Kalamazoo Resources Ltd. · ASX:KZR

Kalamazoo Resources — Shareholder Meeting (November 2019)

18 slides from Kalamazoo Resources's shareholder meeting presentation, Nov 13, 2019

  1. Slide 1: Annual General Meeting

    For personal use only Annual General Meeting 13 November 2019 1

  2. Slide 2: Investment Presentation disclaimer

    Investment Presentation For personal use only This Investment Presentation (IP) is not a disclosure document under Chapter 6D of The Company makes no representation, or warranty (express or implied) as to the the Corporations Act nor an offer to subscribe for shares. This IP is specifically accuracy

  3. Slide 3: Capital Structure and Board and Management

    Capital Structure Board and Management For personal use only Luke Reinehr Executive Chairman/CEO Shares 101,941,434 Angus Middleton Non-Executive Director Unlisted options 36,250,000 Paul Adams Non-Executive Director Market Cap (at $0.32) $32.6 m Bernard Crawford CFO/Company Secretary 1 Dr. Luke Mor

  4. Slide 4: For personal use only

    For personal use only ▪ Acquisition of entire Castlemaine Goldfield in 2018 (5.6 Moz historical production1) ▪ South Muckleford and Tarnagulla (2.1 Moz and 0.7 Moz historical field production1) added 2019 ▪ Pilbara Gold Projects and Cork Tree Cu Project highly prospective ▪ Snake Well sold for $7m t

  5. Slide 5: Victorian focus: Castlemaine and South Muckleford

    For personal use only ▪ Victorian focus: Castlemaine and South Muckleford are the right locations to find the next Fosterville ▪ No systematic modern geophysical exploration techniques (e.g. IP) since the 1960s ▪ Exploring for high grade only (>10g/t) - projects adjacent to key major (causative) reg

  6. Slide 6: Wattle Gully programs undertaken during 2019

    For personal use only ▪ Wattle Gully (EL 6679) programs undertaken during 2019: ➢ Extensive data research ➢ Logging and consolidation of 80,000m (historical) diamond core-farm ➢ CSIRO Collaboration Studies ➢ IP and Ground Magnetic Surveys ➢ 3D structural geology modelling ➢ 10,000m diamond drilling

  7. Slide 7: Castlemaine Gold Project — Core Farm

    Castlemaine Gold Project — Core Farm kalamazoo Sa x i ae : 7 er aE

  8. Slide 8: Castlemaine Gold Project — CSIRO Study

    Castlemaine Gold Project — CSIRO Study Ckalamazoo =3] ; ia o) | 4 iw i \ ie

  9. Slide 9: Castlemaine Gold Project — IP Survey

    Castlemaine Gold Project —1P Survey alamazoo f R COASTAL WATERS eae narine parks anoreserves 4f=< Ns OTHER PUBLIC LAND PARKS AND RESERVES i SOFTWOOD PLANTATION STATE FOREST KR Castlemaine 25K Topo

  10. Slide 10: Castlemaine Gold Project — IP and GMAG Surveys

    Castlemaine Gold Project — IP and GMAG Surveys C Kalamazoo resources Imad (Chargeabitity © 100m Resistivity @ ~100m rou 4 : 1 : 1 Ground Magnetics + 58975004 + 8870004 + sssesoo-4 + sasssoo-4 + ss9s000-4 f+ s8s4s00-

  11. Slide 11: Castlemaine Gold Project — Drilling

    8 ax © = mie} g illing -Dr Castlemaine Gold Project

  12. Slide 12: Castlemaine Gold Project — Drilling

    Ck alamazoo Castlemaine Gold Project — Drilling

  13. Slide 13: For personal use only

    For personal use only ▪ Regional geology to north includes recorded Au workings, shafts, drill holes, mapped faults and anticlines (Fig. A) ▪ Apparent bias and focus towards known mineralised area (Fig. A) ▪ Same host rocks and fault-fold structures within southern tenement but without the detailed

  14. Slide 14: South Muckleford

    For personal use only ▪ Acquired South Muckleford (EL 6959) during 2019 ▪ Applied for West Muckleford (EL 7021) and awaiting grant ▪ Exploration works planned for 2020: ➢ Complete extensive data compilation ➢ Project scale soil geochemistry ➢ Follow up IP & Ground Magnetic Surveys ➢ 3D structural ge

  15. Slide 15: Pilbara Gold Projects

    ▪ Marble Bar For personal use only ➢ High priority soil gold anomaly identified in the southern area of E45/4724 from recent reconnaissance sampling ➢ Gold values up to 261ppb (0.26ppm) in an anomalous zone stretching over 500m ➢ Located 18km north-west of Calidus Resources’ Warrawoona Gold Project

  16. Slide 16: Cork Tree Copper Project

    For personal use only ▪ Initial RC drill program with four holes for 624m1 in 2019 ▪ Five anomalous copper zones (>500ppm Cu) ▪ Best of the zones: intersection of anomalous copper across a significant 32m width at shallow depth (with maximum copper value of 2,140ppm (0.21% Cu) ▪ Continuing assessmen

  17. Slide 17: 2019 corporate highlights

    For personal use only ▪ Sale of Snake Well Gold Project (funds being paid on time with $5m payable in next 12 months) ▪ Fund raise of $1.2m in June 2019, with successful JMEI grant ▪ Strengthened exploration team with addition of Dr. Luke Mortimer and Tom Andrews ▪ Taylor Collison: brokers/corporate

  18. Slide 18: Kalamazoo Resources Ltd contact details

    Kalamazoo Resources Ltd ACN: 150 026 850 ASX: KZR www.kzr.com.au For personal use only Luke Reinehr, Chairman / CEO Head Office: Unit 6, 328 Reserve Road Cheltenham 3192, Victoria Phone: +61 3 9988 9007 Email: luke.reinehr@kzr.com.au Perth Office: Suite 7, 8 Clive Street West Perth 6005, Western Aus

Kalamazoo Resources — Shareholder Meeting (November 2019) on 6ix