Strickland Metals Ltd · ASX:STK

Strickland Metals — Investor Presentation (February 2026)

29 slides from Strickland Metals's investor presentation, Feb 16, 2026

  1. Slide 1: Growing Rogozna Into A Tier One Gold Project

    Growing Rogozna Into A Tier One Gold Project Corporate Presentation February 2026 ASX Code: STK

  2. Slide 2: Disclaimer

    Disclaimer The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing and all other documents provided to you by the Strickland Metals Limited (Company). The Information is current as at the date of its release and the Compa

  3. Slide 3: Corporate Overview

    Corporate Overview Board Capital Structure (as of 16 February 2026 unless otherwise stated) Anthony McClure Non-Executive Chairman Shares on issue 2,631,868,767 Performance rights (20c, 30c, 50c)1 71,300,000 Paul L’Herpiniere Managing Director Options (13.5c) 50,000,000 Richard Pugh Non-Executive Di

  4. Slide 4: Strickland Metals – A Rare Opportunity

    Strickland Metals – A Rare Opportunity Rogozna Project JORC Inferred Resources of 8.6Moz AuEq1 : ASX/TSX Listed Gold Development Projects* one of the largest resource bases among ASX-listed gold 12.0 TSX explorers and growing. ASX 10.0 Zijin Mining as strategic investor: World’s 3rd largest mining C

  5. Slide 5: Momentum Growing as Rogozna Gains Traction

    Momentum Growing as Rogozna Gains Traction Transformational project with significant upside potential ahead July 2024 February 2026 Value Accretion Drivers Resource Base 5.4Moz AuEq +58% 8.6Moz AuEq1 Low cost MRE Growth • Gradina Non-Core Asset • Kotlovi >A$100m value created through sale of WA Asse

  6. Slide 6: Rogozna Overview

    @Y STRICKLAND Rogozna Overview

  7. Slide 7: Rogozna – In the Land of Giants

    Rogozna – In the Land of Giants Highly prospective geology Western Tethyan Belt with multiple giant porphyry-related deposits. Major miners active in-country Zijin, Rio Tinto, BHP and Dundee Precious Metals. Mining in Serbia 2.7% of GDP, strategy to increase contribution over the next decade. Europe

  8. Slide 8: Rogozna Overview

    Rogozna Overview A massive magmatic mineral system covered by ~184 km2 of tenure. Located in the heart of one of Europe’s largest historical base metal mining centres – Trepca Mineral District. Four skarn-hosted gold + base metal deposits and extensive exploration pipeline with >20 targets defined b

  9. Slide 9: Rogozna Sustainability

    Rogozna Sustainability Zlatna Reka Resources - Strickland Metals’ 100%-owned Serbian subsidiary 58 permanent employees = >100% increase over 12 months; • 60% from local communities. • 31% Female = >50% increase over 12 months. • 20% of workforce focused on community, environment and cultural heritag

  10. Slide 10: Deposit Overview

    @Y STRICKLAND Deposit Overview

  11. Slide 11: Gradina Deposit – 1.2Moz High-Grade Gold System

    Gradina Deposit – 1.2Moz High-Grade Gold System 12Mt @ 3.0g/t Au for 1.20Moz Au JORC 2012 Inferred Resources1 • The highest grade, most gold-dominant deposit at Rogozna. • Resources constrained by Long Hole Open Stoping UG mining shapes @ $2,500/oz gold price, >1.5g/t Au cut-off grade. • Significant

  12. Slide 12: Shanac Deposit – 5.3Moz AuEq and Growing

    Shanac Deposit – 5.3Moz AuEq and Growing 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources1 • Includes 32Mt @ 1.8g/t AuEq for 1.85Moz AuEq (>1.2g/t AuEq cut-off grade). • Resources constrained by Sub Level Cave UG mining shapes @ $US 2,250/oz gold price, >0.6g/t AuEq cut-off grade. •

  13. Slide 13: Red Creek – New Discovery 1km from 5.3Moz Shanac Deposit

    Red Creek – New Discovery 1km from 5.3Moz Shanac Deposit High-grade gold and base metals discovery with significant upside potential. Discovery hole (ZRSD25233) significant intercepts1: • 4.0m @ 4.0g/t AuEq from 44.0m; and 524.5 to 526.5m – 0.4g/t Au, 1.4% Cu, 0.2% Pb, 0.1% Zn and 15.5g/t Ag 522.0 t

  14. Slide 14: Red Creek – Upside Potential

    Red Creek – Upside Potential • A very large search space exists at Red Creek – with limited drilling for ~1.5km along strike to the SE, towards Copper Canyon and ~1km of open space laterally to the east towards Shanac. • Follow-up drilling to be carried out in 2026. Red Creek to Shanac Cross Section

  15. Slide 15: Medenovac Deposit – Structurally Controlled High-Grade Core

    Medenovac Deposit – Structurally Controlled High-Grade Core 21Mt @ 1.9g/t AuEq for 1.28Moz AuEq JORC 2012 Inferred Resources1 . • 6,800 AuEq OPVM over 150m vertical extent. • Resources constrained by Sub Level Cave UG mining shapes @ $2,250/oz, >1.0g/t AuEq cut off grade. • Mineralisation remains op

  16. Slide 16: Kotlovi – New Discovery with Growing Mineralisation Footprint

    Kotlovi – New Discovery with Growing Mineralisation Footprint Significant new discovery with scale potential just 350m west of Medenovac. • 277.3m @ 1.3g/t AuEq from 337.4m (ZRSD25189)1, incl. • 163.0m @ 1.4g/t Au from 337.4m, incl. • 33.5m @ 2.9g/t Au from 339.4m, and • 2.0m @ 15.3g/t Au from 370.9

  17. Slide 17: Copper Canyon Deposit – Outcropping Copper-Gold

    Copper Canyon Deposit – Outcropping Copper-Gold 28Mt @ 0.9g/t AuEq for 0.81Moz Au Eq JORC 2012 Inferred Resources1 • Resources constrained by open-pit shell @ US$2,000/oz, 0.4g/t AuEq cut-off, 2.2:1 strip ratio. • Upper zone of Cu-Au mineralisation up to 150m thick, 0.5g/t Au and 0.5% Cu.2 • Au-only

  18. Slide 18: Exploration Upside – An Extensive Portfolio of Targets

    Exploration Upside – An Extensive Portfolio of Targets Skarn systems the scale of Rogozna often have a mineralised porphyry in proximity. Porphyry-related alteration and mineralisation confirmed at Jezerska Reka1: • 493.0m @ 0.1g/t Au from 223.6m (ZRJD24002) Mineralisation-related structural framewo

  19. Slide 19: Project Development

    @Y STRICKLAND Project Development

  20. Slide 20: Key Deliverables for 2026/27

    Key Deliverables for 2026/27 70,000m Resource and Discovery Drilling at Rogozna in 2026 Dec 2025 1H 2027 1.2Moz Au PFS Maiden Delivery Gradina MRE Q1 2026 Q1 2026 Q2 2026 Q2 2026 Q2 2026 Q2 2026 Q4 2026 Shanac PFS Drilling Resource Internal Discovery Porphyry Resource MRE Start Growth Scoping Drilli

  21. Slide 21: Strickland Metals - Primed for Growth

    Strickland Metals - Primed for Growth Significant Scale 8.6Moz AuEq1 Rogozna Project in Rogozna Resource Growth1 Serbia. 10.0 Gradina 9.0 Medenovac Clear Focus and exceptional leverage to further Shanac discoveries, resource growth and the strong gold 8.0 Copper Canyon Contained Metal (AuEq Moz) pri

  22. Slide 22: Mineral Resource & Supporting Information

    Mineral Resource & Supporting Information 22

  23. Slide 23: Appendix 1: Rogozna Inferred Mineral Resource Estimates

    Appendix 1: Rogozna Inferred Mineral Resource Estimates Tonnes AuEq Au Cu Ag Pb Zn AuEq Au Cu Ag Pb Zn Prospect (Mt) (g/t) (g/t) (%) (g/t) (%) (%) (Moz) (Moz) (kt) (Moz) (kt) (kt) Gradina 12 3.0 3.0 - - - - 1.2 1.2 - - - - (December 2025)A Medenovac 21 1.9 0.77 0.27 6.3 0.11 1.54 1.28 0.52 57 4.3 23

  24. Slide 24: Appendix 2: Junior Listed ASX Gold Project Summary

    Appendix 2: Junior Listed ASX Gold Project Summary Reported JORC 2012 Resource Gold Grade Copper Lead Grade Zinc Grade Silver Grade AuEq Grade Contained Project Company Exchange Development Stage Tonnes (Mt) Source (g/t) Grade (%) (%) (%) (g/t) (g/t) AuEq (Moz) Estelle Nova Minerals ASX:NVA PFS/Scop

  25. Slide 25: Appendix 3: ASX Gold Project Resources

    Appendix 3: ASX Gold Project Resources Measured Indicated Inferred Total Gold Grade Contained Gold Grade Contained Gold Grade Contained Gold Grade Contained Project Company Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) Estelle Nov

  26. Slide 26: Appendix 4: Junior Listed TSX Gold Project Summary

    Appendix 4: Junior Listed TSX Gold Project Summary Reported Mineral Resource Copper Lead Zinc Contained Gold Silver Grade AuEq Grade Project Company Exchange Development Stage Tonnes (Mt) Grade Grade Grade AuEq Source Grade (g/t) (g/t) (g/t) (%) (%) (%) (Moz) Titiribi GoldMining Inc. TSX:GOLD Explor

  27. Slide 27: Appendix 5: TSX Gold Project Resources

    Appendix 5: TSX Gold Project Resources Measured Indicated Inferred Total Gold Grade Contained Gold Grade Contained Gold Grade Contained Gold Grade Contained Project Company Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) Titiribi Go

  28. Slide 28: Competent Persons Statement & Gold Equivalent Calculations

    Competent Persons Statement & Gold Equivalent Calculations Gold Equivalent Calculations (Rogozna Project) Gold Equivalent calculations for exploration results withing this presentation are based on the following metal prices; For Gradina, The AuEq grade includes only gold grades. Estimates for this

  29. Slide 29: Paul L’Herpiniere, Managing Director

    Paul L’Herpiniere, Managing Director info@stricklandmetals.com.au +61 8 6317 9875

Strickland Metals — Investor Presentation (February 2026) on 6ix