Dragon Mining Limited · HKEX:1712
Dragon Mining — Melbourne Mining Club - Cutting Edge Series (November 2009)
30 slides from Dragon Mining's conference presentation, Nov 17, 2009

Slide 1: Dragon Mining Limited - Melbourne Mining Club
DRAGON MINING LIMITED Melbourne Mining Club - Cutting Edge Series 17 November 2009 The information in this presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Neale Edwards BSc (Hons), a Member of the Australian Institute of Geos

Slide 2: Disclaimer
Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company"). Unless otherwise stated herein, the information in this presentation is based on the Company Company's s own information and estimates. estimates This presentation does not cons

Slide 3: Scandinavian Gold Producer
Scandinavian Gold Producer Svartliden Gold Mine • 40,000 ounces per annum Vammala Production Centre • Orivesi 30,000 ounces • Jokisivu 10,000 ounces Unhedged from September 2009 Cash & bullion (30 Sep 09) $8.4m Produce 80,000 oz in 2010

Slide 4: Corporate Overview
Corporate p Overview I Issued d Capital C it l • Fully Paid Ordinary Shares 737.3m • Options (exercise prices 14c – 21c) 13.4m • Convertible Notes (Feb 2011) 11.8m • Market Capitalisation (13 Nov 2009) $60.0m Substantial Shareholder • Nicolas Mathys 130.4m 17.65% Australian Securities Exchange Code:

Slide 5: Corporate Overview - Directors
Corporate p Overview Directors Andrew Daley Mr Daley was appointed as a Non‐Executive Director on 2 March 2005 and Non‐Executive Chairman on 20 March 2006. He is a mining Non-Executive Chairman engineer and worked initially for Anglo American and Rio Tinto in Africa before moving to Australia. For t

Slide 6: Svartliden Gold Mine
Svartliden Gold Mine Location Dragon’s Dragon s Cash Engine

Slide 7: Svartliden Gold Mine
Svartliden Gold Mine Statistics to 30 September 2009 Project to Date Jan to Sep 2009 Ore Processed 1,399,703 t 249,980 t H dG Head Grade d 4 92 g/t 4.92 /t 3 88 g/t 3.88 /t Recovery 90.74 % 88.10 % Gold Produced 200,996 oz 27,494 oz • 2009 YTD Cash Cost US$574 1% 9% 35% Mi i Mining • 2009 YTD Sellin

Slide 8: Svartliden Gold Mine
Svartliden Gold Mine Transitioning from open pit to underground in 2010 Aug 08 Jan 09

Slide 9: Svartliden Gold Mine
Svartliden Gold Mine Mine Life extension Indicated 259,000 tonnes @ 7.2 g/t gold and d IInferred f d 53,000 53 000 tonnes t @ 6.8 6 8 g/t /t gold ld ffor 71 71,400 400 ounces.

Slide 10: Svartliden Gold Mine
Svartliden Gold Mine Conceptual Underground Development • 1 km underground exploration decline. • 100,000 tonne test mining. Mineralisation Open along strike ik Mineralisation Open at Depth

Slide 11: Svartliden Gold Mine
Svartliden Gold Mine Mine Corridor – Svartliden West • Svartliden S tlid WWestt area incorporates i t the immediate westerly strike extensions of Svartliden host sequence. q • Results returned low level gold anomalism, defining distinct geochemical trends up to 1,000 metres along strike. • Bedrock B

Slide 12: Svartliden Gold Mine
Svartliden Gold Mine Excavator Loading May 08 Aug 07

Slide 13: Svartliden Gold Mine
Svartliden Gold Mine Open Pit Apr 08 Oct 09

Slide 14: Svartliden Gold Mine
Svartliden Gold Mine Tailings Dam Jan 08 Oct 09

Slide 15: Finland
ORIVESI ' VAMMALA iE JOKISIVU KAAPELINKULMA Jokisi Gold Mine

Slide 16: Orivesi Gold Mine
Orivesi Gold Mine Statistics to 30 September 2009 Project to Date Jan to Sep 2009 Ore Processed 383,322 t 142,256 t H dG Head Grade d 6 18 g/t 6.18 /t 5 61 g/t 5.61 /t Recovery 84.20 % 84.20 % Gold Produced 63,741 oz 21,603oz 3% • YTD Cash Cost US$690 21% Mining • YTD Selling S lli Price Pi US$924 T

Slide 17: Orivesi Gold Mine
Orivesi Gold Mine Reserves Probable – 123,300 t @ 7.6 g/t Au 31,100 ounces Resources (Inclusive of Reserves) M Measured d 7979,500 500 t @ 66.9 9 g/t /t A Au Indicated 180,000 t @ 6.0 g/t Au Inferred 54,600 t @ 7.2 g/t Au Total 314,100 t @ 6.4 g/t Au 64,900 ounces Kutema Deeps Resources Indicated 31

Slide 18: Jokisivu Gold Mine
Jokisivu Gold Mine • Decline development to follow open cut. • Resource of 1,567,000t at 6.46 g/t - 324,000 oz. • Produce 3,000 ounces in 2009

Slide 19: Jokisivu Gold Mine
Jokisivu Gold Mine Underground Potential • Resource 1,576,000 tonnes @ 6.46 g/t / (324,000 ( ounces)) to 440 metres • Mineralisation to 525 metres

Slide 20: Kaapelinkulma Gold Project
Kaapelinkulma p Gold Project j • Resource of 161 161,000t 000t at 6 6.2 2 g/t - 32,000 oz. • Significant intercepts: 9.95m 9 95 att 46 46.28 28 g/t /t gold ld ffrom 67.10m 4.55 m at 13.80g/t gold from 13 80m 13.80m

Slide 21: Orivesi Gold Mine
Orivesi Gold Mine Decline Portal Dec 06 Aug 08

Slide 22: Orivesi Gold Mine
Orivesi Gold Mine Ore Loading for Transport to Vammala Aug 07

Slide 23: Jokisivu Gold Mine
Jokisivu Gold Mine Ore Loading Oct 09

Slide 24: Finland Exploration
Finland Exploration Dec 07 Jun 08

Slide 25: Production Project Pipeline
Production Project j Pipeline p 30 000 30,000 Kuusamo – Development Project █ Reserves (oz) █ Resources (oz)

Slide 26: DRA - 40 Percent Interest
DRA – 40 Percent Interest • Consolidation of all mineral rights g under one entity. y • Substantial metal inventories of chromium, iron and nickel f the for th development d l t off the th production of refined stainless alloys. • Access to proposed rail line to service Oakajee Industrial Estate and

Slide 27: DRA - 20 Percent Free Carried Interest
DRA – 20 Percent Free Carried Interest Zara Project - Eritrea • Koka Deposit – Indicated of 5 Mt at 5.8 g/t gold for 944,000 ounces. • Scoping Study results. • Annual production of 110,000 ounces att a cash h costt off US$424 an ounce. • Feasibility y Studyy to be completed by mid 2010.

Slide 28: Overview
Overview • Svartliden, Sweden and Vammala, Finland production centres • Unhedged gold producer • Strong potential to increase near mine reserves • Large resource inventory • Excellent exploration potential www.dragon-mining.com.au g g

Slide 29: Appendices - Gold Resource Inventory
Appendices Gold Resource Inventory as at 1 August 2009 Project Tonnes Gold (g/t) Gold (ounces) SVARTLIDEN Measured 171,700 3.3 18,500 Indicated 1,154,700 2.9 108,100 Inferred 280,000 3.3 29,300 Total 1,606,400 3.0 155,900 VAMMALA Measured 167,500 , 6.7 36,000 , Indicated 1,296,700 5.7 238,900 Inferr

Slide 30: Hanhimaa
Hanhimaa • Go d mineralisation Gold e a sat o within t strongly altered shear zone. • Aggressive exploration program included regional geochem sampling, trench sampling and diamond drilling. • The Kiimakuusikko area located approximately four kilometres south of the Kiimalaki-Kellolaki prospects and
Source: Internet Archive copy of dragonmining.com
More decks from Dragon Mining Limited
Shareholder Meeting (May 2026)24 slides · May 21, 2026
Shareholder Meeting (May 2026)24 slides · May 21, 2026
Investor Presentation (October 2025)16 slides · October 2025
PDAC 2016 Nordic Mining Day34 slides · March 2016
Investor Presentation (November 2015)28 slides · November 2015
Nordic Mining Days 201528 slides · Mar 2, 2015