Dragon Mining Limited · HKEX:1712
Dragon Mining — PDAC 2016 Nordic Mining Day
34 slides from Dragon Mining's conference presentation, March 2016
Slide 1: Dragon Mining: Established Nordic Gold Producer
Dragon Mining Established Nordic Gold Producer with Substantial Growth Opportunities PDAC 2016 Nordic Mining Day
Slide 2: Disclaimer
Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company"). Unless otherwise stated herein, the information in this presentation is based on the Company's own information and estimates. This presentation does not constitute or form any p
Slide 3: Competent Persons Statement
Competent Persons Statement The information in this presentation that relates to Mineral Resources for the Fäboliden Gold Project was previously released to the ASX on the 31 December 2015 – Maiden Mineral Resource for Fäboliden Gold Deposit and the information in this presentation that relates to t
Slide 4: Corporate
Corporate Issued Capital Board of Directors ASX Code DRA Arthur Dew Ordinary Shares 88.84m Non Executive Chairman Options Nil Brett Smith Executive Director 52 Week Trading Range A$ 0.12 – 0.23 Carlisle Procter Current Price (2 Mar 2016 - Open) A$ 0.165 Non Executive Director Market Capitalisation A
Slide 5: Dragon Mining Highlights
Dragon Mining Highlights • 2015 - 53,805 ounces of gold produced. Net Profit/Loss • Low C1 cash cost of US$ 917/oz (ounces sold). 10 • Improved safety performance. A$ million 0 -10 • LTIFR in December 2015 – 9.34. -20 • 2015 Net profit A$ 2.6 million and Debt Free. 2011 2012 2013 2014 2015 Year • St
Slide 6: Dragon Mining Highlights
Dragon Mining Highlights Production Centre - Mineral Resources Fäboliden has significantly increased Production Centre Mineral Resource base Combined Total - Svartliden and Vammala Mineral Resources Tonnage Gold Ounces (t) (g/t) (oz) 9,236,000 3.7 1,101,000 Measured Kaapelinkulma 8% Jokisivu 2% 20%
Slide 7: Dragon Mining Overview
Dragon Mining Overview Established Nordic Gold Producer Production • Svartliden and Vammala Production Centres • 2012 - 54,328 ounces (C1 cash cost US$ 1,095/oz) • 2013 - 64,482 ounces (C1 cash cost US$ 1,013/oz) • 2014 - 59,656 ounces (C1 cash cost US$ 952/oz) • 2015 - 53,805 ounces (C1 cash cost U
Slide 8: Group Synergies
Group Synergies CIL Processing of Gold Concentrates Benefits of leaching concentrates • Integrated approach allows greater higher gold recovery in the flotation plant. • No penalty fees from the smelter affecting the flotation process or concentrate processing. • Net savings achieved.
Slide 9: Svartliden Production Centre
Svartliden Production Centre Svartliden Gold Mine
Slide 10: Svartliden Production Centre
Svartliden Production Centre Svartliden Gold Mine and CIL Plant • Svartliden Production Centre has produced 387,670 ounces of gold to 31 December 2015. • Ore was processed through a conventional comminution and carbon in leach (CIL) plant with a design capacity of 300,000 tonnes per annum. • Plant r
Slide 11: Fäboliden Gold Project
De Faboliden Gold Project Dragon Mining
Slide 12: Fäboliden Gold Project: Acquisition
Fäboliden Gold Project Fäboliden Acquisition • Purchase Agreement completed. • Total consideration of 38 MSEK (~A$6.0M), includes Fäboliden Gold Deposit, ownership of 1,728 ha of land. • Land includes timber with market value of 18 to 20 MSEK. • Potential source of open-pittable feed for the Svartli
Slide 13: Fäboliden Gold Project: Acquired Assets
Fäboliden Gold Project Acquired Assets • 1,739.57 hectare project area that includes: Granted Fäboliden K nr 1 Exploitation Concession that hosts the Fäboliden Gold Deposit; and Four contiguous Exploration Permits that encompass the southwest strike extensions of the deposits host geological seq
Slide 14: Fäboliden Gold Project: 2015 Activities
Fäboliden Gold Project 2015 Activities • New drilling (34 holes, 2,941.50 metres) completed over 400 metre strike length of near surface high grade zone. • Series of significant intercepts returned including: 4.00 metres @ 20.70 g/t gold 7.00 metres @ 18.24 g/t gold 14.00 metres @ 11.05 g/t go
Slide 15: Fäboliden Gold Project: Maiden Mineral Resource
Fäboliden Gold Project Maiden Mineral Resource • Maiden Mineral Resource for the higher grade zone completed and reported in accordance with JORC 2012. • Totals 6,900,000 tonnes grading 3.3 g/t gold for 743,000 ounces. • Mineralised system is delineated over a strike length of 1,295 metres and inclu
Slide 16: Fäboliden Gold Project: Mining
Fäboliden Gold Project Mining • Deposit amenable to open pit mining, with potential for underground mining. • Maiden Ore Reserve near completion. • Conceptual design includes: Shallow starter (test) pit; Multiple final pits; Haulage from Fäboliden to Svartliden on existing all weather road net
Slide 17: Fäboliden Gold Project: Status
Fäboliden Gold Project Status Metallurgy Environmental • Limited historic leaching test work. • Preparation for a Test Mining Permit and new • Dragon Mining’s first phase of bench scale work Environmental Permit in progress. completed in 2014. • Company looking to develop an operation with a smaller
Slide 18: Vammala Production Centre
bagon WVammala Production Centre Mining
Slide 19: Vammala Production Centre
Vammala Production Centre • Vammala Production Centre Vammala Plant (Flotation) Orivesi Gold Mine Jokisivu Gold Mine Kaapelinkulma Gold Project Stormi Nickel-Copper Mine (Closed) • Since recommissioning in 2007, the Vammala Production Centre has produced 252,655 ounces of gold in concentra
Slide 20: Orivesi Gold Mine
Vammala Production Centre Orivesi Gold Mine • Orivesi Gold Mine first commenced production in 1992, yielding 422,000 ounces of gold to the end of 2003. • Dragon Mining recommenced mining in 2007, initially with the development of the Sarvisuo area and then the deepening of the Kutema area below the
Slide 21: Jokisivu Gold Mine
Vammala Production Centre Jokisivu Gold Mine • Jokisivu Gold Mine comprises two deposits – Kujankallio and Arpola. • Commenced production in September 2009. • Development is now at the 345m level at Kujankallio and 120m level at Arpola. • Mineral Resources are defined to the 350m level at Kujankalli
Slide 22: Jokisivu Gold Mine: Potential Depth Extensions
Vammala Production Centre Jokisivu Gold Mine – Potential Depth Extensions • Ground gravity survey, comprising four 2,500 metre profiles in the Jokisivu area provided encouragement that the dioritic intrusion, the host rock to the gold bearing quartz veins at Jokisivu, extends beyond current known de
Slide 23: Kaapelinkulma Gold Project
2. Kaapelinkulma Gold Project Dragon Mining
Slide 24: Kaapelinkulma Gold Project
Kaapelinkulma Gold Project • Potential third gold mine in the Vammala Production Centre area. • 65 km east of the Vammala Plant and accessible by existing road network. • Environmental Permit granted. • Material suitable for processing at the Vammala Plant. • Possible to develop the project in the n
Slide 25: Kaapelinkulma Gold Project: Status
Kaapelinkulma Gold Project Status Metallurgy Environmental Impact Assessment • Metallurgical test work has demonstrated • The Environmental Permit is valid. material is amenable to processing through conventional gravity and flotation circuit with • The Environmental Permit was issued on 15 total go
Slide 26: Kuusamo Gold Project
A Kuusamo Gold Project Dragon Mining
Slide 27: Kuusamo Gold Project: Overview
Kuusamo Gold Project Overview • Highly prospective region with potential to develop into significant gold mining camp. • Excellent infrastructure and potential local workforce. • Advanced exploration project, permitting and approval process still to be undertaken. • Five deposits containing a high q
Slide 28: Kuusamo Gold Project: Status
Kuusamo Gold Project Status Metallurgy Environmental Impact Assessment • Metallurgical test work has demonstrated • First Environmental Impact Assessment material is amenable to conventional report released in December 2013. comminution followed by flotation with gold • The report was not approved b
Slide 29: Northern Finland Exploration
Northern Finland Exploration Hanhimaa Gold Project • Agnico Eagle to earn up to 70% interest in the Hanhimaa Gold Project. Agnico-Eagle can spend €5 million over 6 years to earn a 51% interest and an additional €4 million over the following 3 years to earn a further 19%. • 41 drill holes, totaling 1
Slide 30: Dragon Mining Summary
Dragon Mining Summary • Established Production Centres in Sweden and Finland. • 2015 - 53,805 ounces of gold produced at a C1 cash cost of US$ 917/oz. • Second profitable year since appointment of new management and Board. • Net profit A$ 2.6 million in 2015 and Debt free. • Available cash: A$ 16.5
Slide 31: Dragon Mining Future
Dragon Mining Future • Fäboliden is a significant undeveloped gold project in the Nordic Region. • Kaapelinkulma is the only fully permitted, ready to go, new gold project in the Nordic Region. • Both projects can be developed without the need for new process plants. • Group synergies with the leach
Slide 32: For more information: www.dragonmining.com
For more information: www.dragonmining.com 32
Slide 33: Appendices
Appendices • Group Mineral Resource - 1 September 2015
Slide 34: Mineral Resources
Mineral Resources Gold (Inclusive of Ore Reserves) (2012 JORC Code) As at 1 September 2015 Measured Indicated Inferred Total Tonnes Gold Tonnes Gold Tonnes Gold Tonnes Gold Ounces Ounces Ounces Ounces (t) (g/t) (t) (g/t) (t) (g/t) (t) (g/t) Svartliden Production Centre Svartliden Gold Mine 97,000 3.