    Disclaimer This presentation is dated November 24th, 2017 and differs from the initial version dated November 14th, 2017. The marginal corrections and precisions made in-between are not such as to affect financial analysis This presentation contains forward-looking objectives and statements about VI

  3. Slide 3: Program

    Slide 3: Program

    Program 08:30 – 10:30 VINCI Concessions presentation (1st part) • Welcome & introduction • A promising market • Key figures and organisation • Operational performance 10:30 – 11:00 Break 11:00 – 11:45 VINCI Concessions presentation (2nd part) • Focus on last 2-year development • Conclusion & closing

  4. Slide 4: Concessions within the VINCI Group

    Slide 4: Concessions within the VINCI Group

    CONCESSIONS WITHIN THE VINCI GROUP

  5. Slide 5: The VINCI group: what we do

    Slide 5: The VINCI group: what we do

    The VINCI group: what we do Concessions Contracting VINCI is Europe’s leading transport infrastructure VINCI Energies, Eurovia and VINCI Construction form an concession operator unrivalled network of expertise and companies It operates motorways, airports, bridges and tunnels, In 2016, their 169,192

  6. Slide 6: An integrated concession / construction model

    Slide 6: An integrated concession / construction model

    An integrated concession / construction model Strong operational and financial complementarity between concessions and contracting businesses Concessions Contracting Transport infrastructure (motorways, airports, Construction, road and rail works, bridges, tunnels, railways), public amenities electr

  7. Slide 7: Concessions within the VINCI group

    Slide 7: Concessions within the VINCI group

    Concessions within the VINCI group 1 year from 01.07.2016 to 30.06.2017. Based on consolidated data Concessions including VINCI Autoroutes and VINCI Stadium Financials People Recurring Net financial Capital Revenues(1) EBITDA(2) operating income debt(3) employed(4) Staff(3) € 6.6bn € 4.5bn € 3.2bn €

  8. Slide 8: Today's focus: concessions excluding French motorways

    Slide 8: Today's focus: concessions excluding French motorways

    Today’s focus: concessions excluding French motorways Concessions Contracting VINCI VINCI Other VINCI VINCI VINCI Eurovia Autoroutes Airports concessions Immobilier Energies Construction Number of Number of Consolidated 4 activities projects(1) countries revenue(3) (€m) Nov. 2017 Nov. 2017 VINCI Air

  9. Slide 9: A Promising Market

    Slide 9: A Promising Market

    ‘CONCESSIONS. A PROMISING MARKET

  10. Slide 10: Targetable infrastructure construction need

    Slide 10: Targetable infrastructure construction need

    Targetable infrastructure construction need Data in trillions of US dollars Annual worldwide need for infrastructure Excluding M&A transactions US$ 3.3 trillion Power 1.0 yearly need over 2016-2030 worldwide Roads 0.8 o/w 1,200bn in rail, roads & airports (40%) Telecom 0.5 o/w $ 850bn out of China W

  11. Slide 11: Privatisation opportunities

    Slide 11: Privatisation opportunities

    Privatisation opportunities FOCUS ON AIRPORTS World 41% 14% 14% of airports worldwide(1) are managed or financed by private entities 41% - Concessions Europe North 24% - Freeholds America 75% 31% 23% - Owned by listed companies 1% 1% 8% - Under O&M contract Middle East 4% - Miscellaneous Asia 13% 2%

  12. Slide 12: Competition landscape

    Slide 12: Competition landscape

    Competition landscape Integrated Funds contractors / operators Pure operators Airports Note: list of competitors is not exhaustive 12

  13. Slide 13: Last 2-year development - Map

    Slide 13: Last 2-year development - Map

    Last 2-year development - Map Canada Russia UK Germany Japan United States France Slovakia Portugal Greece Jamaica Cambodia Dominican India Republic Colombia Portfolio as of Nov. 2015 Peru Brazil New contract Nov. Nov. Δ 2015(1) 2017 New country Chile Projects 59 74 +15 13 Equity € 4.3bn(2) € 7.2bn

  14. Slide 14: Last 2-year development - Overview

    Slide 14: Last 2-year development - Overview

    Last 2-year development - Overview Data in millions of euros based on best estimations as of 30.09.2017 Equity Incl. already Initial Duration Project Country % owned committed injected by works(1) (years)(2) by VINCI VINCI (rounded) VINCI Airports AERODOM Dom. Rep. 100% 365 365 - 14 Salvador Airport

  15. Slide 15: Ongoing development

    Slide 15: Ongoing development

    Ongoing development Canada Russia Germany Ireland USA Serbia Japan France Greece Burkina Faso Iran Jamaica (MOU) Vietnam Cape (MOU) Colombia Verde Cameroon (MOU) Kenya Peru Indonesia Brazil Portfolio as of Nov. 2017 15 Prospects 15

  16. Slide 16: Key Figures and Organisation

    Slide 16: Key Figures and Organisation

    KEY FIGURES AND ORGANISATION

  17. Slide 17: Management

    Slide 17: Management

    Management NICOLAS NOTEBAERT CEO, VINCI Concessions Chairman and CEO, VINCI Airports FADI CHRISTOPHE OLIVIER ANNE PIERRE-YVES SELWAN PELISSIE DU RAUSAS MATHIEU LE BOUR BIGOT Executive Vice President Executive Vice President Executive Vice President and CFO Communications Director Human Resources Dir

  18. Slide 18: Organisation chart

    Slide 18: Organisation chart

    Organisation chart N. America & Europe Carribean S. America Asia VINCI Airports Salvador Airport Kansai Airports Lyon Airports Brazil Japan ANA AERODOM Portugal France Dominican Republic Nuevo Pudahuel Cambodia Airports Excl. Lyon Airports Chile VINCI Highways Germany Greece USA / Canada Colombia Ru

  19. Slide 19: Performance snapshot

    Slide 19: Performance snapshot

    Performance snapshot Consolidated data in millions of euros At comparable scope, excluding VINCI Park / Indigo and reintroducing international subsidiaries Revenue(1): +44% CAGR previously consolidated into VINCI Autoroutes scope 1,364 1,110 EBITDA(2): +70% CAGR 862 54% 753 738 MARGIN 588 Net result

  20. Slide 20: Consolidated versus managed data

    Slide 20: Consolidated versus managed data

    Consolidated versus managed data Data in billions of euros Consolidated Managed(1) 2016 2016 3.5 1.1 Traffic risk revenues 1.7 0.6 Traffic risk EBITDA 53% 50% Traffic risk EBITDA margin 0.23 0.31 Net result 18.3 6.2 Net debt (1) All companies in the managed scope at 100%, including minority stakes b

  21. Slide 21: Strategy

    Slide 21: Strategy

    ‘CONCESSIONS. STRATEGY

  22. Slide 22: Complementary divisions

    Slide 22: Complementary divisions

    Complementary divisions Other TOTAL VINCI Airports VINCI Highways concessions Other TOTAL VINCI Airports VINCI Highways BROWNFIELD concessions €€3.5bn 3.5bn €€2.9bn 2.9bn €€0.6bn 0.6bn 2016 traffic €€0.02bn 0.02bn 2016risk traffic risk managedmanaged revenues (1) revenue €€7.2bn 7.2bn €€4.5bn 4.5bn

  23. Slide 23: Increase in Yellow- and Brownfield projects volume

    Slide 23: Increase in Yellow- and Brownfield projects volume

    Increase in Yellow- and Brownfield projects volume Concessions won by category 4 Greenfield 3 Yellowfield 2 Brownfield 1 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 1 concession contract signed / concession company acquire

  24. Slide 24: 5 years of intensive equity investments

    Slide 24: 5 years of intensive equity investments

    5 years of intensive equity investments Evolution of equity committed Greenfield Yellowfield € 6bn Brownfield equity committed since 2013 2007 2014 2008 2009 2010 2011 2012 2013 2015 2016 2017 2018 Size of the circles illustrates the equity amounts committed by VINCI (fully presented on concession c

  25. Slide 25: Portfolio diversification

    Slide 25: Portfolio diversification

    Portfolio diversification All projects contribute to build an efficient portfolio €bn €m €bn Average Equity Average Deal Total signing commit- equity volume(1) works(2) date ted ticket GREEN- and YELLOWFIELD Greenfield 2006 22 0.7 30 13.1 > 90 % of construction works Green- and yellowfield projects

  26. Slide 26: Strategy for greenfield projects

    Slide 26: Strategy for greenfield projects

    Strategy for greenfield projects Market trend Geography VINCI Airports Number of projects x2 All continents over the last 3 years Number of projects Mainly Europe VINCI Highways remains high and Americas VINCI Railways Opportunistic approach 26

  27. Slide 27: Focus on works

    Slide 27: Focus on works

    Focus on works Data in billions of euros. All companies in the managed scope at 100% 3.0 2.7 AutresConcessions Other Concessions € 18bn 2.5 2.3 2.3 2.2 VINCI Airports works realised in project 2.1 2.0 companies since 2007 VINCI Railways 2.0 1.7 VINCI Highways 1.5 1.5 1.4 c. € 3bn 1.1 initial works c

  28. Slide 28: Diversify the country risk: a portfolio strategy

    Slide 28: Diversify the country risk: a portfolio strategy

    Diversify the country risk: a portfolio strategy GDP growth (y-o-y) 3.0% 2.7% 2.4% 2.5% 2.1% 2.0% 1.9% 2.0% 1.8% 1.8% 1.8% 1.7% 1.7% Average GDP growth 1.6% (1) of portfolio 1.5% Advanced 1.0% Economies France 0.5% 0.0% 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 (1) Portfolio as of Nov.

  29. Slide 29: Extend the maturity of the portfolio

    Slide 29: Extend the maturity of the portfolio

    Extend the maturity of the portfolio Weighted by average expected net result. Including VINCI Autoroutes Remaining life(1) of concessions (number of years) 23 22 28 27 28 29 1 8 8 10 12 1 Extensions due to development Remaining life(1) of the portfolio as at end of 2011, mainly driven by VINCI Autor

  30. Slide 30: Operational Performance

    Slide 30: Operational Performance

    VINCI ‘CONCESSIONS. OPERATIONAL PERFORMANCE

  31. Slide 31: Robust delivery of complex projects

    Slide 31: Robust delivery of complex projects

    Robust delivery of complex projects Delivered projects 8 projects with initial works delivered since Nov. 2015 Main achievements 12 projects were under construction 2 years ago SEA 4 still under construction in accordance with initial planning ● The largest high speed railway concession in Europe ●

  32. Slide 32: Operational Performance: 1. VINCI Airports

    Slide 32: Operational Performance: 1. VINCI Airports

    OPERATIONAL PERFORMANCE 1. VINCI Airports

  33. Slide 33: Expansion strategy

    Slide 33: Expansion strategy

    Expansion strategy A 3-scale strategy Sizeable targets Systematically bid on all Sustainable market depth Bid 3 to 4 privatisations >€ 200m expected every year privatisations and M&A solicitations bids 20 deals / year between 2014 and 2016 Looking for capital Many potential targets Structuring inten

  34. Slide 34: Key drivers for operations

    Slide 34: Key drivers for operations

    Key drivers for operations Aeronautical Non-aeronautical revenues revenues OPEX Early stage market studies Retail Staff management Modernised commercial areas Stable / limited increase of staff Communication and business in case of high traffic growth Optimised customer path relationship with airlin

  35. Slide 35: Next 5 years: a transition in VINCI Airports' strategy

    Slide 35: Next 5 years: a transition in VINCI Airports' strategy

    Next 5 years: a transition in VINCI Airports’ strategy From 2018 onwards Ensure excellence in operation & programme management 2012-2017 Seize privatisation and diversified / secondary Became 4th operator worldwide market opportunities € 4.5bn equity committed Showed ability to be a big player in th

  36. Slide 36: Traffic development

    Slide 36: Traffic development

    Traffic development Data for the full scope managed by VINCI Airports (35 airports at 100%) 2017LTM traffic evolution 2017LTM development >250 Portugal +18.2% New routes opened France +9.7% Japan +7.2% >250 >2,000 Chile +11.1% Scheduled Airlines’ airlines meetings(1) Dominican Rep. +4.4% Cambodia +2

  37. Slide 37: Tariff regulation

    Slide 37: Tariff regulation

    Tariff regulation No / extraordinary Full negotiation negotiation scheme CPI +/- X% STATE-LED NEGOTIATION NEGOTIATION ANA, Santiago, France AERODOM, Kansai Airports Cambodia, Salvador Tariff indexation rules are Tariff based on a target return and Tariff growth is negotiated fixed in the concession

  38. Slide 38: Revenue diversification - Retail

    Slide 38: Revenue diversification - Retail

    Revenue diversification - Retail Extra-aeronautical revenues VINCI Airports, % of total managed revenues Breakdown extra-aeronautical revenues 2017LTM 2017LTM Real estate 18% 2014 43% Advertising, 8% rent a car 25% Retail c. € 1,289m Car park 10% 64% c. € 200m Increasing weight of extra-aeronautical

  39. Slide 39: Revenue diversification – Retail

    Slide 39: Revenue diversification – Retail

    Revenue diversification – Retail 1 Continuous improvement of commercial offer at Lisbon since 2013 Densification of commercial areas Opening of new shops CAGR 2013-2017 retail New food court revenues for ANA: c. +17% Customers journey fully redesigned in 2016 Set-up “Best of Portugal” products conce

  40. Slide 40: Revenue diversification – Focus on LFP acquisition

    Slide 40: Revenue diversification – Focus on LFP acquisition

    Revenue diversification – Focus on LFP acquisition Deal overview Overview of activities Acquisition of 51% of Lojas Francas Portugal (LFP) on 11 July 2017 from TAP(1) Remaining 49% held by DUFRY, world leader in airport retail Co-control with DUFRY – not fully consolidated by VINCI Deal rationale Im

  41. Slide 41: ANA – Outlook update

    Slide 41: ANA – Outlook update

    ANA – Outlook update What we forecasted Where we stand today back in Sept. 2013 +2% to +3% >10% Traffic 2012-2022 CAGR 2012-2017LTM CAGR Non-aeronautical > 5% >10% revenues 2012-2022 CAGR 2012-2017LTM CAGR EBITDA margin ~50% in 2018 >65% in 2017LTM CAPEX excluding Montijo and c. € 50m / year In line

  42. Slide 42: ANA – Overview

    Slide 42: ANA – Overview

    ANA – Overview ANA at a glance Geographic footprint ANA acquired by VINCI in September 2013 Azores Archipelago Enterprise value at closing: € 3.1bn Porto VINCI share: 100% Flores 10 airports - Lisbon, Porto, Faro, civil terminal of Beja, Madeira-Funchal, Porto Santo and Azores (4 airports) Horta Pon

  43. Slide 43: ANA – Traffic

    Slide 43: ANA – Traffic

    ANA – Traffic Rationale for a double-digit growth Breakdown pax per airport Strong traffic since VINCI acquisition Azores CAGR 2012-2017LTM > 10% 4% Madeira 7% Growth of tourism and city breaks Tourists currently favor Portugal to North African seaside destinations Boom of LCC Faro 17% Including Rya

  44. Slide 44: ANA – Financial performance (1/2)

    Slide 44: ANA – Financial performance (1/2)

    ANA – Financial performance (1/2) Revenues Key financials at 100%(1) Aeronautical revenues CAGR are computed with nominal data and in EUR Sharp increase in line with traffic growth (see previous slide) 2016-26e Extra-aeronautical revenues 2013 2014 2015 2016 2017LTM CAGR c. 30% of total revenues Tra

  45. Slide 45: ANA – Financial performance (2/2)

    Slide 45: ANA – Financial performance (2/2)

    ANA – Financial performance (2/2) Focus on OPEX and EBITDA margin Strategic considerations Evolution of EBITDA and EBITDA margin since VINCI acquisition Macroeconomics Much healthier economic environment due to reforms over past years €m % of revenues Tourism expected to grow and maintain in the nea

  46. Slide 46: ANA – Focus on extension projects in Lisbon

    Slide 46: ANA – Focus on extension projects in Lisbon

    ANA – Focus on extension projects in Lisbon Context Description of proposed works Traffic in Lisbon greatly higher than expected at acquisition New Montijo airport Traffic 2017LTM: 25.8m pax CAPEX to be invested at Montijo airport Capacity increase Trigger events for New Lisbon airport will be reach

  47. Slide 47: Cambodia Airports – Overview

    Slide 47: Cambodia Airports – Overview

    Cambodia Airports – Overview Project overview Map Start of operation of SCA in 1995 More than 20 years of partnership with Cambodian government Shareholding: SIEM REAP VINCI Airports (70%) Muhibbah Masteron Cambodia (30%), a Malaysian-Cambodian joint venture End of concession in October 2040 3 airpo

  48. Slide 48: Cambodia Airports – Traffic

    Slide 48: Cambodia Airports – Traffic

    Cambodia Airports – Traffic Historical traffic Traffic growth analysis Historical traffic of SCA – a success story Strong dynamic of traffic since 2013 (+13% per year) Acceleration in 2017LTM (+22.9%) Passengers mPAX CAGR: +13% ● High growth in the country’s 3 airports (up +31%) reflecting 8.3 excel

  49. Slide 49: Cambodia Airports – Financial performance

    Slide 49: Cambodia Airports – Financial performance

    Cambodia Airports – Financial performance Financial performance Key Financial figures at 100% Revenues have increased by +12% in 2016 and +20% in 2017LTM Aero yields improved due to favorable traffic mix evolution 2016 2017LTM ● More international pax and bigger aircraft type for domestic traffic Tr

  50. Slide 50: Santiago, Chile – Overview

    Slide 50: Santiago, Chile – Overview

    Santiago, Chile – Overview Concession overview Map Data for 2016 Concession of Santiago airport (Chile) Operation start: October 2015 Concession period: 20 years (till September 2035) Shareholding: VINCI Airports (40%), ADP (45%), Astaldi (15%) Bogota 31m pax Traffic 2017LTM: 20.7m pax Brasilia 6th

  51. Slide 51: Santiago, Chile – Financial performance

    Slide 51: Santiago, Chile – Financial performance

    Santiago, Chile – Financial performance Traffic performance Key financials Strong growth in traffic (millions of pax) Key figures at 100% 2016 2017LTM 19.2 20.7 16.1 17.2 Traffic (m pax) 19.2 20.7 Revenues(1) (€m) 53.7 58.7 EBITDA margin 41.6% 43.6% 2014 2015 2016 2017LTM Favorable trend should ensu

  52. Slide 52: Santiago, Chile – Construction overview

    Slide 52: Santiago, Chile – Construction overview

    Santiago, Chile – Construction overview Construction overview VINCI Group’s largest building construction project worldwide Construction period: 2016 to 2020e c.US$ 900m expansion to double capacity A challenge for VINCI Project’s size Tight timetable Complex phasing required to enable uninterrupted

  53. Slide 53: Operational Performance: 2. VINCI Highways

    Slide 53: Operational Performance: 2. VINCI Highways

    OPERATIONAL PERFORMANCE 2. VINCI Highways

  54. Slide 54: Strategy – Selective growth

    Slide 54: Strategy – Selective growth

    Strategy – Selective growth Key strategics (excl. greenfield) Next years growth potential Selective / opportunistic approach Keep current dynamic for targeted deals Focus on projects exposed to traffic risk ● Over 5 due diligence processes per year Brownfield Looking for increased footprint in curre

  55. Slide 55: Electronic Toll Collection (ETC) projects

    Slide 55: Electronic Toll Collection (ETC) projects

    Electronic Toll Collection (ETC) projects Toll Russian Collect Interoperability M50 SR91 Greece Express Lanes Toll Plus VIA 40 ICICI Bank Express Bank of Baroda LAMSAC - PEX Projects under operation / operators Preferred Bidder 55

  56. Slide 56: Traffic performance

    Slide 56: Traffic performance

    Traffic performance VINCI Highways – traffic performance Key elements Toll transactions(1), all types of vehicles, excluding operation Russia contracts (Cofiroute USA and UTS in Russia) Still in ramp-up phase. MSP 1 highway opened to traffic in November 2014 and became tolled in November In thousand

  57. Slide 57: Granvia – Reducing the OPEX

    Slide 57: Granvia – Reducing the OPEX

    Granvia – Reducing the OPEX Granvia Operation operates the 51km R1 Expressway in Slovakia. Availability payment scheme. Costs of operations Actions on operating costs -27% in supplies costs since 2013 -4.1% Containment of staff costs (+1.5% per year since 2013) per year €m Renegotiation of contracts

  58. Slide 58: Operational Performance: 3. VINCI Railways

    Slide 58: Operational Performance: 3. VINCI Railways

    OPERATIONAL PERFORMANCE 3. VINCI Railways

  59. Slide 59: VINCI Railways – Seize the opportunities

    Slide 59: VINCI Railways – Seize the opportunities

    VINCI Railways – Seize the opportunities 4 projects Key strategics LIEFKENSHOEK (divestment: 2016) Opportunistic and selective strategy GSM RAIL Looking for synergies with VINCI group’s TOURS- Contracting subsidiaries BORDEAUX SEA HSL RHÔNEXPRESS Selective development Essentially Light Rail Transit

  60. Slide 60: SEA – Business model

    Slide 60: SEA – Business model

    SEA – Business model € 7.8bn investment, one of the biggest infrastructure project in EU Delivered in time and within budget Concession till 2061 Why a concession? Public financing and budget under constraints Better risk allocations Optimisation of maintenance and asset renewal costs Innovation cap

  61. Slide 61: SEA – Project structure

    Slide 61: SEA – Project structure

    SEA – Project structure Project players Financing totaling € 7.8bn € 772m € 3.8bn LISEA Shareholders equity LISEA financing portion € 1bn MOBILITES SNCF Réseau contribution € 1,672m Bank loan debt Concession contract State guarantee for 1060 M€ Current client(1) Shareholders (50 years) € 3bn (33,4%)

  62. Slide 62: SEA – Financial performance

    Slide 62: SEA – Financial performance

    SEA – Financial performance Current performance and 10-year targets Operation – Summer 2017 Over the first 3 months of operation, the train regularity reached 75% Proforma Full (SNCF target: 83.5 %) Traffic Q3 2017 year 2017 Lost time: Passengers (SNCF forecast) 17m Revenues € 57.1m ● 80% due to ext

  63. Slide 63: SEA – How to improve business model

    Slide 63: SEA – How to improve business model

    SEA – How to improve business model Basically today, commercial policy of historic operating company SNCF is mainly covering: Low-cost demand (Ouigo) privileging capacity instead of frequency Middle range demand (InOui) Still having difficulties to attract professional and business demand using air

  64. Slide 64: Rhônexpress – Creating revenue growth

    Slide 64: Rhônexpress – Creating revenue growth

    Rhônexpress – Creating revenue growth Rhônexpress, light-rail link between the main train station and the airport in Lyon Shareholding: VINCI (35%), CDC (37%), Transdev (28%) Revenues Actions From 2011 Action 1: Promote Rhônexpress to 2016: Resulting in traffic growth 2x higher than those of the air

  65. Slide 65: Focus on Last 2-Year Development

    Slide 65: Focus on Last 2-Year Development

    FOCUS ON LAST 2-YEAR DEVELOPMENT 1.)

  66. Slide 66: Focus on Last 2-Year Development: Kansai Airports (Japan)

    Slide 66: Focus on Last 2-Year Development: Kansai Airports (Japan)

    FOCUS ON LAST 2-YEAR DEVELOPMENT 1. VINCI Airports a. Kansai Airports (Japan)

  67. Slide 67: Kansai Airports – Overview

    Slide 67: Kansai Airports – Overview

    Kansai Airports – Overview 1st strategical move – Kansai & Osaka airports Map Strategical move in JAPAN with the concession of Kansai (KIX) and Osaka (ITM) New Chitose VINCI share 40% Airport Operation start April, 1st 2016 (for 44 years until 31 March 2060) Naha Airport Traffic 2017LTM KIX+ITM 42.5

  68. Slide 68: Kansai Airports – Deal structure

    Slide 68: Kansai Airports – Deal structure

    Kansai Airports – Deal structure Investment sources Equity (Kansai + Osaka): € 655m at 100% (¥ 80bn), € 263m at VINCI share Debt profile (Kansai Airports) Equity Kobe: c. €9m at 100% (¥ 1.1bn) to be injected(1) in 2018 Mezzanine 11% External debt: Successful issuance with good financial conditions T

  69. Slide 69: Kansai Airports – Traffic

    Slide 69: Kansai Airports – Traffic

    Kansai Airports – Traffic Traffic evolution Traffic per destination 2017LTM KIX+ITM - mPax Southeast Asia Europe 7% 2% 4% Other CAGR: +7.7% North America 1% 42.5 40.2 37.7 Hong Kong & Macau 6% 33.9 31.6 Taiwan 6% Japan 52% South Korea 12% China 10% KIX: significant exposure to Asia in particular Chi

  70. Slide 70: Kansai Airports – Financial performance

    Slide 70: Kansai Airports – Financial performance

    Kansai Airports – Financial performance Traffic and financial performance Performance analysis Key figures at 100% Aeronautical revenues CAGR are computed with nominal data and in JPY Yields improved due to favorable traffic mix evolution 2016 2017LTM 2016-26e CAGR ● International pax providing high

  71. Slide 71: Kansai Airports – Transition and forecasted actions

    Slide 71: Kansai Airports – Transition and forecasted actions

    Kansai Airports – Transition and forecasted actions Transition Forecasted actions Post-transaction transition Extra-aeronautical activities: Increase profitability in commercial activities Successful transition from Grantor Terminal design deep optimisation Successful partnership with ORIX on a co-c

  72. Slide 72: Kansai Airports – Strategic considerations

    Slide 72: Kansai Airports – Strategic considerations

    Kansai Airports – Strategic considerations Traffic Tourism will continue to boost traffic growth (Asia, China, European rebound) Low Cost Carriers (LCCs), incl. new long haul, will continue to take market share on both domestic and international segments Still low propensity to fly compared to the c

  73. Slide 73: Focus on Last 2-Year Development: AERODOM (Dominican Republic)

    Slide 73: Focus on Last 2-Year Development: AERODOM (Dominican Republic)

    FOCUS ON LAST 2-YEAR DEVELOPMENT 2. VINCI Airports b. AERODOM (Dominican Republic)

  74. Slide 74: AERODOM – Overview

    Slide 74: AERODOM – Overview

    AERODOM – Overview Deal overview Map Acquisition of AERODOM by VINCI in April 2016 6 airports out of 9 in the Dominican Republic (incl. Santo Domingo) Remaining concession period: 12.5 years (31 March 2030) Held by Advent since 2008 VINCI share: 100% Acquisition price: € 365m (US$ 407m) Puerto Plata

  75. Slide 75: AERODOM – Deal structure

    Slide 75: AERODOM – Deal structure

    AERODOM – Deal structure Investment sources Equity: € 365m at 100% (USD 407m) Debt profile External debt: Fully refinanced in January 2017 Type Amount (max) Maturity Interest rate Variable Bank debt Bonds US$ 317m 12 years 6.75% 41% 41% Bank debt US$ 216m 7 years Libor(1) + 500bp Bonds Fixed 59% 59%

  76. Slide 76: AERODOM – Traffic

    Slide 76: AERODOM – Traffic

    AERODOM – Traffic Macroeconomics Traffic breakdown (2017) Dominican Republic is a dynamic country Traffic per origin Best in class in Caribbean Dom. Rep. 3rd fastest growing GDP in Latin America after Panama and Peru since Diaspora 20% 2000 ● GDP = c. 4.1% CAGR over next 10 years vs 2.9% for Latin A

  77. Slide 77: AERODOM – Performance Review

    Slide 77: AERODOM – Performance Review

    AERODOM – Performance Review Financial performance Management of performance Key figures at 100% Actions on traffic CAGR are computed with nominal data and in USD Develop the regional market and diversify US market (routes and players) 2016 2017LTM 2016-26e CAGR Attract more low cost carriers includ

  78. Slide 78: Focus on Last 2-Year Development: ADL (Lyon airports)

    Slide 78: Focus on Last 2-Year Development: ADL (Lyon airports)

    FOCUS ON LAST 2-YEAR DEVELOPMENT 2. VINCI Airports c. ADL (Lyon airports)

  79. Slide 79: ADL – Overview

    Slide 79: ADL – Overview

    ADL – Overview Deal overview Overview Finalisation of the acquisition of 60% of ADL on 9 November 2016 Consortium formed by VINCI Airports, Caisse des Dépôts and Crédit Agricole Assurances Remaining concession period: 30.5 years (31 December 2047) VINCI share in ADL: 30.6% Acquisition price: € 535m(

  80. Slide 80: ADL – Traffic

    Slide 80: ADL – Traffic

    ADL – Traffic Traffic Traffic per destination Dynamic traffic since 2016 Europe non Schengen Traffic growth x France GDP 9% 2016 +9.8% 8x Domestic International 33% 2017LTM +9.1% 5x 19% 2017: good performance of all airlines ● In particular HOP! Air France and EasyJet ● Rebound of traffic to North A

  81. Slide 81: ADL – Performance Review

    Slide 81: ADL – Performance Review

    ADL – Performance Review Financial performance Investment sources Key figures, consolidated amounts, 2016 proforma full year Equity consortium: c. € 400 m CAGR are computed with nominal data and in EUR VINCI share of equity injected in Lyon Participations: € 204m 2016 2017LTM 2016-26e CAGR External

  82. Slide 82: ADL – Transition and strategic considerations

    Slide 82: ADL – Transition and strategic considerations

    ADL – Transition and strategic considerations Operations Management and partnership Focus on extension CAPEX Management • Inauguration of new terminal T1 in October 2017 • Management (“Directoire”) of ADL composed by 3 members o Capacity: +4.5m pax • CEO and COO of ADL nominated by VINCI - New CEO f

  83. Slide 83: Focus on Last 2-Year Development: Salvador airport (Brazil)

    Slide 83: Focus on Last 2-Year Development: Salvador airport (Brazil)

    FOCUS ON LAST 2-YEAR DEVELOPMENT 2. VINCI Airports d. Salvador airport (Brazil)

  84. Slide 84: Salvador airport – Overview

    Slide 84: Salvador airport – Overview

    Salvador airport – Overview Concession key features Map Concession of Salvador airport (State of Bahia – Northern region) Auction won on 16 March 2017 (bid parameter: upfront concession fee) Concession signing date 28 July 2017 Effective date 1 September 2017 Operation start Beginning of January 201

  85. Slide 85: Salvador airport – Transition and construction

    Slide 85: Salvador airport – Transition and construction

    Salvador airport – Transition and construction Managing the transition Timeline of the Concession Agreement 30 years Signing Effective Date PTO(1) obtained Revenue recogn. End of Transition phase End of Construction phase I-B End of Construction phase I-C End of concession 28.07.2017 01.09.2017 23.1

  86. Slide 86: Salvador airport – Deal structure

    Slide 86: Salvador airport – Deal structure

    Salvador airport – Deal structure Leverage Concession fee mechanism Equity Annual concession fees Contractual equity injected at 30 September 2017: c. € 205m (BRL 706m) 5% of revenues generated over all concession period Remaining equity to be injected until 2019: c. € 82m(1) (BRL 306m) Contractual

  87. Slide 87: Salvador airport – Traffic

    Slide 87: Salvador airport – Traffic

    Salvador airport – Traffic Management of financial performance Traffic breakdown domestic vs international Recovery expected from 2017e: GDP to grow at c. 0.8% in 2017e(1) ; 2.3% in Domestic vs International pax 2018e(1) while inflation under control (c. 3.4% in 2017e(1)) International 4% Economic f

  88. Slide 88: Salvador airport – Financial performance

    Slide 88: Salvador airport – Financial performance

    Salvador airport – Financial performance Financial performance Key financials at 100% Extra-aeronautical revenues CAGR are computed with nominal data and in BRL Refurbish terminal to provide best standards (better offer and layout to 2016A 2017e 2016-26e CAGR deliver higher sales) Traffic (m pax) 7.

  89. Slide 89: Focus on Last 2-Year Development: VINCI Highways, LAMSAC / PEX

    Slide 89: Focus on Last 2-Year Development: VINCI Highways, LAMSAC / PEX

    FOCUS ON LAST 2-YEAR DEVELOPMENT 1. VINCI Highways a. LAMSAC / PEX

  90. Slide 90: LAMSAC - Overview

    Slide 90: LAMSAC - Overview

    LAMSAC - Overview Key project data Map LAMSAC consists of c. 25 km of expressways in the heart of Lima Jorge Chavez Int’l airport 16 km of existing toll roads Panamericana Norte 9 km of new toll roads connecting city center to the Airport and main port, and including a 2 km tunnel under the Rimac ri

  91. Slide 91: Lima and Peru - Macroeconomic trends

    Slide 91: Lima and Peru - Macroeconomic trends

    Lima and Peru - Macroeconomic trends Key fact about Lima’s metropolitan area Low motorisation rate in Peru 4th largest and one of the fastest growing cities in South America Number of vehicles per 1000 inhabitants, 2015 data Over 50% of Peru’s GNP (while 1/3 out of total population) Low rate in Peru

  92. Slide 92: LAMSAC - Project timeline

    Slide 92: LAMSAC - Project timeline

    LAMSAC - Project timeline 11/2009 2013 12/2016 2049 Concession Extension(1) of the Acquisition by End of signed concession (10y) VINCI (100%) concession 2010-13: Construction works 2013: Start of tolling Section 1 Since 08/2010: Construction works Q1 2018: Start of operations Section 2 Total equity

  93. Slide 93: LAMSAC - Traffic and financial performance

    Slide 93: LAMSAC - Traffic and financial performance

    LAMSAC - Traffic and financial performance Traffic and financial performance Performance analysis Data from statutory accounts, forecasts including section 2 CAGR are computed with nominal data and in PEN Decrease in 2017LTM traffic, impacted by: 2016-26e 2017 2015 2016(1) CAGR LTM Lower than expect

  94. Slide 94: LAMSAC - Key ongoing actions

    Slide 94: LAMSAC - Key ongoing actions

    LAMSAC - Key ongoing actions Ongoing actions Actions on OPEX “LAMSAC 2.0” and staff rationalizing ● Targeted number of staff in 2020 (post section 2 ramp-up) equal to the number at acquisition date Traffic expertise of VINCI Foster the increase in traffic by implementing ETC payments and traffic flo

  95. Slide 95: Focus on Last 2-Year Development: Bogota - Girardot

    Slide 95: Focus on Last 2-Year Development: Bogota - Girardot

    FOCUS ON LAST 2-YEAR DEVELOPMENT 1. VINCI Highways b. Bogota - Girardot

  96. Slide 96: Bogota Girardot - Overview

    Slide 96: Bogota Girardot - Overview

    Bogota Girardot - Overview Deal overview Map Shareholding 30-year concession awarded to project company VIA 40 in August 2016 VINCI: 50% Rehabilitation, operation and maintenance of a 145 km toll road Conconcreto: 50% Construction works VINCI has a 20% stake in Conconcreto since July 2015 Additional

  97. Slide 97: Bogota Girardot - Project timeline

    Slide 97: Bogota Girardot - Project timeline

    Bogota Girardot - Project timeline Contract execution is divided into 4 phases Maximum expected tenor of 30 years starting on the December 2016: 2016 2017 2018 2022 25 years of operations(1) c. 2046 2017: 2018-2022: 11/2022: 11/2046 Pré- Construction Expected completion of works End of Constr. conce

  98. Slide 98: Bogota Girardot - Transition and management facts

    Slide 98: Bogota Girardot - Transition and management facts

    Bogota Girardot - Transition and management facts Performance targeted by VINCI in 2026e Traffic (AADT): c. 55,000 Revenues: > COP 380bn EBITDA margin: > 75% Management New management established by VINCI Highways and Conconcreto ● CEO and COO nominated by VINCI Highways ● CFO and CTO appointed join

  99. Slide 99: Focus on Last 2-Year Development: Rest of the portfolio

    Slide 99: Focus on Last 2-Year Development: Rest of the portfolio

    FOCUS ON LAST 2-YEAR DEVELOPMENT 3. Rest of the portfolio

  100. Slide 100: Rest of the portfolio – Key figures

    Slide 100: Rest of the portfolio – Key figures

    Rest of the portfolio – Key figures Data as of 30.09.2017, excluding ADP In appendix, detailed investments in projects consolidated under the equity method ANA, LISEA, Santiago TOTAL Rest of concessions portfolio last 2-year development excl. holdings ANA LAMSAC Fully consolidated(1) Equity Method K

  101. Slide 101: Financial policy

    Slide 101: Financial policy

    ‘CONCESSIONS. Financial policy

  102. Slide 102: Key characteristics

    Slide 102: Key characteristics

    Key characteristics Traffic risk concessions Availability schemes Project company paid by users Project company paid by Grantor (availability Revenues Side revenues (retail, real estate,…) payments) Construction phase: construction risk transferred to contractor (« back-to-back » mechanism) Risks Op

  103. Slide 103: IRR, VINCI methodology

    Slide 103: IRR, VINCI methodology

    IRR, VINCI methodology Equity IRR target takes into account: 10-year risk-free rate Stock market risk premium Project long-term gearing Country risk premium Inflation differential between project country versus Eurozone / USA Activity-related beta Project related risks: ● Construction ● Traffic Proj

  104. Slide 104: Conclusion

    Slide 104: Conclusion

    ‘CONCESSIONS. CONCLUSION

  105. Slide 105: Concessions valuation by sell-side analysts at end of September 2017

    Slide 105: Concessions valuation by sell-side analysts at end of September 2017

    CONCESSIONS valuation by sell-side analysts at the end of September 2017 Enterprise Value In € billion (median)(1) Concessions valuation (median EV(1)) VINCI Autoroutes 36.6 as of 30 September 2017 ASF 25.8 5% Cofiroute 10.1 Arcour 0.8 23% VINCI Airports 11.8 o/w ANA 6.5 ADP 1.1 Kansai Airports 0.8

  106. Slide 106: Q&A Session

    Slide 106: Q&A Session

    ‘CONCESSIONS. Q&A SESSION

  107. Slide 107: Appendix

    Slide 107: Appendix

    VINCI ‘CONCESSIONS. APPENDIX

  108. Slide 108: Glossary

    Slide 108: Glossary

    Glossary The following definitions are applicable to the full presentation, unless otherwise stated Abbreviations 2017LTM From 01.10.2016 to 30.09.2017 2017YTD From 01.01.2017 to 30.09.2017 2016YTD From 01.01.2016 to 30.09.2016 EPC Engineering, Procurement and Construction O&M Operations and Mainten

  109. Slide 109: Exchange rate

    Slide 109: Exchange rate

    Exchange rate Based on internal data (annual cumulated average). Projected exchange rate from 2018e onwards are computed with Purchasing Power Parity (PPP) methodology 2015 2016 2017e BRL 3.70 3.86 3.59 CLP 726.06 748.48 732.03 COP 3045.11 3376.93 3328.30 JPY 134.31 120.20 126.45 PEN 3.53 3.74 3.69

  110. Slide 110: VINCI Airports

    Slide 110: VINCI Airports

    VINCI Airports 36 PROJECTS VINCI AIRPORTS VINCI Country Name Description End of concession Traffic risk Consolidation* share Phnom Penh Concession Cambodia Siem Reap Concession 2040 70% Yes FC Sihanoukville Concession Poitiers-Biard PSD** 2019 100% Yes FC Grenoble-Isère PSD** 2023 100% Yes FC Bretag

  111. Slide 111: VINCI Highways – Roads and motorways

    Slide 111: VINCI Highways – Roads and motorways

    VINCI Highways – Roads and motorways 23 PROJECTS (16 concessions and 7 operation or services companies(1)) VINCI HIGHWAYS Country Type Name Description End of concession VINCI share Traffic risk Consolidation* Road Infrastructure Motorway A4 Horselberg 45 km 2037 50% yes EM Germany Motorway A9 Thuri

  112. Slide 112: VINCI Highways – Bridges and Tunnel

    Slide 112: VINCI Highways – Bridges and Tunnel

    VINCI Highways – Bridges and Tunnel 7 PROJECTS VINCI HIGHWAYS (SUITE) End of VINCI Traffic Country Type Name Description Consolidation* concession share risk Bridges & Tunnels Tunnel Prado Carénage Road tunnel, Marseille 2025 33.3% yes EM France Tunnel Prado Sud Road tunnel, Marseille 2055 58.5% yes

  113. Slide 113: VINCI Railways and other projects

    Slide 113: VINCI Railways and other projects

    VINCI Railways and other projects 8 PROJECTS VINCI RAILWAYS VINCI Traffic Country Type Name Description End of concession Consolidation* share risk Rail Rhônexpress 23 km light rail system, Lyon 2038 35% yes EM Ground-train communication system on 14,000 km of Rail GSM-Rail 2025 30% no EM track Fran

  114. Slide 114: Non-controlling stakes in concessions

    Slide 114: Non-controlling stakes in concessions

    Non-controlling stakes in concessions Data in millions of euros, VINCI share, based on best estimations as of 30.09.2017 Projects consolidated by the equity method, excluding ADP Total Equity invested Equity equity committed at 30.09.17 to be invested Greece 141 140 1 Russia 130 106 24 Germany 113 1

Source: Internet Archive copy of vinci.com

More decks from Vinci SA

All 124 Vinci SA decks