metals — North American Conference Presentation September 2025

25 slides from Strickland Metals's conference presentation, Sep 9, 2025

  1. Slide 1: Growing Rogozna Into A Tier One Gold Project

    For personal use only Growing Rogozna Into A Tier One Gold Project North American Conference Presentation September 2025 ASX Code: STK

  2. Slide 2: Disclaimer

    Disclaimer The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing and all other documents provided to you by the Strickland Metals Limited (Company). The Information is current as at the date of its release and the Compa

  3. Slide 3: Strickland Metals – A Rare Opportunity

    Strickland Metals – A Rare Opportunity ASX/TSX Listed Gold Development Projects* Significant Scale 7.4Moz AuEq1 Rogozna Gold For personal use only 14 TSX and Base Metals Project in Serbia. ASX 12 Solid Foundations $A328M ($US216M) market cap. 10 Contained Metal (AuEq Moz)* 8 Balance Sheet Strength $

  4. Slide 4: Corporate Overview

    Corporate Overview Board Capital Structure - ASX Ticker STK (as of 5 September 2025) For personal use only Anthony McClure Non-Executive Chairman Shares on issue 2,262,359,797 Paul L’Herpiniere Managing Director Performance rights (20c, 30c, 50c) 99,300,000 Options (13.5c) 50,000,000 Richard Pugh No

  5. Slide 5: Rogozna – In the Land of Giants

    Rogozna – In the Land of Giants Highly prospective geology For personal use only Western Tethyan Belt with multiple giant porphyry-related deposits. Major miners active in-country Zijin, Rio Tinto, BHP and Dundee Precious Metals. Mining in Serbia 2.5% of GDP, strategy to increase to 10%. Europe’s 2n

  6. Slide 6: Rogozna Overview

    Rogozna Overview A massive magmatic mineral system with ~184 km2 of tenure. For personal use only Four skarn-hosted gold + base metal deposits defined by >120km of drilling. 199Mt @ 1.2g/t AuEq for 7.4Moz AuEq Inferred Resources1 for three of the four deposits. Located in the heart of one of Europe’

  7. Slide 7: 2025 Exploration Overview

    2025 Exploration Overview 50,000m diamond drilling planned; For personal use only • ~26,000m completed to date. Focus – Grow the 7.4Moz AuEq Resource1 and Make Discoveries • Extend and infill to support maiden Gradina MRE. • Grow and improve the definition of Shanac higher-grade zones. • Scope out t

  8. Slide 8: Shanac Deposit – 5.3Moz AuEq and Growing

    Shanac Deposit – 5.3Moz AuEq and Growing 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources1 For personal use only • Includes 32Mt @ 1.8g/t AuEq for 1.85Moz AuEq (>1.2g/t AuEq cut-off grade). 2025 Drilling Highlights2 • 172.5m @ 1.3g/t AuEq from 322.6m (ZRSD25199), incl. 58.5m @ 2.7g/

  9. Slide 9: Shanac Deposit – 5.3Moz AuEq and Growing

    Shanac Deposit – 5.3Moz AuEq and Growing 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources1 For personal use only • Includes 32Mt @ 1.8g/t AuEq for 1.85Moz AuEq (>1.2g/t AuEq cut-off grade). 2025 Drilling Highlights2 • 172.5m @ 1.3g/t AuEq from 322.6m (ZRSD25199), incl. 58.5m @ 2.7g/

  10. Slide 10: Gradina Deposit – High Grade, Gold-Dominant System

    Gradina Deposit – High Grade, Gold-Dominant System 2025 Drilling Highlights1 For personal use only • 62.7m @ 3.5g/t Au from 386.0m incl. 27.8m @ 6.3g/t Au from 388.0m (ZRSD25182). • 19.6m @ 7.0g/t Au from 377.0m (ZRSD25190). • 34.4m @ 2.6g/t Au from 329.5m incl. 14.5m @ 4.4g/t Au from 332.1m (ZRSD25

  11. Slide 11: Gradina Deposit – Multiple High-Grade Gold Lodes

    Gradina Deposit – Multiple High-Grade Gold Lodes Drill-defined over ~1km strike, open in all directions with maiden MRE due late-2025. For personal use only Gradina North cross section view looking north Gradina long section view looking SW 11

  12. Slide 12: Medenovac Deposit – Structurally Controlled High Grade Core

    Medenovac Deposit – Structurally Controlled High Grade Core 21Mt @ 1.9g/t AuEq for 1.28Moz AuEq JORC 2012 For personal use only Inferred Resources1 . • 6,800 AuEq OPVM over 150m vertical extent. • Constrained by sub-level cave stopes @ $2,250/oz. • Mineralisation remains open to the north and at dep

  13. Slide 13: Kotlovi Prospect – An Emerging Discovery

    Kotlovi Prospect – An Emerging Discovery Significant new discovery with scale potential just For personal use only 350m west of Medenovac. • 277.3m @ 1.3g/t AuEq from 337.4m (ZRSD25189)1, incl. • 163.0m @ 1.4g/t Au from 337.4m, incl. • 33.5m @ 2.9g/t Au from 339.4m, and • 2.0m @ 15.3g/t Au from 370.

  14. Slide 14: Copper Canyon Deposit – Outcropping Copper-Gold

    Copper Canyon Deposit – Outcropping Copper-Gold 28Mt @ 0.9g/t AuEq for 0.81Moz Au Eq For personal use only JORC 2012 Inferred Resources1 • Constrained by open-pit shell @ $US 2000/oz, 0.4g/t AuEq cut-off, 2.2:1 strip ratio. • ~50m-thick, higher-grade Copper-Gold zone surrounded by lower-grade halo.

  15. Slide 15: Porphyry Exploration

    Porphyry Exploration Skarn systems the scale of Rogozna often For personal use only have a mineralised porphyry in proximity. Porphyry-related alteration and mineralisation confirmed at Jezerska Reka1: Central Porphyry • 493.0m @ 0.1g/t Au from 223.6m (ZRJD24002) Target Area Two rigs focused on test

  16. Slide 16: Key Deliverables for 2025

    Key Deliverables for 2025 50,000m Resource and Discovery Drilling at Rogozna For personal use only Feb 2025 March 2025 Late March 2025 April 2025 1.28Moz AuEq Resource Drilling 5.3Moz AuEq Discovery Drilling 24,000m diamond drilling to late 2025 Maiden Commencement Shanac MRE Commencement Strong reg

  17. Slide 17: Sustainability

    Sustainability Zlatna Reka Resources - Strickland Metals’ 100%-owned Serbian subsidiary For personal use only 55 permanent employees = >100% increase over 12 months; • 60% from local communities. • 31% Female = >50% increase over 12 months. • 20% of workforce focused on community, environment and cu

  18. Slide 18: Strickland Metals - Primed for Growth

    Strickland Metals - Primed for Growth Significant Scale 7.4Moz AuEq1 Rogozna Gold and Rogozna Resource Growth1 For personal use only Base Metals Project in Serbia. 9 Medenovac Maiden 8 Shanac Gradina MRE + Solid Foundations $A328M ($US216M) market cap. Copper Canyon Shanac MRE 7 update Contained Met

  19. Slide 19: Appendix 1: Rogozna Inferred Mineral Resource Estimates

    Appendix 1: Rogozna Inferred Mineral Resource Estimates Tonnes AuEq Au Cu Ag Pb Zn AuEq Au Cu Ag Pb Zn Prospect For personal use only (Mt) (g/t) (g/t) (%) (g/t) (%) (%) (Moz) (Moz) (kt) (Moz) (kt) (kt) Medenovac (February 21 1.9 0.77 0.27 6.3 0.11 1.54 1.28 0.52 57 4.3 23 320 2025)A Shanac (March 15

  20. Slide 20: Appendix 2: Junior listed ASX Gold Project Summary

    Appendix 2: Junior listed ASX Gold Project Summary Reported JORC 2012 Resource Gold Grade Copper Lead Grade Zinc Grade Silver Grade AuEq Grade Contained For personal use only Project Company Exchange Development Stage Tonnes (Mt) Source (g/t) Grade (%) (%) (%) (g/t) (g/t) AuEq (Moz) El Guayabo Chall

  21. Slide 21: Appendix 3: ASX Gold Project Resources

    Appendix 3: ASX Gold Project Resources Measured Indicated Inferred Total Gold Grade Contained Gold Grade Contained Gold Grade Contained Gold Grade Contained For personal use only Project Company Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t)

  22. Slide 22: Appendix 4: Junior listed TSX Gold Project Summary

    Appendix 4: Junior listed TSX Gold Project Summary Reported NI 43-101 Resource Copper Lead Zinc Contained Gold Silver Grade AuEq Grade For personal use only Project Company Exchange Development Stage Tonnes (Mt) Grade Grade Grade AuEq Source Grade (g/t) (g/t) (g/t) (%) (%) (%) (Moz) Titiribi GoldMin

  23. Slide 23: Appendix 5: TSX Gold Project Resources

    Appendix 5: TSX Gold Project Resources Measured Indicated Inferred Total Gold Grade Contained Gold Grade Contained Gold Grade Contained Gold Grade Contained For personal use only Project Company Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t)

  24. Slide 24: Disclaimer – Gold Equivalent Calculations

    Disclaimer Gold Equivalent Calculations (Rogozna Project) Gold Equivalent calculations for exploration results withing this presentation are based on the following metal prices; For personal use only For Shanac, Medenovac and Kotlovi (US$2,250/oz), copper (US$10,000/t), silver (US$25/oz), lead (US$2

  25. Slide 25: Paul L’Herpiniere, Managing Director

    For personal use only Paul L’Herpiniere, Managing Director info@stricklandmetals.com.au +61 8 6317 9875

Strickland Metals — North American Conference Presentation September 2025 on 6ix