Odyssey Gold Limited · ASX:ODY

Odyssey Gold — Investor Presentation (September 2022)

11 slides from Odyssey Gold's investor presentation, Sep 28, 2022

  1. Slide 1: Exceptional Results at Highway Solidify Tuckanarra Gold Projects Future

    EXCEPTIONAL RESULTS AT For personal use only HIGHWAY SOLIDIFY TUCKANARRA GOLD PROJECTS FUTURE Company Presentation | Q3 2022 | ASX: ODY 1

  2. Slide 2: Highway Zone Has Classic Murchison Potential

    Highway Zone Has Classic Murchison Potential Highway Zone has the depth and strike potential to add significant scale For personal use only 2022 drilling has defined a significant new structure at the Highway Zone with strike and depth potential to add significant scale • 300m long and open along st

  3. Slide 3: Highway Zone Target – Grade and Scale

    Highway Zone Target – Grade and Scale For personal use only Highway Zone Open Pit Target • Mineralised shoot: • 300m long and open along strike • 10-20m wide (true width) @ 2-9g/t Au • drilled to 200m and open down dip • 5 of 8 RC holes >25 gram metres Highway Zone Underground Extension • 6 holes in

  4. Slide 4: Highway Zone – 300m Long Mineralised Shoot defined

    Highway Zone – 300m Long Mineralised Shoot defined For personal use only 5 of 8 holes >25 gram metres - High grade with scale 300m long mineralised shoot continuous to 200m below surface 4

  5. Slide 5: Substantial Open Pit Oxide Potential Drilled in 2022

    Substantial Open Pit Oxide Potential Drilled in 2022 For personal use only APortfolio portfolioof advanced targets advanced, of shallow shallow, quality quality oxide oxide mineralisation mineralisation targetsand andhigh-grade high-gradeshoots. shoots 5

  6. Slide 6: Significant Oxide Mining Potential

    Significant Oxide Mining Potential 1km laterite mineralisation blanket along Cable-Bollard trend For personal use only Thick oxide mineralisation at surface Low-cost processing options available including trucking to nearby mills 6

  7. Slide 7: Large Scale Early-stage Targets

    Large Scale Early-stage Targets For personal use only Greenstone Target Initial focus on 8km of the 18km long Singleton Formation greenstone between the Stakewell and Tuckanarra projects where folding for greenstones coincides with regional fault flexure. The Highway Greenstones are largely unexplor

  8. Slide 8: Strategy to Add Value

    Strategy to Add Value For personal use only Staged Exploration and Development Approach 1 Drill the along strike and underground extensions of the Highway Zone Targeting several compelling extensions of the five historical high grade (3.4g/t) pits 2 at Tuckanarra - substantial exploration success al

  9. Slide 9: Board & Management with a proven track record

    Board & Management with a proven track record For personal use only CAPITAL STRUCTURE BOARD OF DIRECTORS ODY SHARES ON ISSUE 612.43M Ian Middlemas – Chairman Highly regarded Chairman and resources executive. Mr Middlemas is currently the Chairman of a PRICE (as at 16/09/2022) A$0.037 number of publi

  10. Slide 10: Disclosures & disclaimers

    Disclosures & disclaimers IMPORTANT INFORMATION For personal use only This presentation has been prepared by Odyssey Gold Ltd (“Odyssey Gold” or the “Company”). This presentation is for information purposes only and should not be considered as an offer or invitation to subscribe for or purchase any

  11. Slide 11: For personal use only

    For personal use only ASX: ODY Level 9, 28 The Esplanade, Perth WA 6000 For further information, please contact: T: +61 8 9322 6322 E: info@odysseygold.com.au Matt Briggs, Managing Director +61 8 9322 6322 www.odysseygold.com.au

Odyssey Gold — Investor Presentation (September 2022) on 6ix