Tasman Resources Ltd · ASX:TAS

Tasman Resources — Shareholder Meeting (November 2009)

19 slides from Tasman Resources's shareholder meeting presentation, Nov 20, 2009

  1. Slide 1: Presentation to AGM 20th November 2009

    Slide 1: Presentation to AGM 20th November 2009

    Presentation to AGM 20th November 2009

  2. Slide 2: Tasman Group Corporate Overview

    Slide 2: Tasman Group Corporate Overview

    Tasman Group Corporate Overview Tasman Resources Ltd Minerals Cu, Au, U, Ag, (TAS) Pb, Zn, Ni , Oil Shale 18.1%* 28.6%* Eden Energy Ltd Fission Energy Ltd (EDE) (FIS) 100% Hydrogen & Hythane 50% 50% Pyrolysis Mt Thirsty Co-Ni 50% Coal Bed Methane 100% 100% SA Natural Gas Uranium – SA, WA 100% Geothe

  3. Slide 3: Tasman Resources: Project Locations

    Slide 3: Tasman Resources: Project Locations

    Tasman Resources: Project Locations Julia Creek: Oil Shale Mirrica: Au, Cu/Zn/Pb Lake Torrens: IOCGU Parkinson Dam: Au/Ag/Zn/Pb Central Gawler: Au, Ni Streaky Bay: U

  4. Slide 4: Lake Torrens Project

    Slide 4: Lake Torrens Project

    Lake Torrens Project • New IOCGU system discovered at Vulcan in November 2009. Large untested anomaly (>10km2) • Over 2,000 km2 of tenements adjacent to Olympic Dam • IOCGU mineralisation at Titan (inc. 334m @ 0.1% Cu) • Untested targets at Marathon Sth, Zeus, Billy Barnes, Atlas

  5. Slide 5: Lake Torrens Project: Targets

    Slide 5: Lake Torrens Project: Targets

    Lake Torrens Project: Targets

  6. Slide 6: Lake Torrens Project

    Slide 6: Lake Torrens Project

    = 2) a bl see = i A. WN) i co) I =) a o =< ne) — / a / fi — Lake Torrens Tasman Resources Tenements

  7. Slide 7: Bouguer Gravity Comparison

    Slide 7: Bouguer Gravity Comparison

    Bouguer Gravity Comparison Vulcan Carapateena VUD 001

  8. Slide 8: Vulcan: S-N Seismic Reflection Profile

    Slide 8: Vulcan: S-N Seismic Reflection Profile

    Vulcan: S-N Seismic Reflection Profile S SHD 1 VUD 001 N Cover Sediments Basement Strong Seismic Reflectors in Basement – IOCGU? Geoscience Australia – PIRSA 2003 Traverse OD 1

  9. Slide 9: Olympic Dam: W-E Seismic Reflection Profile

    Slide 9: Olympic Dam: W-E Seismic Reflection Profile

    Olympic Dam: W-E Seismic Reflection Profile W E Cover Sediments Basement Seismic Reflectors in Basement (Olympic Dam Breccia Complex, SE limb) Geoscience Australia – PIRSA 2003 Traverse OD 2

  10. Slide 10: Vulcan Drill Core: VUD

    Slide 10: Vulcan Drill Core: VUD

    Vulcan Drill Core: VUD 001 NQ Drill Core: depth approx. 928m

  11. Slide 11: Vulcan Drill Core: VUD

    Slide 11: Vulcan Drill Core: VUD

    Vulcan Drill Core: VUD 001 NQ Drill Core: depth approx. 933m NQ Drill Core: depth approx. 1077m

  12. Slide 12: Vulcan Project: The Way Forward

    Slide 12: Vulcan Project: The Way Forward

    Vulcan Project: The Way Forward • Geological review and synthesis: VUD 001 – Assays, rock chemistry, petrology & physical properties (density, magnetic sus.) • Geophysical data assessment, detailed gravity surveying, modelling • Data synthesis. Apply enhanced IOCGU deposit model to Vulcan based on n

  13. Slide 13: Parkinson Dam Gold – Silver Project

    Slide 13: Parkinson Dam Gold – Silver Project

    Parkinson Dam Gold – Silver Project

  14. Slide 14: Parkinson Dam – High Grade Mineralisation

    Slide 14: Parkinson Dam – High Grade Mineralisation

    Parkinson Dam – High Grade Mineralisation • PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Classic epithermal veining • Gold (electrum ~ 35% Ag) • PD 64: 3m @ 18.1% Pb, 1.1% Zn, 44.2g/t Ag • Epithermal mineralisation > 4.5 km2

  15. Slide 15: Parkinson Dam: Recent Drilling

    Slide 15: Parkinson Dam: Recent Drilling

    Parkinson Dam: Recent Drilling

  16. Slide 16: Parkinson Dam: High Grade Au/Ag plus Zn/Pb

    Slide 16: Parkinson Dam: High Grade Au/Ag plus Zn/Pb

    Parkinson Dam: High Grade Au/Ag plus Zn/Pb PD 63 - high grade Au/Ag Multiple Zones of thick Zn/Pb (Ag), e.g. *50m @ 0.9% Zn, 0.3% Pb *185m+ @ 0.3% Zn, 0.1% Pb Vector pointing towards higher grades to be drilled

  17. Slide 17: Julia Creek Oil Shale Project, Qld

    Slide 17: Julia Creek Oil Shale Project, Qld

    Julia Creek Oil Shale Project, Qld • EPM Applications 1800km2 over Toolebuc Formation • Shallow, potentially open-pittable areas selected • Reported conventional oil shale yields 65-75 l/t • Xtract developing higher yielding hydrogenation process

  18. Slide 18: Competent Person's Statement

    Slide 18: Competent Person's Statement

    Competent Person’s Statement The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith and Michael Glasson who are Members of the Australian Institute of Geoscientists. Robert Smith and Michael Glasson are full-time emplo

  19. Slide 19: Disclaimer

    Slide 19: Disclaimer

    Disclaimer The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of probabilities and, howeve

Source: Internet Archive copy of tasmanresources.com.au

More decks from Tasman Resources Ltd

All 44 Tasman Resources decks