Esgold Corp · CSE:ESAU

Esgold — Investor Presentation (March 2026)

21 slides from Esgold's investor presentation, March 2026

  1. Slide 1: Montauban Gold-Silver Project

    CSE: ESAU OTCQB: ESAUF FSE: Z7D MONTAUBAN GOLD-SILVER PROJECT A fully permitted, fully funded tailings to cash operation in Québec, Canada. Advancing toward near-term gold and silver production from historic tailings while advancing district-scale exploration potential

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking

  3. Slide 3: Why ESGold Now?

    WHY ESGOLD NOW? ESGold offers a high-return, fully funded tailings Strong, predictable cash-flow beginning in 2026 reprocessing opportunity in Canada, with meaningful district-scale exploration upside. Fully funded to commissioning and first gold production The Montauban project is driven by a large

  4. Slide 4: Leadership Team

    LEADERSHIP TEAM ESGold is led by a team with deep operating, engineering, and capital markets experience in Canada’s mining sector. Collectively, the team brings decades of execution across permitting, construction, and mine operations: critical capabilities for a reprocessing project entering its p

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE As of December 2025 5% 8% 57% Issued & Outstanding 98,975,002 Friends & Affiliates Options Outstanding 3,812,000 Institutional Warrants 32,244,688 Management Fully Diluted Issued 135,031,690 & Outstanding Public Float 30% CSE: ESAU | OTCQB: ESAUF | FSE: Z7D 4

  6. Slide 6: Montauban Project

    MONTAUBAN PROJECT Fully permitted and fully funded, targeting production in 2026 Mill building completed for 1000 ton/day processing capacity Montauban is a fully permitted, fully funded tailings reprocessing project designed to produce Integrated 3D model identifies a mineralized corridor gold, sil

  7. Slide 7: Montauban Mine Past Production

    MONTAUBAN MINE PAST PRODUCTION 1913-1944* 1948-1955* 1983-1990† tons zinc 77,000 39,600 - tons lead 24,000 15,600 - oz. gold 40,000 16,876 92,553 oz. silver 4,000,000 2,647,517 323,376 * Source : Jean Depatie for Boiville Ressources Ltd † Source : Genivar Inc. for MRNQ Ancon Shaft Entrance CSE: ESAU

  8. Slide 8: Infrastructure & Construction Status

    20,000 SQ FT modular processing facility INFRASTRUCTURE & CONSTRUCTION STATUS 1.3 KM Of service hydropower Mill building completed and project advancing toward commissioning. Current capacity rated for 1000 tons per day. ALL-WEATHER Roads & site access FULLY PERMITTED For construction & operation CS

  9. Slide 9: Location

    LOCATION Located in Montauban Township, near Québec City and 80 km from Québec City Proximity to skilled labour Trois-Rivières, the project benefits from the following 60 km from Trois-Rivières Mining-friendly jurisdiction points. This combination enables one of the most cost effective reprocessing

  10. Slide 10: Drilling & QAQC Completed

    DRILLING & QAQC COMPLETED Comprehensive drilling and verification work has been completed across the tailings zones. This dataset forms the basis for the 2025 NI 43-101 resource estimate and supports high confidence in tonnage and grade distribution. 352 drillholes 1,654 m total drilling 1,170 sampl

  11. Slide 11: Tailings Resource Summary

    TAILINGS RESOURCE SUMMARY The 2025 PEA defines a significant gold and silver resource within the Montauban tailings. Process the mine tailings in Notre-Dame-de-Montauban This inventory underpins the project’s near-term production profile and cash-flow potential. Effective Date: September 2025 Stop w

  12. Slide 12: Tailings Mineral Resources at Montauban – PEA 2025

    TAILINGS MINERAL RESOURCES AT MONTAUBAN – PEA 2025 The mineral resources estimate for the Montauban and Notre-Dame-de-Montauban Tailings Au (g/t) Ag (g/t) Tonnes Au Oz Ag Oz MONTAUBAN TAILINGS Indicated 0.4 31 603,700 7,800 610,350 Inferred 0.34 28 292,000 3,150 258,900 NOTRE-DAME-DE-MONTAUBAN TAILI

  13. Slide 13: Surface Pillar Resource Evaluation – Historical Report

    SURFACE PILLAR RESOURCE EVALUATION – HISTORICAL REPORT Pillars contain documented Limited Modern Exploration high-grade mineralization The Montauban deposit and surrounding Historical evaluations reported gold and silver surface pillars have not been evaluated using grades in both the North and Sout

  14. Slide 14: ESG and Full Cycle Value Creation

    ESG AND FULL CYCLE Montauban is designed as a tailings-to-products model that recovers precious metals while supporting VALUE CREATION environmental remediation and circular resource reuse. Environmental Remediation at the Core Montauban addresses legacy tailings from historic mining activity in the

  15. Slide 15: 3D ANT Model Confirms District-Scale Upside at Montauban

    3D ANT MODEL CONFIRMS DISTRICT- SCALE UPSIDE AT MONTAUBAN ESGold has completed an integrated 3D geological model combining Ambient Noise Tomography (ANT) imaging with historical drilling and mine data, revealing a deeper and more extensive mineralized system than previously understood. Key Takeaways

  16. Slide 16: Exploration Thesis and District Scale Land Position

    EXPLORATION THESIS The district surrounding Montauban hosts numerous past-producing zones but remains AND DISTRICT SCALE largely underexplored for gold, as historic operators focused on silver and base metals. LAND POSITION District-Scale Opportunity Expanded Land Package Montauban is located within

  17. Slide 17: Parallel-Phase Strategy

    PARALLEL-PHASE STRATEGY Tailings production provides near-term revenue potential while supporting exploration funding and minimizing dilution risk. PHASE 1 PHASE 2 Bring Montauban tailings into production and District-scale exploration program guided by establish meaningful, recurring cash flow. int

  18. Slide 18: Work Completed to Date

    All major permits secured Plant and infrastructure largely installed WORK COMPLETED TO DATE Resource verification and metallurgical testing complete ESGold has invested over $15M into developing Montauban. The project is fully Integrated 3D geological model completed de-risked and on track for commi

  19. Slide 19: Economics & Catalysts

    PEA ECONOMIC HIGHLIGHTS: ECONOMICS • 105% IRR (pre-tax) & CATALYSTS • $44.5M NPV (5%) pre-tax • <2-year payback • Strong margins driven by low energy and operating costs Tailings production provides near-term revenue potential while supporting exploration • Expanded ANT survey (~70 km²) and drill ta

  20. Slide 20: Investment Highlights

    INVESTMENT HIGHLIGHTS Near-term cash flow beginning in 2026 District-scale exploration upside now defined Fully permitted tailings production provides a clear path to early revenue. Integrated 3D ANT modelling identifies a deep expanding mineralized corridor extending ~900 metres depth and over 2 ki

  21. Slide 21: Contact Us

    MONTAUBAN GOLD-SILVER PROJECT CONTACT US Tel: +1 (514) 712-1532 Tel: +1 (888) 370-1059 info@esgold.com www.esgold.com CSE: ESAU OTCQB: ESAUF FSE: Z7D

ESGold — Investor Presentation (March 2026) on 6ix