Camino Minerals Corporation · TSXV:COR
Camino Minerals — Investor Presentation (January 2023)
39 slides from Camino Minerals's investor presentation, January 2023
Slide 1: Camino Corp. January 2023
CAMINOCORP.COM TSX.V : COR | OTCQB : CAMZF | WKN: A116E1 JANUARY 2023 1
Slide 2: Cautionary Notes and Forward-Looking Statements
Cautionary Notes and Forward-Looking Statements This document has been prepared by Camino Minerals Corporation (the “Company”) for evaluation of the Company by the recipient. The information contained in this presentation is derived from estimates made by the Company, information that has been provi
Slide 3: Maria Cecilia, Los Chapitos, Plata Dorada
3 MARIA CECILIA LOS CHAPITOS PLATA DORADA New Resource Potential and Existing Resource and Discovery High-Grade Vein System Discovery Drilling in a Major IOCG Drilling in a Major Porphyry System System
Slide 4: We own 100% of all our projects
4 We own 100% of all our projects.
Slide 5: Environmental and Social Governance
5 ENVIRONMENTAL AND SOCIAL GOVERNANCE
Slide 6: Our Commitment to ESG
6 OUR COMMITMENT TO ESG Camino Corp. is dedicated to developing our projects to bring sustainable and long-lasting social and economic benefits for the host communities and all stakeholders. We engage in meaningful consultation and honest dialogue with representatives of the communities surrounding
Slide 7: Camino's Commitment: Maria Cecilia vs Antamina
MARIA CECILIA VS ANTAMINA CAMINO’S COMMITMENT 7
Slide 8: ESG Accountability
8 ESG ACCOUNTABILITY In 2021, Camino Corp. has developed its Environmental and Social Governance strategy and completed its ESG disclosure submission with Digbee Ltd.’s inaugural reporting cycle. The annual submission requires thorough evidence- backed disclosure of the company’s environmental and s
Slide 9: Los Chapitos Project
9 LOS CHAPITOS PROJECT
Slide 10: Los Chapitos – Drilling Campaign 2022 – Part 1
LOS CHAPITOS – DRILLING CAMPAIGN 2022 – PART 1 HTTPS://YOUTU.BE/YTXWXPVWQ3M 10
Slide 11: Los Chapitos – Drilling Campaign 2022 – Part 2
LOS CHAPITOS – DRILLING CAMPAIGN 2022 – PART 2 HTTPS://YOUTU.BE/SWS6-CS5BHC 11
Slide 12: Los Chapitos – Drilling Campaign 2022 – Part 3
LOS CHAPITOS – DRILLING CAMPAIGN 2022 – PART 3 HTTPS://YOUTU.BE/TEVXXRQ1DQ4 12
Slide 13: Los Chapitos – New Lourdes Discovery – 2022 Drilling Highlights
13 LOS CHAPITOS – NEW LOURDES DISCOVERY - 2022 DRILLING HIGHLIGHTS Camino Intercepts Satellite High-Grade Copper Lourdes Mineralized Zone with 55.5m at 0.93% Cu from Surface, including • 55.5m @ 0.93% Cu from surface, including 7.5m @ 7.5m of 2.58% Cu at Los Chapitos, Peru 2.58% Cu in DCH-97 • 65.2m
Slide 14: Los Chapitos – Adriana Extension (Carlotta) – 2020 Drilling Highlights
14 LOS CHAPITOS – ADRIANA EXTENSION (CARLOTTA) - 2020 DRILLING HIGHLIGHTS Significant intercepts (not true width) include: DCH-071 55.5 m of 0.72% copper (Cu) (incl. 22.5 m @ 1.15% Cu) from 99.5 m depth DCH-074 64.5 m of 0.6% Cu (incl. 12 m @ 1.05% Cu) from 22 m depth DCH-066 92.1 m of 0.53% Cu (inc
Slide 15: Los Chapitos – Adriana (Main Zone) Drilling Highlights
15 LOS CHAPITOS –ADRIANA (MAIN ZONE) DRILLING HIGHLIGHTS Pad 1 to Pad 4 extend over 350m strike length of Diva Trend. Diva Trend extends for 7 KM. Significant copper intercept highlights (not true thickness) for Pad 1, Pad 2A and Pad 4 include: DCH-001 (Pad 1) 55.3m @ 0.73% Cu from 7.2m depth AND 33
Slide 16: Geological Age Similar to Marcona and Mina-Justa Mines
16 GEOLOGICAL AGE SIMILAR TO MARCONA AND MINA-JUSTA MINES - LOS CHAPITOS Intrusives: 150 – 160 Million years old. Mineralization: 105 Million years old.
Slide 17: New Permits and New Copper Exploration Targets at Los Chapitos
17 NEW PERMITS AND NEW COPPER EXPLORATION TARGETS AT LOS CHAPITOS
Slide 18: Infrastructure to Build a Mine
18 INFRASTRUCTURE TO BUILD A MINE (SIMILAR TO MARCONA AND MINA-JUSTA) 1. Power: 510KV lines over the property 2. Water: seawater processing 15km to project 3. Access: 40 minutes from Pan American Highway (mining and transport Town of Chala) Source: Esri, Garmin, GEBCO, NOAA NGDC, and other contribut
Slide 19: Los Chapitos Preliminary Metallurgical Column Test Results
19 LOS CHAPITOS PRELIMINARY METALLURGICAL COLUMN TEST RESULTS (SGS Minerals S.A. Santiago) Oxide Composites to depths of approximately 300m • 74% Cu average recoveries for composite head grade of 0.80% Cu from 3 Column Tests • 73% to 76% Cu recoveries from Bottle Roll tests • Preliminary acid consum
Slide 20: Mina Justa vs Los Chapitos
20 MINA JUSTA VS LOS CHAPITOS 347 Mt – Cu 0.71%, Au 0.03 g/t
Slide 21: Maria Cecilia Project
21 MARIA CECILIA PROJECT
Slide 22: Maria Cecilia – Introduction
MARIA CECILIA - INTRODUCTION HTTPS://YOUTU.BE/CFRTAB9XQQO 22
Slide 23: Maria Cecilia – Where Does Copper Come From?
MARIA CECILIA – WHERE DOES COPPER COME FROM? HTTPS://YOUTU.BE/9BQWX3YGCHE 23
Slide 24: Mineral Resource Statement for Toropunto and Emmanuel projects
24 Mineral Resource Statement for Toropunto and Emmanuel projects (8.9 US$/t NSR cut-off), Ancash Department, Peru, SRK Consulting (Peru) S.A., December 2020 Project Category Tonnes (Mt) CuEq (%) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) (%) Toropunto Inferred 32.0 0.215 0.14 0.06 5.75 4.7 Emmanuel Inferred
Slide 25: Maria Cecilia – Porphyry Complex and NI43-101 Resources
25 MARIA CECILIA – PORPHYRY COMPLEX AND NI43-101 RESOURCES Source: Independent National Instrument 43- 101 Technical Report for the Toropunto, Emmanuel and Maria Cecilia Projects, Peru, prepared by SRK Consulting (Peru) S.A. 20D85301, December 2020
Slide 26: Maria Cecilia Project
9 TEPER SIT FETA oe ES 2 ng} MARIACECILIA A \ Wages PSD PROJECT “MARIA CECILIA PROJECT LEGEND eommaTES mania ceciLia ‘CENTERS PROPERTY CONCESSION mi eeenna (ia)ororrom am sas eS ® see ‘TRANSMISSION _ <u HIGHWAY 26
Slide 27: Maria Cecilia Porphyry & Skarn Zone Target
27 MARIA CECILIA PORPHYRY & SKARN ZONE TARGET NW-SE 330-340° oriented strip, with an approximate length and width of 2 km by 250m; Zone has copper anomalies that range from 500 ppm up to 6.7% Cu including 110 g/t Ag; Chip sampling of 3 trenches returned grades up to 1.0% copper, including 27.5m @ 0.
Slide 28: Located in Prolific Mining Jurisdiction
28 LOCATED IN PROLIFIC MINING JURISDICTION Maria Cecilia is located in a metallogenic environment in the Cordillera Negra mountain that trend NW-SE with similarities to metallogenic environments near other exploration properties and producing mines: • Antamina 100km to the east (copper producer) • E
Slide 29: Plata Dorada Project
29 PLATA DORADA PROJECT
Slide 30: Plata Dorada Project Highlights
30 PLATA DORADA PROJECT HIGHLIGHTS High Grade Copper-Silver Project; 100% Ownership; Concessions totalling 3,800 Ha; Located 158 km east of Cuzco from paved highway to Brazil; Accessible all year round by paved highway and all-weather dirt roads.
Slide 31: Plata Dorada Exploration
31 PLATA DORADA EXPLORATION Exploration work at Plata Dorada identified new vein structures, with over 70 channel samples tested for metal content. Best Results of the 2020 Geochemical Sampling Campaign included 5.76% Cu and 1,500 g/t Ag. The Company now plans to continue to develop a 1:2000 geologi
Slide 32: Plata Dorada Results
32 PLATA DORADA RESULTS Copper values ranging from 0.3% to 8.7%; Silver values ranging from 70 g/t to over 1,500 g/t; Gold present in trace amounts; Multiple veins sets and individual strike lengths are in excess of 100 m; Fieldwork goals are to identify potential extensions under cover. For further
Slide 33: Plata Dorada Polymetallic Ag-Cu-Au Mineralization
33 PLATA DORADA POLYMETALLIC AG-CU-AU MINERALIZATION Copper, silver, gold, zinc, and lead have rock chip sample grades up to 1,565 g/t silver (Ag), 0.67 g/t gold (Au), 1.19% copper (Cu), 32% zinc (Zn), and 18.25% lead (Pb) Rock chip samples range in width from 0.2 to 2.0 m across the veins
Slide 34: Known Veins Are Well-Exposed
34 KNOWN VEINS ARE WELL-EXPOSED. POTENTIAL TO DISCOVER NEW VEINS ON THE PLATA DORADA PROPERTY. PERSON
Slide 35: Copper Price Projections
35 COPPER PRICE PROJECTIONS To prevent inventory depletion and enable exploration and discovery, the price of copper, a long-cycle commodity, is estimated to require incentive pricing of $15,000/t. Sources: Goldman Sachs Global Investment Research, World Bank, Wind, Woodmac
Slide 36: Peru in Top 10 – New and Probable Copper Mines
36 PERU IN TOP 10 – NEW AND PROBABLE COPPER MINES
Slide 37: Share Structure
37 SHARE STRUCTURE OWNERSHIP STRUCTURE December 31, 2022 CURRENT SHARES OUTSTANDING 173,330,067 15% Denham Capital MANAGEMENT AND INSIDERS ~12% WARRANTS 11% Delbrook Capital • 22,058,821 @ $0.25 Expiring May 18, 2023 • 1,470,588 @$0.25 Expiring July 13, 2023 25,381,642 55% • 1,852,233 @$0.25 Expirin
Slide 38: Management and Directors
Management and Directors 38 JAY CHMELAUSKAS, BASc Geol. Eng., OLAV LANGELAAR BASc Mech Eng., P.Eng., MBA MBA Director CEO, President, Director • Managing Director at Dundee Goodman Merchant Partners, a division of • Former CEO of start-up to production Goodman & Company, Investment Counsel Inc. comp
Slide 39: Jay Chmelauskas, CEO, President & Director
Jay Chmelauskas BASc, MBA CEO, President & Director jayc@caminocorp.com 1.604.493.2058 Executive Offices Suite #1780, 555 W Hastings Street Vancouver, BC V6B 4N4, Canada www.caminocorp.com info@caminocorp.com
Camino Minerals — Investor Presentation (January 2023) on 6ix