Esgold Corp · CSE:ESAU

Esgold — Investor Presentation (August 2025)

23 slides from Esgold's investor presentation, Aug 26, 2025

  1. Slide 1: ESGold Corp. Q3 2025

    ESGOLD ESGOLD CORP. * Q32025 °¢ www.esgold.com

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS

  3. Slide 3: Business Overview

    BUSINESS OVERVIEW ESGold is a uniquely positioned Canadian gold company advancing near-term cash-generating production while unlocking blue-sky exploration upside. Fast-Track to Revenue Fully permitted tailings project with a modular plant design, targeting near term gold-silver recovery. ESG-Driven

  4. Slide 4: Management Team, Directors, Strategic Advisors

    MANAGEMENT TEAM DIRECTORS STRATIGIC ADVISORS

  5. Slide 5: Share Structure

    SHARE STRUCTURE Institutional Management Public Float Friends and Affiliates

  6. Slide 6: Bolivar, Colombia

    BOLIVAR, COLOMBIA Decentralized Gold Production with Artisanal Miners in Colombia

  7. Slide 7: Bolivar Colombia: Corporate Strategy

    BOLIVAR COLOMBIA Corporate strategy artisanal mining district in Bolivar, Colombia. Currently, >>) Establishing Roots: Build a gold ore mill in the prolific there is no mill in the area servicing local miners. » Tailings and Profit: Process and decontaminate high grade on-site tailings left behind b

  8. Slide 8: Bolivar Colombia Highlights

    BOLIVAR COLOMBIA . . PLNINI~ Highlights ARR Access to Gold Ore: Close relationships with nearby Resource Size / Future Growth: A recent $1.5 million concession owners with operating mines. Over study and mine inventory has identified extensive 300 tpd of high-grade gold ore (18gpt +) within 20km res

  9. Slide 9: Bolivar Colombia Location

    BOLIVAR COLOMBIA Location Dozens of small mines in the area. Ideal for artisanal operations but not large commercial operations. Bolivar South has been mined for hundreds of years, yet mines continue to produce at similar grades and exploration work continues to discover gold. Estimate of 3000 tpd o

  10. Slide 10: Bolivar Colombia Geology

    BOLIVAR COLOMBIA Southern Bolivar, Colombia area holds great potential to find a multimillion oz. Au deposit. The extent of the deposit is still being discovered. A 2017 study confirmed grades from 1.5 to 37 gpt from 12-15 veins with mining history. Values in the 7 main veins range between 10-40 gpt

  11. Slide 11: Montauban Project

    PPI PII ' _ / - Hf hi ~~ iM) | ~—o fei a , a ’ . ¢ | MONTAUBAN mY é . . ae ee < y , Tle sie

  12. Slide 12: The Montauban Project Site

    THE MONTAUBAN PROJECT SITE The property is located approximately 80 km west of Quebec City and 60 km north of Trois- Riviéres, in the Montauban Township in the Portneuf County, Quebec

  13. Slide 13: The Montauban Site Opportunity

    THE MONTAUBAN SITE OPPORTUNITY

  14. Slide 14: Montauban Mine Past Production

    MONTAUBAN MINE PAST PRODUCTION

  15. Slide 15: Tailings Mineral Resources at Montauban – PEA 2023

    TAILINGS MINERAL RESOURCES AT MONTAUBAN – PEA 2023

  16. Slide 16: Drilling at Montauban

    DRILLING AT MONTAUBAN Sas A =| i The drill hole database contained 352 valid drill hole oh mete | | uct ao collars, with a total meterage of 1,654.04m and 1,170 wee oem | assay intervals totaling 1,498.05m. waepiseaoes cocznetas ‘ & MS Sn eres tee For the Notre-Dame-de-Montauban tailings a total of

  17. Slide 17: Surface Pilar Resource Evaluation – Historical Report

    SURFACE PILAR RESOURCE EVALUATION – HISTORICAL REPORT

  18. Slide 18: Near Surface Hard Rock Results - Map

    NEAR SURFACE HARD ROCK RESULTS - MAP

  19. Slide 19: Exploration Thesis: Broken Hill–Style Geology at Montauban

    EXPLORATION THESIS: BROKEN HILL–STYLE GEOLOGY AT MONTAUBAN » » » »

  20. Slide 20: The Lassonde Curve: Dual-Track Strategy at Montauban

    THE LASSONDE CURVE : DUAL-TRACK STRATEGY AT MONTAUBAN

  21. Slide 21: Work Completed to Date by ESGold

    WORK COMPLETED TO DATE BY ESGOLD

  22. Slide 22: Value Drivers

    VALUE DRIVERS MONTAUBAN - ROAD TO PRODUCTION Production-Ready Asset: Fully permitted plant under construction with tailings reprocessing set to deliver near-term cash flow. Infrastructure Advantage: Existing mill, power, and road access sharply reduce capex and execution risk. term production; surfa

  23. Slide 23: Corporate Directory

    S ESGOLD CORPORATE DIRECTORY Gordon Paul Tony Robb Mastantuono Giuliano CEO coo CFO 1 250 217-2321 1514 712-1532 1514 241-9161 gordon@esgold.com paul@esgold.com info@esgold.com ESGold Corp. > _—Z

ESGold — Investor Presentation (August 2025) on 6ix