Odyssey Gold Limited · ASX:ODY

Odyssey Gold — Investor Presentation (July 2026)

21 slides from Odyssey Gold's investor presentation, July 2026

  1. Slide 1: Odyssey Sets Sail

    Odyssey Sets Sail Strong Near Term Cashflow & Brownfields Exploration Potential Company Presentation • July 2026 ASX: ODY • ODYSSEY GOLD LTD ABN 73 116 151 636

  2. Slide 2: Investment Highlights

    Investment Highlights HIGH MARGIN, LOW CAPEX, NEAR TERM CASHFLOW WITH COMPELLING EXPLORATION UPDSIDE High-quality gold exposure in a leading jurisdiction The Murchison is a globally recognized mining jurisdiction with proven endowment and ongoing discovery Near term production and cashflow potential

  3. Slide 3: Tuckanarra and Toll Treating are a (near) Perfect Match

    Tuckanarra and Toll Treating are a (near) Perfect Match WHY TUCKANARRA? WHY TOLL TREATMENT? • Simple geology • Speed to production • Low risk open pit mining • Minimal capex • Excellent metallurgy • Outstanding returns at current A$ gold • Permitting allows early development • Low risk starter pit •

  4. Slide 4: Great Location in a Famous Gold District

    TUCKANARRA PROJECT Great Location in a Famous Gold District - Surrounded by over 10Mt of processing capacity ASX: ODY • ODYSSEYGOLD. COM. AU 04

  5. Slide 5: Tuckanarra Project History

    TUCKANARRA PROJECT HISTORY Shallow shafts in the gold rush, followed by five shallow open pits mined in the 1990’s CABLE MAYBELLE BOLLARD KOHINOOR BOTTLE DUMP SHACKLE WORKINGS ASX: ODY • ODYSSEYGOLD. COM. AU 05

  6. Slide 6: Shallow historical drilling just scratched the surface

    Shallow historical drilling just scratched the surface 06 Odyssey drilled out an initial resource of 451,000oz @ 2.2g/t, to the top of fresh rock around the old pits.

  7. Slide 7: Excellent Outcomes from Stage 1 Scoping Study

    Excellent Outcomes from Stage 1 Scoping Study LOW CAPEX, HIGH MARGIN, FAST TRACK DEVELOPMENT Production CAPEX A$ Mine life 29 months Grade control drilling $2m LOM gold mined 87,000oz Mining camp $2m LOM gold recovered 79,000oz Other mine establishment $2m Metallurgical recovery 95% and mobilisation

  8. Slide 8: Stage 1 Development Plan

    Stage 1 Development Plan FAST TRACK DEVELOPMENT POSSIBLE • Cable deposit all within M20/527 • Waste dumps etc all on ML’s • Initial mining under existing approved Mining Proposal • Extinguished Native Title • No known heritage or environmental impediments • NVCP application lodged April. No objectio

  9. Slide 9: Stage 1 Pit Design

    Stage 1 Pit Design Simple, Shallow Open Pit Mining Weathering Tonnes Percentage Oxide 1,000,000 74% Transitional 272,000 20% Fresh 75,000 6% Total 1,348,000 100% ASX: ODY • ODYSSEYGOLD. COM. AU 09

  10. Slide 10: Stage 1 Pit Design

    Stage 1 Pit Design Low risk with 83% of production target Indicated. ASX: ODY • ODYSSEYGOLD. COM. AU 10

  11. Slide 11: Stage 1 Toll Processing at Kirkalocka

    Stage1 Toll Processing at Kirkalocka FASTEST PATHWAY TO DEVELOPMENT AND CASHFLOW • Kirkalocka is adjacent to the Great Northern Highway, 191km south of Tuckanarra. Last operated in 2022. • Gylden Resources plans to refurbish the carbon-in-leach (“CIL”) plant to handle a range of fresh and oxidised o

  12. Slide 12: Stage 2 Scoping Study will address full 451,000oz resource base

    Stage 2 Scoping Study will address full 451,000oz resource base The Stage 2 Scoping Study already underway will address longer term potential from the other Tuckanarra resources, based on on-site treatment costs. • Stage 1 mines only 55% of the Cable resource, based on toll treatment processing cost

  13. Slide 13: Exploration Upside and Strategy

    Exploration Upside and Strategy - The Tuckanarra goldfield has been mined since the 1890’s. - The geology comprises a sequence of greenstones, intruded by granite. Deformation has formed in an anticline hinge, typically a very fertile environment for structural deformation, fluid flow and gold enric

  14. Slide 14: Consistent, high-grade oxide & primary gold

    Consistent, high-grade oxide & primary gold - The Cable-Bollard-Highway mineralised zone is defined over 2.3km from north of the Cable pit through Bollard to the Highway deposit. - Considerable shallow oxide mineralisation remains unmined around and between the pits - Fresh primary mineralisation, i

  15. Slide 15: Shackle example

    Shackle example The Shackle target was a series of shallow goldrush era shafts extending over 80m of strike, on a parallel structure 500m north of the Cable deposit. A single fence of historical RAB holes was drilled, with one hole intersecting 8m @1.1g/t and ending in mineralisation. Odyssey drille

  16. Slide 16: Bollard example

    Bollard example The Bollard pit mined a high grade shoot down to the water table in the 1990’s. Odyssey drilling has extended that deposit down to primary mineralisation with excellent grade and continuity. The current resource extends to around 150m below surface. A modelled open pit captures resou

  17. Slide 17: Development Pathway

    Development Pathway Stage 1 – mine Cable starter pit, toll treat Cable starter pit only Stage 2 – other deposits , on-site plant? 600kt+ toll treatment at Stage 3 – add mine life Kirkalocka → cashflow Stage 2 Scoping Study due Q426, based on: 1 year with 1 year option Extend mine life by adding - Fu

  18. Slide 18: Corporate Overview

    Corporate Overview BOARD OF DIRECTORS BOARD & MANAGEMENT WITH A PROVEN TRACK RECORD CAPITAL STRUCTURE (PRO -FORMA AFTER PLACEMENT ) ODY SHARES ON ISSUE 1,413m Ian Middlemas – Chairman SHARE PRICE 16 July 2026 A$0.03 Highly regarded Chairman and resources executive with over 35 years experience in th

  19. Slide 19: Mineral Resource Estimate

    Mineral Resource Estimate (Odyssey share 80%) Mining COG Tonnes Ounces Deposit Category Gold (g/t) Method (Au g/t) (Mt) (kOz) Anchor Inferred Pit 0.9 0.09 2.6 7 Indicated Pit 0.9 0.15 3.4 17 Bottle Dump Inferred Pit 0.9 0.76 2.2 54 Includes: Total 0.9 0.91 2.4 70 Indicated Pit 0.9 0.15 1.9 9 • 5.4Mt

  20. Slide 20: Disclosures & Disclaimers

    IMPORTANT INFORMATION Disclosures & Disclaimers IMPORTANT INFORMATION COMPETENT PERSONS STATEMENT This presentation has been prepared by Odyssey Gold Ltd (“Odyssey Gold” or the “Company”). This presentation is for information The information in this presentation that relates to Production Targets, P

  21. Slide 21: Odyssey Gold Ltd contact details

    ASX: ODY • ODYSSEY GOLD LTD Level 9, 28 The Esplanade, Perth WA 6000 T: +61 8 9322 6322 E: info@odysseygold.com.au For further information, please contact: Matt Syme, Executive Director www.odysseygold.com.au

Odyssey Gold — Investor Presentation (July 2026) on 6ix