Dragon Mining Limited · HKEX:1712
Dragon Mining — Investor Presentation (October 2025)
16 slides from Dragon Mining's investor presentation, October 2025
Slide 1: Dragon Mining: Established Nordic Gold Producer
DRAGON MINING Established Nordic Gold Producer October 2025
Slide 2: Corporate
Corporate Issued Capital Board of Directors HKEX Code 1712 Mr. Arthur Dew (Chairman and Non-Executive Director) Ordinary Shares 189,715,935 Mr. Brett Smith (Chief Executive Officer ad Executive Director) Options Nil Ms. Lam Li (Non-Executive Director) 52 Week Trading Range HK$1.35 to HK$8.76 Mr. Car
Slide 3: Established Nordic Gold Producer
Established Nordic Gold Prodcuer • Active in the Nordic Region for 25 years. • Acquired a controlling interest in the Svartliden Gold Project in northern Sweden in 2000. • Commenced construction of the Svartliden CIL Plant in 2003. • Acquired Vammala Plant and suite of precious metals projects in Fi
Slide 4: Vammala Production Centre
Vammala Production Centre • Vammala Production Centre is located 160km north-east of the Finnish capital Helsinki. • Comprises the Vammala Plant, a 300kt per annum conventional crushing, milling and flotation facility, the operating Jokisivu Gold Mine, the Uunimäki Gold Project and the closed Orives
Slide 5: Jokisivu Gold Mine
Jokisivu Gold Mine • Gold mining gold operation located 40km southwest of the Vammala Plant. • Mining commenced in 2009 and by 30 June 2024 has generated 3.5 million tonnes grading 2.5 g/t gold from both open-pit and underground operations. • Represents a structurally controlled orogenic gold system
Slide 6: Jokisivu Gold Mine: Exploration
Jokisivu Gold Mine Exploration • Recent drilling in the historically underexplored southeastern area of the Jokisivu deposit returned a series of outstanding high-grade intercepts from the Flying Squirrel area, in close proximity to existing underground development. • Intercept highlights include: –
Slide 7: Svartliden Production Centre
Svartliden Production Centre • Svartliden Production centre is located in northern Sweden, 700km north of Stockholm and in close proximity to the regional town Lycksele. • Svartliden Production Centre comprises the Svartliden CIL Plant, Svartliden Gold Mine and Fäboliden Gold Mine. • Situated within
Slide 8: Svartliden CIL Plant
Svartliden CIL Plant • The Svartliden Plant is a conventional carbon-in-leach facility that was constructed in 2003/2004 as part of an integrated operation at Svartliden. • Facility generates gold dorè, which is then provided to an external group for refining. • Operating capacity of 300 kt per annu
Slide 9: Svartliden Gold Mine
Svartliden Gold Mine • Svartliden Gold Mine commenced operation as an open-pit mine in 2004, with underground mining commencing in 2011. Mining was completed in November 2013 and processing of final marginal grade ore in 2015. • Operation produced 377 kozs of gold from 3,182 kt @ 4.1 g/t gold and an
Slide 10: Svartliden Gold Mine
® & = eS fe) O Cc ® ES i © > 7)
Slide 11: Fäboliden Gold Mine
Fäboliden Gold Mine • Acquired 100% interest in 2015. • Significant undeveloped gold project in the Nordic region. • Located 30km by road southeast of the Svartliden CIL Plant. • 1,676 hectare project area, includes granted Exploitation Concession that fully encompasses the Fäboliden Gold Deposit an
Slide 12: Fäboliden Gold Mine
Fäboliden Gold Mine • Geological datasets collected from exploration activities undertaken since 1993. • Represents an orogenic gold deposit, hosted by Paleoproterozoic meta-sediments and meta-volcanic rocks. • Located within a north-south trending reverse, mainly dip-slip, high-angle shear zone. •
Slide 13: Fäboliden Gold Mine
Fäboliden Gold Mine • Open-pit Ore Reserve 10 years mine life, derived from a Life of Mine (“LOM”) study to a pre-feasibility level. • The study is based on the establishment of an open pit mining operation and the haulage of ore to Dragon Mining’s operating Svartliden CIL Plant. • Mine designs were
Slide 14: Fäboliden Gold Mine: Near Mine Potential
Fäboliden Gold Mine Exploration - Near Mine Potential • Project area of 1,676.69 hectares secures ca. 6km of the host geological sequence. • Geophysical and geochemical coverage: ➢ Geophysics – magnetics, EM, radiometrics. High resolution, flight line spacing 75 and 125 metres and nominl flight alti
Slide 15: Resources & Reserves: Group Mineral Resources
Resources & Reserves Group Mineral Resources – 1 May 2025 Group Mineral Resources (Inclusive of Ore Reserves) Tonnes Grade Ounces Measured 850,000 3.6 99,000 Indicated 8,000,000 2.8 710,000 Inferred 6,100,000 3.3 650,000 Total 15,000,000 3.0 1,500,000 MINERAL RESOURCE OUNCES Jokisivu 260 kozs Kaapel
Slide 16: Resources & Reserves: Group Ore Reserves
Resources & Reserves Group Ore Reserves – 1 May 2025 Group Ore Reserves Tonnes Grade Ounces (kt) (g/t gold) (kozs) Proved 300 2.5 24 Probable 4,200 2.8 380 Total 4,500 2.8 400 Group Ore Reserve Tonnes Group Ore Reserve Ounces 5000000 500000 4000000 400000 Ounces Ounces 3000000 300000 2000000 200000