Odyssey Gold Limited · ASX:ODY
Odyssey Gold — Investor Presentation (March 2026)
19 slides from Odyssey Gold's investor presentation, Mar 2, 2026
Slide 1: Excellent Gold Development & Exploration Potential in the Prolific Murchison Region
For personal use only Excellent Gold Development & Exploration Potential in the Prolific Murchison Region Company Presentation • March 2026 ASX: ODY • ODYSSEY GOLD LTD ABN 73 116 151 636
Slide 2: Investment Highlights
Investment Highlights NEAR TERM DEVELOPMENT POTENTIAL AND COMPELLING EXPLORATION UPDSIDE High quality gold exposure in a leading jurisdiction The Murchison is a globally recognized mining jurisdiction For personal use only with proven endowment and ongoing discovery Near term production potential Es
Slide 3: 2026 Work Programs
2026 Work Programs PURSUING A FAST TRACK DEVELOPMENT PATHWAY − Well funded for aggressive work programs following recent $9 million placement, including $2.2m investment by Tribeca Investment Partners − Drill rigs remobilising imminently For personal use only ➢ RC rig for remaining infill drilling a
Slide 4: Multiple processing options for high-grade, oxide gold ore
Multiple processing options for high-grade, oxide gold ore TUCKANARRA PROJECT - For personal use only - ASX: ODY • ODYSSEYGOLD. COM. AU 04
Slide 5: Near Term Development Potential
Near Term Development Potential FAST TRACK DEVELOPMENT PATHWAY WITH NO MAJOR IMPEDIMENTS TUCKANARRA PROJECT - Initial high-grade Mineral Resource of 407,000oz (5.14Mt @ For personal use only 2.5g/t) - Mostly on granted Mining Leases around historical mined pits - Majority laterite, oxide and transit
Slide 6: Burnakura Mill Access Agreement
Burnakura Mill Access Agreement - Non-binding MOU with JV partner, Monument Mining Ltd (TSX.V:MMY), to access their Burnakura Processing Plant For personal use only - Burnakura is on care and maintenance and located only about 30km east of Tuckanarra, with existing haul roads - It is permitted for 2
Slide 7: Progress since $4m Placement
Progress since $4m Placement in June 2026 - Over 10,000m RC and diamond drilling completed For personal use only ➢ Outstanding infill results supporting existing resources ➢ Outstanding exploration results add new mineralisation and targets - Metallurgical testwork completed, validating high histori
Slide 8: Highway Zone Resource Drilling
Highway Zone Resource Drilling EXCELLENT RESULTS REINFORCE OPEN PIT MINING POTENTIAL − 19m @ 13.7g/t Au from 61m (CBRC0250) − 14m @ 13.6g/t Au from 158m (CBRC0227) For personal use only − 7m @ 16.5g/t Au from 170m and 3m @ 5.9g/t from 160m (CBRC0229) − 7m @ 7.7g/t Au from 97m (CBRC0249) − 10m @ 3.8g
Slide 9: Cable Pit Resource Drilling
Cable Pit Resource Drilling RESULTS TYPICAL OF HIGH -GRADE HIGH NUGGET MINERALISATION − 22m @ 2.8g/t Au from 6m (CBRC0179) − 9m @ 4.7g/t Au from 44m (CBRC0177) For personal use only − 15m @ 2.3g/t Au from 38m (CBRC0182) − 7m @ 8.3g/t Au from 83m (CBRC0175) − 18m @ 4.3g/t Au from 7m (CBRC0178) − 11m
Slide 10: Exploration Results – Cable HW and Bollard
Exploration Results – Cable HW and Bollard DRILLING EXTENDED THE CABLE HW STRUCTURE AND THE MINERALISATION AT BOLLARD Cable West Hanging Wall structure: For personal use only − 20m @ 7.1g/t Au from 47m (CBRC0199) − 8m @ 3.4g/t Au from 63m (CBRC0266) − 7m @ 2.8g/t Au from 158m (CBRC0268) − 5m @ 3.7g/
Slide 11: Mining Study Confirms Development Advantages
Mining Study Confirms Development Advantages - Conceptual Mining Study supports the potential development of Tuckanarra and processing at an expanded Burnakura Processing Plant For personal use only - Scoping Study under way to formalise and publish outcomes - Simple cutbacks and expansion of existi
Slide 12: Tuckanarra Project Exploration
Tuckanarra Project Exploration FIVE SHALLOW OPEN PITS MINED IN THE 1990’S For personal use only CABLE MAYBELLE BOLLARD KOHINOOR BOTTLE DUMP ASX: ODY • ODYSSEYGOLD. COM. AU 01 2
Slide 13: Tuckanarra Project Exploration
Tuckanarra Project Exploration INITIAL FOCUS WAS ON DRILLING KNOWN DEPOSITS - Odyssey focused initially on understanding the known shallow deposits and nearby extensions – eg Highway Zone For personal use only - Mineral Resource of 5.14Mt @ 2.5g/t for 407,000oz. Based on over 82,000m of drilling. Cu
Slide 14: Further Potential Between the Pits and in Mineralised Structures to the West
Further Potential Between the Pits and in Mineralised Structures to the West - The Cable Bollard Highway mineralisation has to date been interpreted as 2 sub vertical parallel structures defined over 1.5km from North of the Cable pit through Bollard to the newly discovered Highway deposit For person
Slide 15: Tuckanarra Project
Tuckanarra Project VTEM AND DRILLING INDICATE POTENTIAL CONTINUATION For personal use only 2m @ 10.3g/t 10m @ 2.1/t 7.65m @ 11.8g/t 2m @ 4.1/t Two recent deeper holes targeting the VTEM modelled conductors support potential continuation of the main Cable “tram track” mineralisation between the exist
Slide 16: Corporate Overview
Corporate Overview BOARD OF DIRECTORS BOARD & MANAGEMENT WITH A PROVEN TRACK RECORD CAPITAL STRUCTURE (PRO -FORMA AFTER PLACEMENT ) ODY SHARES ON ISSUE (pro forma)1 1,413m Ian Middlemas – Chairman Highly regarded Chairman and resources executive with over 35 years experience in the Australian gold F
Slide 17: Mineral Resource Estimate
ADDITIONAL MATERIAL Mineral Resource Estimate (Odyssey share 80%) Mining Tonnes Gold Ounces Deposit Category Tenure Method (Mt) (g/t) (kOz) Indicated Pit 0.15 3.4 17 E20/783 Bottle Dump Inferred Pit 0.76 2.2 54 Including: For personal use only Total 0.91 2.4 70 Indicated Pit 0.15 1.9 9 M20/527 • 2.2
Slide 18: Disclosures & Disclaimers
IMPORTANT INFORMATION Disclosures & Disclaimers IMPORTANT INFORMATION COMPETENT PERSONS STATEMENT This presentation has been prepared by Odyssey Gold Ltd (“Odyssey Gold” or the “Company”). This presentation is for information The information in this presentation that relates to Mineral Resources is
Slide 19: Contact
ASX: ODY • ODYSSEY GOLD LTD For personal use only Level 9, 28 The Esplanade, Perth WA 6000 T: +61 8 9322 6322 E: info@odysseygold.com.au For further information, please contact: Matt Syme, Executive Director T: +61 8 9322 6322 www.odysseygold.com.au