RPX Gold · TSXV:RPX

RPX Gold — Red Pine Exploration — Investor Presentation (April 2024)

17 slides from RPX Gold's investor presentation, April 2024

  1. Slide 1: Wawa Gold Project: Exploration Success Leading to Resource Growth

    Wawa Gold Project Exploration Success Leading to Resource Growth APRIL 2024

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement The information in this presentation has been prepared as at 18th April 2024. This presentation, the information contained herein, any other materials provided in This information contained in this Presentation is connection with this presentation and any oral remarks accom

  3. Slide 3: Exploration Success Focused on Expanding the RPX Resource

    Exploration Success Focused on Expanding the RPX Resource 100% owned Wawa Gold Project Highly prospective claim block hosting numerous historical mines and untested targets, Continued drill success which are currently not being within and around the drilled Jubilee Shear defining a potential hybrid o

  4. Slide 4: Prolific Gold District in a Trusted Jurisdiction

    Prolific Gold District Producers continue investing heavily in a Trusted Jurisdiction within the vicinity of our property Influx of Activity in the Region 2017 Alamos acquires Richmont (Island) for US$770M 2019 Alamos announces strategic 19.9% investments in Red Pine Exploration and Manitou Gold Timmi

  5. Slide 5: Wawa Gold Project

    Historical production of 120,093 oz @ 9.04 g/t gold rED Pine’s Wawa Gold Project Hwy 101 Ontario, Canada Town of Wawa McMurray Township, 2 km southeast of Location the Town of Wawa, Ontario Historic Mines Surluga Main Highways 7,000+ hectares with 122 patents / Size leases and 302 mining claims Site

  6. Slide 6: Geology of the Wawa Gold Project

    JUBILEE STOCK Geology of the Wawa Gold Project Large and Many periods of Resources1 currently multi-dimensional gold deposition estimated in only 2 gold system centered • Intrusion-related gold of the geological on the Jubilee Shear system (IRGS) structures forming • Hosted in an intrusive the gold

  7. Slide 7: Drill program focused on a resource update in 2024

    Surluga Drill program focused on a Deposit resource update in 2024 Current resources1 are: Minto Mine 1. underground constrained Deposit 2. shallowly defined – 95% of total resources within 350m from surface 3. metallurgical study determined average gold Jubilee Shear recoveries > 90% Fault Surluga M

  8. Slide 8: Drill program focused on an updated resource in 2024

    Areas of focus Drill program focused on an updated resource in 2024 • Approximately 70,000 metres of diamond drilling expected to contribute to a resource expansion • Above the existing resource – Focus on the potential to reduce the ultimate stripping ratio and maximizing the size of a pit-constrai

  9. Slide 9: Selection of significant results expected to contribute to the updated resource

    Selection of significant results expected to contribute to the updated resource Within the Jubilee and Minto shears, and the Surluga North Vein Network 9.57/10.95 3.80/36.94 10.43/12.95 68.71/3.45 5.46/10.51 8.46/6.42 11.19/2.61 10.92/28.05 2.01/27.26 5.13/37.47 8.01/32.95 70.9/1.14 7.67/5.89 11.06/

  10. Slide 10: Selection of significant results above the Jubilee and Minto shears

    Selection of significant results above the Jubilee and Minto shears 2.64/25.61 Gold Grades* Mi Sadowski Vn 52.12/2.29 > 10.0 g/t Au nt 5.0 - 10.0 g/t Au oS 13.95 / 4.48 2.5 - 5.0 g/t Au he 1.0 – 2.5 g/t Au ar 0.5 - 1.0 g/t Au 0.2 - 0.5 g /t Au ea rs • Gold grade cut-off at 0.2 g/t o C sh 5.06/13.28 •

  11. Slide 11: Continuing drilling program beyond the planned resource

    Continuing drilling program beyond the planned resource 1. Hanging wall of the Jubilee Shear above the northern part of the 2021 resource 2. Intrusion-related gold system and Core Shack vein network west of the Jubilee Shear 3. Northern extension of the Jubilee Shear and Surluga North Vein Network 4

  12. Slide 12: 6 km Corridor Beyond the Resource Expansion at Surluga and Minto

    6 km Corridor Beyond the Resource Expansion at Surluga and Minto SD-21-310 lt au ll F 9.30 g/t Au over 3.08 m i kh Including r Pa 25.95 g/t Au over 0.95 m 3.37 g/t Au over 2.00 m 8.10 g/t Au over 3.00 m HS-15-31 10.78 g/t Au over 2.00 m 25.73 g/t Au over 4.00 m 5.76 g/t Au over 8.35 m RV-18-182 79.7

  13. Slide 13: Capital Structure

    Key Shareholders Capital Structure (CAD) (Approximate values) * As of April 2024 13.5% 0.6% Alamos Management 20% 65.9% Institutional Retail/Other Basic Shares Outstanding 190.7M Options (avg. $0.49) 7.5M Key institutional investors Warrants (avg. $0.24) 19.8M Research Fully Diluted Shares Outstandi

  14. Slide 14: Environment and Social Responsibility

    Environment and Social Responsibility Strong Community Support Ongoing Environmental Ongoing consultation with First Nations Baseline Work and the Town of Wawa Water sampling, tailing pond monitoring and drill site remediation Permitting Framework ESG Reporting Published In Place Red Pine Exploratio

  15. Slide 15: Red Pine Management

    Red Pine Management Effective on or before July 19, 2024 * michael Jean-François Eric Carrie Michaud Montreuil Josipovic Howes CEO & DIRECTOR VP EXPLORATION CFO & CORPORATE SECRETARY DIRECTOR CORPORATE COMMUNICATIONS P.Geo., M.Sc. P.Geo. Ph.D CPA, CA Professional Geologist with over 30 Over 13 years

  16. Slide 16: Red Pine Board of Directors

    Red Pine Board of Directors Drew Rachel Paul Michael Gary Anwyll Goldman Martin Michaud O’Connor DIRECTOR DIRECTOR CHAIRMAN and Interim CEO DIRECTOR DIRECTOR P.Eng, M.Eng. CDID.D CPA, CA P.Geo., M.Sc. P.Geo. FAusIMM Mining engineer with Over 20 years of experience Executive with more than 30 Profess

  17. Slide 17: Contact Us

    Contact Us Carrie Howes Director Corporate Communications chowes@redpineexp.com 416-644-7375 Corporate Office REDPINEEXP.COM 145 Wellington Street West Suite 1001 Toronto, ON M5J 1H8 Canada Redpineexp.com | Tsx-v: RPX | OTCQB:RDEXP 17

Red Pine Exploration — Investor Presentation (April 2024) on 6ix