Prince Silver Corp. · CSE:PRNC

Prince Silver — Investor Presentation (September 2026)

18 slides from Prince Silver's investor presentation, September 2026

  1. Slide 1: Advancing the Past-Producing Prince Silver Project in Nevada

    Advancing the September 2026 PAST-PRODUCING PRINCE SILVER PROJECT in Nevada CSE: PRNC OTCQB:PRNCF FRA: T130

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS FORWARD LOOKING STATEMENTS Certain statements in this presentation are forward-looking statements, including with respect to future plans, and other matters. Forward-looking statements consist of statements that are not purely historical, including any statements regarding

  3. Slide 3: Why Prince Silver & Why Now?

    WHY PRINCE SILVER WHY NOW? WHY PRINCE SILVER & WHY NOW? 1. PROVEN NEVADA SILVER DISTRICT 3. CLEAR PATH TO MAIDEN MINERAL RESOURCE ESTIMATE Not A n Early-Stage Exploration Story Plenty of Exploration Upside • Large-scale past-producing system with • Drilling is designed to validate an Exploration Tar

  4. Slide 4: Prince Silver Project: Modern Bulk CRD Opportunity

    PRINCE SILVER PROJECT: “MODERNBULK CRD OPPORTUNITY” PRINCE SILVER PROJECT: “MODERN BULK CRD OPPORTUNITY” LOCATION: Lincoln County, Nevada (240km north of Las Vegas) PROVEN MINING DISTRICT: Between 1912-1964 the Pioche Region produced Prince Projects Ag, Au, Mn, Pb and Zn(1) which at recent spot pric

  5. Slide 5: Past Producing Prince Silver Project

    PAST PRODUCING PRINCE SILVER PROJECT PAST PRODUCING PRINCE SILVER PROJECT RECORDED HISTORIC PRODUCTION (1912–1949) 1.12mt at 100 g/t Ag, 10.2% Mn, 4.5% Zn, 0.50 g/t Au(1), from underground mining of veins and mantos yielding ~3.6 Moz Ag, ~50 Kt Zn, ~17koz Au(1) (Mn was not a focus during this period

  6. Slide 6: Historic Prince Mine Headframe

    Historic Prince Mine Headframe Historic Prince Mine Headframe Surface Collapse of Historic Near-Surface Mined Stopes 6 6

  7. Slide 7: Prince Silver Project: Not a Small Vein System

    PRINCE SILVER PROJECT: “NOT A SMALL VEINSYSTEM” PRINCE SILVER PROJECT: “NOT A SMALL VEIN SYSTEM” SHALLOW TO DEPTH CONTINUITY Shallow Mn-rich replacement mineralization • Historic mining progressed from shallow oxides into under gently dipping limestone sulphides to 254 m (835 ft), demonstrating vert

  8. Slide 8: Drilling Ongoing: 2026 Highlight Results

    Drilling Ongoing: 2026 highlight results • PRC-37: Broad Au–Ag–Zn mineralization (268-294 m depth) 0.95 g/t Au, 28.9 g/t Ag, 1.02% Zn @ 25.91 m Includes 1.73 g/t Au, 58.1 g/t Ag, 1.96% Zn @ 9.14 m • PRC-37: High-grade Ag–Mn with Pb-Zn (238-245 m depth) 230.2 g/t Ag, 10.78% Mn, 0.58 g/t Au, 1.87% Pb,

  9. Slide 9: Cross Sections Through Stratigraphic Units

    CROSS SECTIONS THROUGH STRATIGRAPHIC UNITS CROSS SECTIONS THROUGH STRATIGRAPHIC UNITS Units Units TARGETING DEEPER UNITS IN 2026 • Past production focused on mining the upper horizons: Lyndon Limestone, Upper Shale units and the CM Bed • Historically left the deeper P i o c h e S h a l e u nits unto

  10. Slide 10: Doubled Land Position in 2026

    DOUBLED LAND POSITIONIN2026 DOUBLED LAND POSITION IN 2026 LAND POSITION MORE THAN DOUBLED • Staked ~656 new acres, more than doubling the land package at the Prince Silver Project. CLAIMS ADDED ALONG PROVEN MINERAL TREND • New claims lie directly along the Great Western Fault corridor, the primary c

  11. Slide 11: Unlocking Potential

    UNLOCKING POTENTIAL What’s driving the project forward in 2026? Key Catalysts Q1 Q2 Q3 Q4 PHASE 1 DRILLING RESULTS Releasing assay results from January – June from 9,000m program. EXTENDED PHASE 1 DRILLING PROGRAM Infill, step-out and depth testing to expand mineralized footprint. PHASE 1 DRILLING R

  12. Slide 12: Silver Developers - EV/Ag Eq

    SILVER DEVELOPERS - EV/AG EQ As of September 15, 2026. Based on Global NI 43-101 Resources = Measured + Indicated + Inferred. EV/AgEq Moz Mkt Cap (C$M) $4.54 $1,840 $3.80 $2.07 $2.03 $1.35 $598 $1.08 $1.05 $435 $446 $222 $0.31 $155 $175 $120 $23 Vizsla Silver Corp Backrock Silver Aftermath Silver Si

  13. Slide 13: US Critical Minerals Advantage

    • Sept 15, 2026: Bitterroot (TSX.V: BTT) secures US$5.22 M from US Department of War under the Defense Production Act (DPA) Title III for its LM N-Cu project in Michigan. • Feb. 24, 2026: Lithium Americas Corp. (TSX: LAC; NYSE: US CRITICAL LAC) received a US$432 million U.S. DOE loan advance on for

  14. Slide 14: Stampede Gap Project

    STAMPEDE GAP PROJECT STAMPEDE GAP PROJECT A District-Scale Cu-Mo Porphyry and Skarn System + Distal Pb-Zn-Ag-Au System EXTENSIVE PORPHYRY SYSTEM • The Stampede Gap Cu-Au-Mo Project is an underexplored porphyry system that has the hallmarks of a large-scale copper-molybdenum deposit. • Evidence sugge

  15. Slide 15: Capital Structure

    CAPITAL STRUCTURE As of September 15, 2026 CAPITAL STRUCTURE As of September 15, 2026 OWNERSHIP Shares Issued & Outstanding 59.1 million Newsletter Institutional, Writers, 5% 12% Options (Avg. $0.51/share) 4.0 million Founders & Insiders, 26% Warrants (Avg. $0.62/share) 11.9 million (1) Contingent R

  16. Slide 16: Management & Directors

    MANAGEMENT DIRECTORS MANAGEMENT & DIRECTORS DEREK IWANAKA RALPH SHEARING CEO & Director President & Director Derek is a mining-sector executive with over 23 years of Former CEO and Founder of Luca Mining and, current CEO of investor relations, corporate development, and capital Goldgroup Mining, a g

  17. Slide 17: An Undervalued Silver Asset

    ANUNDERVALUED SILVER ASSET AN UNDERVALUED SILVER ASSET In the mine-friendly "Silver State" of Nevada, LOW RISK TIER 1 MINING JURISDICTION a recognized region for world-class Ag-Au projects. LEVERAGED TO CRITICAL MINERALS Prince offers rare, U.S.-based leverage to 5 critical and strategic minerals: s

  18. Slide 18: Contact Us

    CONTACT US CONTACT US Derek Iwanaka, CEO & Director info@princesilvercorp.com princesilvercorp.com CSE: PRNC OTCQB: PRNCF FRA: T13

Prince Silver — Investor Presentation (September 2026) on 6ix