Kalamazoo Resources Ltd. · ASX:KZR

Kalamazoo Resources — Australian Gold Conference 2026

19 slides from Kalamazoo Resources's conference presentation, Oct 15, 2026

  1. Slide 1: Ashburton Gold Project

    ASX : KZR al use only Ashburton Gold Project One of Australia’s most compelling gold developments Australian Gold Conference Emerging as a long-life development October 2026

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer HISTORICAL ASX ANNOUNCEMENTS AND REFERENCES The information in this release that relates to metallurgy, metallurgical test work and process design has been developed, and reviewed In preparing this announcement, the Company has relied on the following ASX announcement

  3. Slide 3: Corporate Overview

    Corporate Overview Capital Structure Major ShareholdersD SharesA 380,791,385 Mutual Trust Shares (to be issued) 55,555,554 14.6% 16.3% Musaqab Performance Rights 11,000,000 al use only Unlisted Options 41,611,111 YT International B Market Cap (A$0.175) A$66.6m Citicorp Nominees (inc. C Proforma Cash

  4. Slide 4: Board and Management Team

    Board and Management Team al use only Luke Reinehr Ben Ackerman Andrew McDougall Paul Adams Angus Middleton Executive Chairman Executive Director CEO Non-Executive Director Non-Executive Director Co-founder of Kalamazoo, Luke was Ben is an exploration geologist with Andrew is a mining engineer and O

  5. Slide 5: Kalamazoo Ethos

    Kalamazoo Ethos • The “Kalamazoo” was a small 6 x 3 ft train that operated on the now- defunct Port Hedland to Marble Bar railway • Passing through KZR’s very first gold exploration project, Gorge Creek, al use only north-west of Marble Bar, relics of this era can still be found onsite today • Core

  6. Slide 6: Enjoy the Journey

    Enjoy the Journey Belonging Commitment Growth We share a valued, safe, Together we manage and inclusive and secure work resolve the challenges and Our skills and expertise will al use only environment that we can opportunities that inevitably grow through effort and identify with and trust are prese

  7. Slide 7: KZR – 100% Owned Exploration and Development Portfolio

    KZR – 100% Owned Exploration and Development Portfolio Mallina West 118km2 Hemi-Analogue al use only Ashburton Gold Project 519km2 Flagship development project – 1.44Moz Resource PFS + Drilling underway High-Grade Gold- Antimony >2,000km2 tenements Snake Well North Historic and emerging 394km2 goldf

  8. Slide 8: Ashburton Gold Project: redefining a high-grade gold province

    Ashburton Gold Project: redefining a high-grade gold province al use only 8 Kalamazoo Resources | October 2026

  9. Slide 9: Ashburton Gold Project, 519km2, WA

    Ashburton Gold Project, 519km2, WA • New Gold Mining Province arising from a stranded oxide mining operations last mined in 2004 al use only • Over 420,000m drilled since 1990, now refocused on bringing resources to production • Extensive Regional Scale Mineral Tenure for Growth with Existing MREs a

  10. Slide 10: AGP - Clear Asset Strategy

    AGP - Clear Asset Strategy Two Distinctive Initial Project Waugh Peake MT OLYMPUS Areas for Investment 1.9Mt @ 3.4g/t 12.2Mt @ 2.7g/t 0.5Mt @ 1.9g/t 32koz 210koz 1.07Moz al use only Priority 1 Zeus 1.5Mt @ 2.5g/t 121koz High-grade Mt Olympus Project open pit gold production to concentrate Priority 2

  11. Slide 11: Mt Olympus Scoping Study

    Mt Olympus Scoping Study using AUD$4,500/oz Au2 and $6,000/oz Au Scenario All prices AUD Processing 1.5Mtpa Plant Initial Gold Output 8.5Mt @ 2.2 g/t Au 3 Stage Crushing/Flotation 524koz 86% recovery producing 25 g/t Au High- al use only over 71 months average of 73koz per annum Grade Concentrate Pr

  12. Slide 12: Drilling Delivers Exceptional Results at Mt Olympus

    Drilling Delivers Exceptional Results at Mt Olympus 23,000m drilled in 12 months across the Ashburton Gold Project Mount Olympus al use only • 13,726m (72 holes) • 16 holes +100gm • 38 Holes + 50gm Mt Olympus Drilling Highlights • 36m @ 16g/t Au from 181m (KARCD0146; 590g.m.) • 20m @ 19g/t Au from 2

  13. Slide 13: The Next Phase: Mt Olympus Resource Growth – Extend Mine Life

    The Next Phase: Mt Olympus Resource Growth – Extend Mine Life al use only Zeus (1.5Mt @ 2.5g/t for 121koz) Waugh (0.5Mt @ 1.9g/t) Regional Exploration • MRE update pending. • MRE update pending. • Extensive Mineral Tenure • Potential Life Extension • Potential Life Extension Secured • Regional Brown

  14. Slide 14: Peake

    Peake al use only MRE 210,000 oz Au @ 3.4 g/t Au • Combined Peake Resource/Target – highlights the potential for an additional ~450,000-590,000oz Au • District Scale growth pipeline emerging with five mineralised regional trends now identified across >12km of mineral strike extent 1. ASX: KZR 29 May

  15. Slide 15: Onsite at the AGP

    Onsite at the AGP al use only 15 Kalamazoo Resources | October 2026

  16. Slide 16: AGP – Project Develop Pipeline Emerging

    AGP – Project Develop Pipeline Emerging Activity 2026 2027 2028 2029 Mt Olympus Resource Drilling Updated MRE Pre Feasibility Study/DFS al use only Financing and Offtake Construction/Commissioning Peake, Zeus, Waugh MRE Updates Reserve Evaluation Integration into Mt Olympus Xanadu Drilling Resource

  17. Slide 17: Victorian Goldfields

    Victorian Goldfields • Portfolio within highly endowed Victorian geological setting al use only • Proximity to major gold and antimony systems including Fosterville, Costerfield, Nagambie, and Sunday Creek • KZR’s second meaningful longer-term discovery platform 17 Kalamazoo Resources | October 2026

  18. Slide 18: Mt Piper – Province Scale Gold-Antimony, Victoria

    Mt Piper – Province Scale Gold-Antimony, Victoria • 100% controlled 15km prospective structural corridor across 1,574km2 al use only • First-pass aircore drilling at Whiteheads Hill confirmed in- situ gold-antimony anomalism associated with a west- dipping structure • Reconnaissance programs at Cunn

  19. Slide 19: Enjoy the Journey

    ASX : KZR al use only ENJOY THE JOURNEY Luke Reinehr Executive Chairman Benjamin Ackerman Executive Director Contact Us Angus Middleton Non-Executive Director Paul Adams Non-Executive Director Andrew McDougall, CEO Investor Relations Andrew McDougall Chief Executive Officer andrew.mcdougall@kzr.com.

Kalamazoo Resources — Australian Gold Conference 2026 on 6ix