RPX Gold · TSXV:RPX

RPX Gold — Investor Presentation (February 2026)

17 slides from RPX Gold's investor presentation, Feb 19, 2026

  1. Slide 1: Wawa Gold Project Investor Call

    Wawa Gold Project Moving Towards Gold Production Investor Call RPXGOLD.COM | TSX-V: RPX | OTCQB:RDEXF FEBRUARY 2026

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement The information in this presentation has been prepared as of February 18h, 2026. This presentation, the information contained herein, any other materials provided in connection with this presentation and any oral remarks accompanying this presentation (collectively, the “Pr

  3. Slide 3: On the Call Today - Management Team

    On the Call Today - Management Team Michael Jean-François Eric Manish Eric Michaud Montreuil Josipovic Grigo Steffler CEO, DIRECTOR VP EXPLORATION CFO & CORPORATE CORPORATE DEVELOPMENT SENIOR OPERATIONS P.Geo., M.Sc. P.Geo. Ph.D SECRETARY MBA, CFA MANAGER CPA, CA B.Sc. Professional Geologist with Ov

  4. Slide 4: Wawa Gold Project – Opportunity

    Wawa Gold Project – Opportunity High margin Low capital spend Low risk entry, production at US to leverage the high starting with open $3,500 gold price gold price pit production and above 81% of gold Self funding Short timeframe to production coming opportunity for the complete a PFS on from Indica

  5. Slide 5: Wawa Gold Project – PEA Results

    Wawa Gold Project – PEA Results 67,000 koz/yr IRR 99.7% Payback < 1yr Over a 9 year mine life After tax at US$3,500/oz at US $3,500/oz gold and 181% at US Exploration upside price and above $4,500/oz $523 mil NPV5% ~$51 mil capex US$2,149/oz ASIC At US $3,500/oz. U/G capex starts in Yr 2 High margin

  6. Slide 6: Sensitivity – After Tax

    Sensitivity – After Tax 2,450 2,975 3,500 4,025 4,550 Gold Price US$/oz (Base -30%) (Base -15%) (Base) (Base +15%) (Base +30%) NPV @ 5% C$M $86 $305 $523 $739 $955 IRR % 19% 58% 100% 143% 185% Payback Period years 5.5 3.2 0.9 0.7 0.5 Every US$100/oz change in Gold price impacts NPV by ~C$41.1M REDPI

  7. Slide 7: Prolific Gold District

    Prolific Gold District With Growing Regional Activity 2017 Alamos acquires Richmont (Island) for US$770M 2019 Alamos announces strategic 19.9% investments in RPX Gold 2022 Silver Lake Resources acquires Harte Gold Corp (C$102M) Alamos acquires Magino mine for C$325M Vault Minerals merges with Silver

  8. Slide 8: Wawa Gold Project

    Wawa Gold Project Brownfield Project with Excellent Infrastructure 5 mills within trucking distance McMurray Township, 2 km southeast of Location the Town of Wawa, Ontario, Canada 7,000+ hectares with 123 patents / Size leases and 307 mining claims All weather road, Access access from highway 101 Br

  9. Slide 9: 2026 Resource Estimate

    2026 Resource Estimate Category Resource Tonnes Au (g/t) Au (oz) Indicated Open Pit 22,378,000 1.65 1,190,000 Underground Indicated 531,000 3.16 54,000 Resource Upgrade drilling successfully increased the indicated resource ounces by 48% Total 22,909,000 1.69 1,244,000 Indicated Inferred Open Pit 7,

  10. Slide 10: Longitudinal View - Open pit and Underground mine plan

    Longitudinal View - Open pit and Underground mine plan North pit South pit CN tower Gold (g/t) > 20.0 2026 MRE block model displayed Au > 0.80 g/t 10.0 to 20.0 5.0 to 10.0 2.0 to 5.0 0 300 Existing underground development of 13kms reduces need for 1.0 to 2.0 meters development capital. 0.8 to 1.0 AZ

  11. Slide 11: Production Highlights

    Production Highlights Units Open Pit Underground Annual Gold Recovered Yrs 1-3 Yrs 3-9 Operating Units Material Processed (LOM) Mt 2.1 4.5 Material Processed – Annual Mt/yr 0.70 0.73 Average 3 Gold grade (LOM average) g/t Au 2.4 3.6 Gold recovery (LOM average) % 88 88 Annual gold, Annual Average3 ko

  12. Slide 12: Capital costs

    Capital costs Annual Capital Profile Item Cost Estimate1 (C$M) Initial Capital Costs Mining $15.3 Processing $7.6 Power & Utilities $1.0 Infrastructure $14.2 Contingency $11.4 Royalty Buyback $1.8 Total Initial Capital1 $51.2 Sustaining and Closure Capital Costs Underground, Development $61.8 Underg

  13. Slide 13: Cash flow – Financial Highlights

    Cash flow – Financial Highlights Gold Price – US$ $3,500 $4,500 Exchange Rate – C$/US$ 1.35 1.35 Annual Accumulative Cash Flow Profile (US$3500/oz of Gold) Life of Mine - years 9 9 All amounts in million C$ unless otherwise specified Average Annual After -Tax Free Cash Flow1 $85 $145 Pre-Tax Net Pre

  14. Slide 14: Site Layout

    Site Layout REDPINEEXP.COM | TSX-V: RPX | OTCQB:RDEXP 14 RPXGOLD.COM | TSX-V: RPX | OTCQB:RDEXF

  15. Slide 15: Exploration Upside

    Exploration Upside Beyond the PEA mine plan Parkhill Fault Jubilee Shear S. Extension Jubilee Shear N. Extension Indications of gold mineralization over South side moved 1.80 km down and Cooper Vein Field Surface 15.39/0.80 5.81/1.49 24.34/0.34 16.56/0.61 4.73/1.45 25.60/0.79 -300 m 7.03/2.11 Y106 d

  16. Slide 16: 2026 Next steps

    2026 Next steps ● Advance toll milling discussions to a Letter of Intent ● Continue resource expansion and conversion drilling ● Conduct additional metallurgical test work ● Move toward a PFS ● Continue Baseline studies, and permitting efforts ● Continue First Nations Consultation and discussions ●

  17. Slide 17: Contact Us

    Contact Us Michael Michaud Manish Grigo CEO & Director Corporate Development mmichaud@rpxgold.com (Consultant) 416-364-7024 mgrigo@rpxgold.com 416-569-3292 Corporate Office 372 Bay Street, Suite 1702 Toronto, ON M5H 2W9, Canada REDPINEEXP.COM | TSX-V: RPX | OTCQB:RDEXP 17 RPXGOLD.COM | TSX-V: RPX |

RPX Gold — Investor Presentation (February 2026) on 6ix