ESGold Corp · CSE:ESAU
ESGold — Investor Presentation (November 2026)
21 slides from ESGold's investor presentation, November 2026

Slide 1: Montauban Gold-Silver Project
CSE: ESAU OTCQB: ESAUF FSE: Z7D M O N TA U B A N G O L D - S I LV E R P R O J E C T A fully permitted, fully funded tailings to cash operation in Québec, Canada. Advancing toward near-term gold and silver production from historic tailings while advancing district-scale exploration potential November

Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking

Slide 3: Why ESGold Now?
WHY ESGOLD NOW? ESGold offers a fully funded tailings Near-term cash flow potential from the tailings reprocessing opportunity in Canada, with operation meaningful district-scale exploration upside. Fully funded to commissioning and first gold/silver production The Montauban project is driven by a l

Slide 4: Leadership Team
LEADERSHIP TEAM ESGold is led by a team with deep operating, engineering, and capital markets experience in Canada’s mining sector. Collectively, the team brings decades of execution across permitting, construction, and mine operations: critical capabilities for a reprocessing project entering its p

Slide 5: Capital Structure
CAPITAL STRUCTURE As of Sept 2026 30 25% Friends & Affiliates % Issued & Outstanding 111,521,090 Family Offices Options Outstanding 5,494,000 Institutional Warrants 38,072,971* Management Fully Diluted Issued 155,088,007 & Outstanding Public Float 7% Avg Warrant Price: ~$0.72 30 8% % CSE: ESAU | OTC

Slide 6: Montauban Project
MONTAUBAN PROJECT Fully permitted and fully funded through to first doré pour Mill building completed for 1000 ton/day processing capacity Montauban is a fully permitted, fully funded tailings reprocessing project designed to Updated 3D geological model across ~70 km², built produce gold, silver, an

Slide 7: Location
LOCATION Located in Montauban Township, near Québec City and 80 km from Québec City Proximity to skilled labour Trois-Rivières, the project benefits from the following 60 km from Trois-Rivières Mining-friendly jurisdiction points. This combination enables one of the most cost effective reprocessing

Slide 8: Infrastructure & Land Package
INFRASTRUCTURE & LAND PACKAGE 20,000 SQ FT processing facility and laboratory 1.3 KM Mill building completed and project Of service hydropower advancing toward commissioning. Current capacity rated for 1000 tons per day. ALL-WEATHER Roads & site access ESGold holds a land position of 541 claims cove

Slide 9: Montauban Mine Past Production
MONTAUBAN MINE PAST PRODUCTION 1913-1944* 1948-1955* 1983-1990† tons zinc 77,000 39,600 - tons lead 24,000 15,600 - oz. gold 40,000 16,876 92,553 oz. silver 4,000,000 2,647,517 323,376 * Source : Jean Depatie for Boiville Ressources Ltd † Source : Genivar Inc. for MRNQ Anacon Shaft Entrance CSE: ESA

Slide 10: Tailings Drilling
TAILINGS DRILLING Comprehensive drilling and verification work has been completed across the tailings zones. This dataset forms the basis for the 2025 NI 43-101 resource estimate and supports high confidence in tonnage and grade distribution. 352 drillholes 1,654 m total drilling 1,170 sampled inter

Slide 11: Tailings Mineral Resources at Montauban – PEA 2025
TAILINGS MINERAL RESOURCES AT MONTAUBAN – PEA 2025 The mineral resources estimate for the Montauban and Notre-Dame-de-Montauban Tailings Au (g/t) Ag (g/t) Tonnes Au Oz Ag Oz MONTAUBAN TAILINGS Indicated 0.4 31 603,700 7,800 610,350 Inferred 0.34 28 292,000 3,150 258,900 NOTRE-DAME-DE-MONTAUBAN TAILI

Slide 12: Tailings Resource Summary
TAILINGS RESOURCE SUMMARY The 2025 PEA defines a significant gold and silver resource within the Montauban tailings. Process the mine tailings in Notre-Dame-de-Montauban This inventory underpins the project’s near- term production profile and cash-flow potential. Effective Date: September 2025 Stop

Slide 13: Surface Pillar Resource Evaluation – Historical Report
SURFACE PILLAR RESOURCE EVALUATION – HISTORICAL REPORT Pillars contain documented Limited Modern Exploration high-grade mineralization The Montauban deposit and surrounding Historical evaluations reported gold and silver surface pillars have not been evaluated using grades in both the North and Sout

Slide 14: First ANT Model Defined Scale, New Model Sharpens Targeting
FIRST ANT MODEL DEFINED SCALE NEW MODEL SHARPENS TARGETING The first 3D ANT model showed the system could extend far beyond the historic mine. The August 2026 update adds more data to determine where follow-up drilling should focus. WHAT THE FIRST MODEL UNCOVERED It outlined an interpreted corridor

Slide 15: Exploration and Drilling Program
EXPLORATION AND DRILLING PROGRAM ESGold has drilled approximately 4,074 metres of its planned 5,000 metre surface diamond drilling program, more than 80% complete (news release, October 20, 2026). Assays are pending. Drilling Program Underway Approximately 5,000 metres of surface diamond drilling 29

Slide 16: Parallel Phase Strategy
PARALLEL PHASE STRATEGY Tailings production offers near term revenue potential while supporting exploration funding and minimizing dilution risk. THE CLASSIC LASSONDE CURVE SIMULTANEOUS DISCOVERY AND PRODUCTION Dashed line: classic Lassonde curve VALUE Drilling confirms VALUE Plant built, limited CA

Slide 17: Work Completed to Date
All major permits secured Building completed and major processing equipment arriving and being integrated WORK COMPLETED Resource verification and metallurgical testing complete TO DATE ESGold has invested over $20M into Expanded land package secured developing Montauban. The project is immediately

Slide 18: Economics & Catalysts
PEA ECONOMIC HIGHLIGHTS: ECONOMICS • 105% IRR (pre-tax) & CATALYSTS • $44.5M NPV (5%) pre-tax • <2-year payback • Strong margins driven by low energy and operating costs Tailings production provides near-term revenue potential while supporting exploration • ANT survey (~70 km²) completed, 5,000 m dr

Slide 19: ESG and Full Cycle Value Creation
ESG AND FULL CYCLE Montauban is designed as a tailings-to-products model that recovers precious metals while supporting VALUE CREATION environmental remediation and circular resource reuse. Environmental Remediation at the Core Montauban addresses legacy tailings from historic mining activity in the

Slide 20: Investment Highlights
INVESTMENT HIGHLIGHTS Near-term cash flow District-scale exploration upside now being tested Fully permitted tailings production provides a clear path to early revenue. An updated 3D geological model across approximately 70 km² ranks priority corridors for follow-up. More than 4,000 metres of a 5,00

Slide 21: Contact Us
M O N TA U B A N G O L D - S I LV E R P R O J E C T CONTACT US Tel: +1 (514) 712-1532 Tel: +1 (888) 370-1059 ir@esgold.com www.esgold.com CSE: ESAU OTCQB: ESAUF FSE: Z7D
Source: company website
More decks from ESGold Corp
Investor Presentation (November 2026)21 slides · November 2026
Investor Presentation (October 2026)21 slides · Oct 12, 2026
Investor Presentation (March 2026)19 slides · March 2026
Investor Presentation (March 2026)21 slides · March 2026
Investor Presentation (December 2025)19 slides · December 2025
Investor Presentation (October 2025)18 slides · October 2025